Welcome to the Connacher Oil and Gas Hub on AGORACOM
Connacher is a growing exploration, development and production company with a focus on producing bitumen and expanding its in-situ oil sands projects located near Fort McMurray, Alberta
  • Demo Video
  • Private Messages
  • Edit My Profile
  • View/Edit Portfolio

AGORACOM News Flash

AGORACOM WIRE - FRIDAY MAY 25TH, 2012

FOCUS METALS (TSXV:FMS) Changes Its Name to Focus Graphite Inc.

  • Aim to develop and manufacture the best technology graphite in the world
  • Additional shareholder value will come from investment in commercialized graphene through joint venture partner, Grafoid Inc.

Read More   |   *SPONSOR

INTERNATIONAL PBX VENTURES (TSX:PBX) Signs Copaquire Joint Venture Option Agreement - $90M Potential Payment Read More

AGORACOM Maintenance Alert: Friday Evening Downtime for About an Hour Read More

LOMIKO METALS (TSXV:LMR) Graphite and Zinc Price Outlook is Favourable Through 2013  Read More   |   *SPONSOR

 

 

Message: Public hearings on proposed oil pipeline from Canada begin in Montana

Generic_profile
Rank: [?]
Vice President
Points: [?]
1069
Rating: [?]
Votes: 20 Score: 3.2
  • Currently 3.3/5 Stars.
Did you know? You can earn activity points by filling your profile with information about yourself (what city you live in, your favorite team, blogs etc.

Public hearings on proposed oil pipeline from Canada begin in Montana

posted on May 16, 10 12:20AM

Public hearings on proposed oil pipeline from Canada begin in Montana

The Associated Press May 15, 2010 23:36:30 PM 0 Recommendation(s)

GREAT FALLS, Mont. - Public hearings in Montana are being held this week to discuss a plan to build a pipeline through eastern Montana to move crude extracted from Canada's oil sands to refineries in the United States.

Calgary-based TransCanada Corp. aims to start construction this year on the 1,980-mile Keystone XL pipeline.

The first of six meetings is planned for Monday in Malta. Additional meetings are set in Glasgow, Terry, Circle and Glendive. The final meeting is Thursday in Baker.

TransCanada is proposing to pay landowners for the right to install pipe 4 feet underground.

"I would like to encourage all citizens, if they have any concerns about the safety and environmental impact of this, to go to the comment periods and speak up," said Sandra Barnick, a landowner in the path of the pipeline and one of 40 members of the Northern Pipeline Landowners Group.

"What we are taking a stand on is making sure we are treated fairly and that regulations are adhered to and that there is equitable compensation for everybody along the pipeline," Barnick said.

Jeff Rauh, TransCanada spokesman, said a draft environmental study found the impact of a potential oil spill to be minimal, and the pipeline could be shut down if there were a problem.

"The risk of an oil spill is small," Rauh said. "If a spill occurred, the volume spilled would likely be small."

The pipeline would cross 220 miles of private land in Montana, 19.1 miles of state land, and 42.6 miles of U.S. Bureau of Land Management property, said Tom Ring of the state Department of Environmental Quality.

He said the state's preferred route for the pipeline is slightly different from the one proposed by TransCanada to limit impacts on stream crossings and landowners.

Under political pressure, the company said it is considering letting Montana and North Dakota crude oil into the pipeline. The company previously rebuffed calls to build an "onramp" for crude from the Bakken oil fields of Montana, North Dakota and Saskatchewan, saying there was insufficient demand.

The Bakken formation holds an estimated 3.65 billion barrels of oil, much less than the 1.7 trillion barrels of petroleum in Canada's oil sands.

___

Information from: Great Falls Tribune, http://www.greatfallstribune.com

New Message

Please login to post a reply

AGORACOM Quick Tips

Small & Micro Cap 2.0 Blog by George Tsiolis ... Read it Now

President's D.D.

New feature: Hub Presidents can add important links here.