ALMADEN MINERALS (AMEX: AAU) HUB ON AGORACOM. WELCOME, AND EDUCATE YOURSELF ABOUT HOW ALMADEN'S MODEL IS ENVIABLE AND SHOULD BE VERY PROFITABLE IN THIS GOLD BULL MARKET
TSX:AMM
  • Demo Video
  • Private Messages
  • Edit My Profile
  • View/Edit Portfolio

AGORACOM News Flash

AGORACOM WIRE - MONDAY MAY 28TH, 2012

SONOMAX completes $3 million equity financing

FOCUS METALS (TSXV:FMS) Changes Its Name to Focus Graphite Inc. Read More   |   *SPONSOR

INTERNATIONAL PBX VENTURES (TSX:PBX) Signs Copaquire Joint Venture Option Agreement - $90M Potential Payment Read More

LOMIKO METALS (TSXV:LMR) Graphite and Zinc Price Outlook is Favourable Through 2013  Read More   |   *SPONSOR

 

 

Message: Caballo Blanco Progress Report

2nd shots 1 002
Rank: [?]
President
Points: [?]
23987
Rating: [?]
Votes: 222 Score: 3.5
  • Currently 3.6/5 Stars.
Did you know? You can earn activity points by filling your profile with information about yourself (what city you live in, your favorite team, blogs etc.

Caballo Blanco Progress Report

posted on Apr 08, 09 02:17PM
April 8, 2009
Almaden Minerals Ltd.: Caballo Blanco Progress Report
VANCOUVER, BRITISH COLUMBIA--(Marketwire - April 8, 2009) - Almaden Minerals Ltd. ("Almaden", "the Company") (TSX:AMM)(NYSE Alternext US:AAU)(NYSE Amex:AAU.A) wishes to report that its operating partner Canadian Gold Hunter Corp. ("CGH")(TSX:CGH) has released some further drilling results from a work program on the company's Caballo Blanco project located in Mexico. CGH has informed Almaden that drilling on the project has now ceased. The drill program pertaining to this news release commenced in November, 2008 at which time CGH announced that it would consist of a first phase of 5,000 meters to be expanded to 10,000 meters. Since November 14 holes were completed for a total of 3,603 meters. This is the second news release pertaining to the program. An earlier release in February (see Almaden news release of February 6, 2009) reported results from the first 5 holes of this program which included an intersection of 36.6 meters grading 1.13 g/t gold. Almaden has not yet received the complete assay and location database for all the new holes however at this time Almaden wishes to release the information CGH has provided and released.

J.D. Poliquin, Chairman of Almaden commented, "While Almaden had hoped for more drilling to have been completed by this point these new results help confirm the presence of a large well mineralized gold system."

Significant assays from the latest drilling are tabulated below.

--------------------------------------------------------------------------
                            Depth         Interval    Width     Au      Ag
Drill Hole      Az/Angle       (m)           (m)(i)   (m)(i)   g/t     g/t
--------------------------------------------------------------------------

--------------------------------------------------------------------------
09CBN-034    086 degrees/  153.62    118.57-153.62    35.05   0.48     0.4
             -60 degrees 
--------------------------------------------------------------------------
including                            124.66-142.95    18.29   0.66     0.3
--------------------------------------------------------------------------
09CBN-035    221 degrees/  299.17     97.54-109.73    12.19   0.63     0.4
             -88 degrees
--------------------------------------------------------------------------
and                                  286.51-297.18    10.67   0.40     1.6
--------------------------------------------------------------------------
09CBN-037    280 degrees/  298.70     92.96-192.02    99.06   0.32     0.8
             -84 degrees
--------------------------------------------------------------------------
including                             94.49-135.63    41.14   0.53     0.7
--------------------------------------------------------------------------
                                                            Au g/t    Cu %
--------------------------------------------------------------------------
09CBN-042    088 degrees/  367.89    224.64-367.89   143.25  0.103   0.105
             -57 degrees
--------------------------------------------------------------------------
(i) Intervals are core lengths and true widths may be less than reported
    here.
Drill holes 09CBN-034, 035, 037 and 041 tested the southwestern portion of the Cerro la Paila gold target. Previous drilling on this portion of Cerro la Paila intersected encouraging gold values such as 89.9 metres grading 1.06 g/t gold in hole 08CBN-011 and 94.5 metres grading 2.09 g/t gold in 08CBN-004.

One drill hole 09CBN-036 tested the Cerro la Cruz target, which is located about one kilometre south of Cerro la Paila in the Northern Zone. Cerro la Cruz is underlain by massive and brecciated silica and is defined by a large resistivity anomaly. Three holes (09CBN-038, 039 & 040) tested the Cerro Bandera target in the Northern Zone. This target consists of massive and brecciated silica and is defined by two large resistivity anomalies. CGH announced that while the limited drilling on Cerro La Cruz and Cerro Bandera did not intersect significant gold mineralization, its management considers that further testing is warranted on these targets. Almaden emphatically agrees with this assessment. These areas are large and have many similar geochemical and geophysical responses to the Cerro La Paila area of the project. Almaden interprets that the potentially mineralized areas are covered with barren alteration at Cerro La Cruz and Cerro Bandera and that, in the context of Cerro La Paila, much further drilling is needed in these areas. Another area of high sulphidation style alteration and mineralization called the Highway Zone remains to be tested.

Drill hole 09CBN-042 tested the eastern extension of the Pedrero target. This hole intersected a large intensely altered diorite with intense quartz stockwork and encouraging gold and copper values. Pedrero is a large gold-rich porphyry copper system that remains open to further testing.

Under the terms of a 2007 agreement, CGH has an option to earn a 70% interest in the Caballo Blanco project from Almaden by issuing 1 Million shares of CGH (completed), making a US$500,000 payment (completed), spending US$12.0 Million on the project over 6 years and funding all ongoing costs required for the completion of a feasibility study.

As CGH is the operator, the geological data in this news release were verified by qualified person Jan Christoffersen, P. Eng., Vice President of Canadian Gold Hunter Corp. Appropriate quality control and quality assurance protocols are utilized on the program. Standard reference samples and various duplicates are inserted in each batch of assays. Drill core samples are cut by saw on site and sample splits are shipped for preparation to ALS Chemex in Guadalajara, Mexico. Sample pulps are sent to ALS Chemex in North Vancouver, B.C., Canada and analyzed for gold by fire assay and for silver and 34 other trace and major elements by ICP-MS in accordance with standard industry practices.

On Behalf of the Board of Directors

Morgan J. Poliquin, M.Sc., P.Eng., President, COO and Director

Almaden Minerals Ltd.

New Message

Please login to post a reply

AGORACOM Quick Tips

Start A New HUB. Control. Quality. Refreshing. ... Start One Now

President's D.D.

New feature: Hub Presidents can add important links here.

Stock Quote

Hub Leaders