Welcome to the Connacher Oil and Gas Hub on AGORACOM
Connacher is a growing exploration, development and production company with a focus on producing bitumen and expanding its in-situ oil sands projects located near Fort McMurray, Alberta
  • Demo Video
  • Private Messages
  • Edit My Profile
  • View/Edit Portfolio

AGORACOM News Flash

AGORACOM WIRE .... TUESDAY FEBRUARY 14TH

UPDATE 1:30PM

Graphite is the Emerging Investment Story of 2012

Graphite Investment Conference Vancouver

Hotel Vancouver | BC BALLROOM | 2-4 PM | February 23, 2012 - Attendance is free

Find out more today!

Breaking News ....

Strike Graphite Corp. (TSXV:SRK) Acquires Wagon Graphite Project in Quebec in Vicinity of Timcal's Lac des Iles Graphite Mine *CLIENT Read More  |  Profile

Strike Graphite goes "Beyond the Press Release"

McLaren Resources (CNSX:MCL) Drills 7.0 Grams Gold Over 7.4 Metres at the TimGinn Property Located Adjacent to the Hollinger Mine *CLIENT* Read More | Watch Beyond the Press Release

 AGORACOM Launches GraphiteStocksBlog.com

We're proud to announce the launch of GraphiteStocksBlog.com a website dedicated to the needs of investors and companies in the fast growing Graphite industry.

INAUGURAL GRAPHITE SPONSORS

 

 

Message: "An Inconvenient Truth"

Generic_profile
Rank: [?]
Mail Room
Points: [?]
112
Rating: [?]
Votes: 2 Score: 4.0
  • Currently 4.0/5 Stars.
Did you know? You can earn activity points by filling your profile with information about yourself (what city you live in, your favorite team, blogs etc.

Re: A little bit more Positive Outlook for CLL

posted on Oct 23, 09 03:43PM

For those who havn't already seem this.

Connacher Oil and Gas Limited provides Algar update

CALGARY, Oct. 23, 2009 (Canada NewsWire via COMTEX News Network) --

Connacher Oil and Gas Limited (CLL - TSX) announces today that on October 16, 2009 a major milestone was achieved at the Algar construction site with the engineered lift of the two evaporator towers ("towers"), which constitute part of Connacher's second 10,000 bbl/d steam-assisted gravity drainage ("SAGD") plant at its Great Divide oil sands development project in northeastern Alberta.

As shown on our website at www.connacheroil.com under the caption "Algar Slideshow" and also as available at http://files.newswire.ca/574/Algar_Evaporators.pdf, the first tower, which weighed over 476,000 pounds and stands approximately 150 feet tall, approximately 40 feet taller than the evaporator towers at Pod One, was installed initially, followed by the second, smaller tower. These lifts required a sound plan, excellent teamwork, communication and cooperation among a wide range of disciplines, as well as favorable weather conditions with limited wind. The towers were transported to the site by truck, including over Connacher's newly-constructed road from Highway 63 to the plant site. This road was carved out of muskeg in a remote area and the towers were installed on reinforced concrete bases, situated on piles driven into the muskeg. The towers were each stood up in approximately four hours and are expected to be in place for approximately 25 years.

Construction at the Algar project is proceeding on time and under budget at this time, with a target to complete the plant and tie in the associated seventeen SAGD horizontal well pairs in early April 2010. Thereafter, it will take approximately one month to commission the plant and steaming of the well pairs should start in May 2010 and last approximately three months before first production in approximately August 2010.

Thereafter, rampup towards full plant capacity is anticipated to occur between startup and year end 2010 or early 2011. Completion of Algar will double Connacher's capacity at Great Divide to 20,000 bbl/d of bitumen.

Connacher is very pleased with the progress at Algar, as highlighted by this installation of the evaporator towers in a most timely and efficient manner. Barring any unforeseen problems or unduly adverse weather conditions, the company remains optimistic about the timely, cost effective completion of the Algar project and then its eventual impact on the company's production levels from the region.

Separately, with the recent closing of the $30 million flow through equity financing, after freeze-up Connacher will immediately be embarking on a multi-well core hole drilling program, primarily on the northwest portion of its main lease block at Great Divide and to a lesser extent on its 50 percent-owned Halfway Creek acreage. Additionally, 3-D seismic will be shot on Connacher acreage in the region.

New Message

Please login to post a reply

AGORACOM Quick Tips

Looking for a New Junior Zinc Explorer? ... Learn More!
Watch
Today's Show
in 00:00:000

President's D.D.

New feature: Hub Presidents can add important links here.