Nixon Fork Gold Mine Hosts Turn Key Mine Operation
NI 43-101 indicated resource of 128,500 ounces and inferred 74,600 ounces of gold
  • Demo Video
  • Private Messages
  • Edit My Profile
  • View/Edit Portfolio

Email Updates

Search

AGORACOM News Flash

AGORACOM WIRE - FRIDAY MAY 25TH, 2012

FOCUS METALS (TSXV:FMS) Changes Its Name to Focus Graphite Inc.

  • Aim to develop and manufacture the best technology graphite in the world
  • Additional shareholder value will come from investment in commercialized graphene through joint venture partner, Grafoid Inc.

Read More   |   *SPONSOR

INTERNATIONAL PBX VENTURES (TSX:PBX) Signs Copaquire Joint Venture Option Agreement - $90M Potential Payment Read More

AGORACOM Maintenance Alert: Friday Evening Downtime for About an Hour Read More

LOMIKO METALS (TSXV:LMR) Graphite and Zinc Price Outlook is Favourable Through 2013  Read More   |   *SPONSOR

 

 

Message: Fire River Gold Update on Progress of the Nixon Fork Mine Start Up

Fall_walk_oct05_012
Rank: [?]
President
Points: [?]
32329
Rating: [?]
Votes: 245 Score: 3.6
  • Currently 3.7/5 Stars.
Did you know? You can earn activity points by filling your profile with information about yourself (what city you live in, your favorite team, blogs etc.

Fire River Gold Update on Progress of the Nixon Fork Mine Start Up

posted on Aug 25, 11 10:14AM

FAU: TSX.V
FVGCF: OTCQX
FSE: FWR

VANCOUVER, Aug. 25, 2011 /PRNewswire/ - Fire River Gold Corp. and Mystery Creek Resources Inc. (TSX.V: FAU), (OTCQX: FVGCF), (FSE: FWR) (collectively "the Company") are pleased to provide this update for the Nixon Fork Mine. It provides a summary of the progress of mining and milling activities.

Mill commissioning started on July 4th 2011 and it has operated since that time at an average availability of 71%. A total of 3,078 tons of ore was processed in July and approximately 2,500 so far this month. Only gravity and flotation circuits are being operated at this time, while the CIL plant is still under construction. The current mill feed head grade is averaging approximately 20 g/t.

Over 30 tonnes of copper concentrate has been produced containing 18% Cu, 779 g/t Au, and 398 g/t Ag. A total of 21 bags of concentrate weighing 18,300 kg have been shipped to Anchorage using a Hercules L-100 aircraft.

The concentrate has been markedly improved in comparison to the last production period by increasing the grades and decreasing the moisture content as follows:

Year Cu % Au g/t Ag g/t % Moisture
2011 18.2 779 398 9.0
2007 12.6 337 184 22.8
Change 5.6 442 215 -13.8

The moisture content has been further reduced to less than 6% in the most recent bags.

Gravity separation has recovered approximately 500 ounces of gold in the gravity concentrate, which will be poured into a 30 kg doré bar.

Total gold recovery has averaged 78% (24% from gravity and 54% in the copper concentrate) which is close to expectations. By comparison, recovery averaged 68% in 2007. Total gold recovery will increase substantially with the addition of leaching as a third gold recovery process.

Approximately 4,000 tonnes of ore has been mined to-date from five stopes using room and pillar extraction. The mine is currently producing approximately 170 tonnes per day at a grade of 18 g/t.

The property is evaluating other stoping methods, including longhole to reduce costs and increase productivity. Equipment has been acquired to test these other methods, including a remote control scooptram and drill buggy. Non-explosive ore extraction is also being tested using scaling machines with considerable success.

The Qualified Person for this news release is Richard Goodwin, P.Eng, President & C.O.O for Fire River Gold.

On behalf of the Board of Directors,

(Signed)

Richard Goodwin
President & C.O.O.

Certain information regarding the Company including management's assessment of future plans and operations, may constitute forward-looking statements under applicable securities laws and necessarily involve risks associated with mining exploration and development, volatility of prices, currency fluctuations, imprecision of resource estimates, environmental and permitting risks, access to labour and services, competition from other companies and ability to access sufficient capital. As a consequence, actual results may differ materially from those anticipated in the forward-looking statements. A feasibility study has not been completed and there is no certainty the disclosed targets will be reached nor that the proposed operations will be economically viable. Neither TSX Venture Exchange nor its Regulation Services Provider (as that term is defined in the policies of the TSX Venture Exchange) accepts responsibility for the adequacy or accuracy of this release. We seek safe harbour.

SOURCE Fire River Gold Corp.

Source: PR Newswire (August 25, 2011 - 9:30 AM EDT)

New Message

Please login to post a reply

AGORACOM Quick Tips

Recent Drill Results: 63m of 1.21 g\t gold and 2m of 13.95 g/t gold ... Learn More!

President's D.D.

New feature: Hub Presidents can add important links here.