Was at the Cambridge Conference in Toronto yesterday and chatted with R. Bick. Told me the next assays would be here within the couple of weeks, would include the assays from Carlin the bottom 70 meters of the deep hole ( 1500m). As mentioned earlier, they have 6 drill rigs on site, will be drilling for another 3 weeks or so. This years drilling phase should take us to 90 holes ( 75 this year ) with in excess of 30,000 meters for the year. On an insignificant note, the had 3 saws and 8 people preparing the cores for assay analysis.
Had an updated drill map at their booth and showing some more of the drilling try to connect Antelope and North.
Approx. 50% of the float held institutionally
Barker at his 10 minute speech mentioned everything most of us already know about this years drilling, but made a comment that this newly discovered zone between Antelope and North Stock to be the "Engine Room", that connects the zones. Alot of assays coming down the pipeline over the next 6 months or so.
That just about sums it up!
Loading...
Loading...