grassroots & advanced systematic exploration

Holds majority interests in 135 projects - Saskatchewan, Ontario and Quebec.

Free
Message: News

News

posted on Oct 19, 2009 10:15AM

Canadian Company Press Releases

GZZ 2009-10-19 (provided courtesy of Marketwire.)
register to receive future releases by email from Marketwire


Golden Valley Mines-Significant New Gold Mineralization Intersected on the CHL Porphyry Intrusion and Shaft Zone


Osisko Reports Drilling Results from the Malartic CHL Prospect

New Drillhole Results include 15.0 metres averaging 8.6 g/t Au

VAL-D'OR, QUEBEC--(Marketwire - Oct. 19, 2009) - Golden Valley Mines Ltd. 
("Golden Valley Mines" or the "Company")(TSX VENTURE:GZZ) is pleased to 
announce the results from thirty-two (32) drillholes totalling 7,175 metres 
from the 2008 drill program targeting the CHL Porphyry Intrusion and the 
Shaft Zone on the Malartic CHL Prospect, currently optioned to Osisko 
Mining Corporation (TSX:OSK) (FRANKFURT:EWX). Additional results from a 
group of forty-one (41) drillholes totalling 7,175 metres are anticipated 
to be released over the next 6 weeks with respect to the CHL Porphyry 
Intrusion and the Shaft Zone.

The results include some of the highest grade intersections over 
significant widths encountered to date on the property. Highlights include 
15.0 metres averaging 8.6 g/t Au (CHL08-2061), 29.5m averaging 3.39g/t Au, 
with 1.5m averaging 38.40g/t Au (CHL08-2101), 52.5m averaging 0.89g/t Au, 
with 19.5m averaging 1.02g/t Au (CHL08-2128) and, 18.0m averaging 1.55g/t 
Au with 1.5m averaging 7.5g/t Au (CHL08-2131).

In conjunction with the results released on September 10, 2009 and April 
17, 2008, the total strike length tested to date on the Malartic CHL 
Prospect is approximately 1.4 kilometres. The Malartic CHL Prospect is 
located approximately 3.0 kilometres east-northeast of the Canadian 
Malartic deposit, currently under development by Osisko, and 1.6 kilometres 
east of the South Barnat deposit.

Drilling intersected a series of near surface and deeper gold mineralized 
zones across the CHL Porphyry Intrusion and the Shaft Zone. Assay results 
are summarized in the table below and on the attached drillhole compilation 
map:

/T/

The CHL Porphyry Intrusion

-------------------------------------------------------------------------
Hole No.    Section       Dip/Az    From (m)   To (m)  Length (m)  Au g/t
-------------------------------------------------------------------------
CHL08-2054   716797  -72/47 degrees   142.0    146.0         4.0     0.91

CHL08-2057   716859 -72/227 degrees    90.3     95.6         5.3     1.96
 Including                             92.7     95.6         2.9     3.16

CHL08-2059   716859 -45/227 degrees    46.5     51.0         4.5     0.81

CHL08-2060   716915 -72/227 degrees   135.6    141.4         5.8     0.94
  And                                 195.5    233.0        37.5     0.60
CHL08-2061   716915 -64/227 degrees   115.0    130.0        15.0      8.6
 Including                            118.0    122.3         4.3     16.1
 Including                            125.5    130.0         4.5     12.0

CHL08-2128   716985  -72/47 degrees   154.5    169.5        15.0     0.71
  And                                 208.5    216.0         7.5     0.57
  And                                 244.5    247.5         3.0     1.85
  And                                 271.5    324.0        52.5     0.89
 Including                            304.5    324.0        19.5     1.02

CHL08-2131   717071 -72/227 degrees   113.0    116.0         3.0     0.64
  And                                 125.0    129.5         4.5     0.54
  And                                 158.5    161.5         3.0     0.50
  And                                 208.0    211.0         3.0     0.70
  And                                 253.0    272.5        19.5     0.58
  And                                 284.5    302.5        18.0     1.55
 Including                            289.0    290.5         1.5      7.5
  And                                 334.0    340.0         6.0     0.85

CHL08-2133   717136 -53/227 degrees    99.0    102.0         3.0     1.29

CHL08-2138   717097 -51/227 degrees   131.0    134.0         3.0     1.39
  And                                 182.0    185.0         3.0     1.02
-------------------------------------------------------------------------

The Shaft Zone

-------------------------------------------------------------------------
Hole No.    Section       Dip/Az    From (m)   To (m)  Length (m)  Au g/t
-------------------------------------------------------------------------
CHL08-2092B  716600   -46/2 degrees   207.0    211.5         4.5     1.13

CHL08-2095   716650   -46/2 degrees   129.0    130.0         1.0     5.20
  And                                 135.3    139.4         4.1     3.80
 Including                            135.3    136.5         1.2     9.23

CHL08-2098   716700   -46/2 degrees    14.0     18.5         4.5     1.24
  And                                 174.0    201.0        27.0     1.24
 Including                            174.0    175.5         1.5     8.04

CHL08-2100   716700   -75/2 degrees   148.0    154.0         6.0     3.11

CHL08-2101   716752   -46/2 degrees   107.5    123.0        15.5     0.94
 Including                            122.0    123.0         1.0     5.29
  And                                 154.5    184.0        29.5     3.39
 Including                            159.0    166.5         7.5     9.52
  With                                160.5    162.0         1.5     38.4
CHL08-2102   716750   -63/2 degrees   125.5    128.0         2.5     1.68
  And                                 147.0    160.5        13.5     0.88
 Including                            148.0    149.0         1.0     4.52

CHL08-2103   716752   -75/2 degrees    28.5     42.0        13.5     0.72

CHL08-2105   716784 -64/272 degrees    58.0     64.0         6.0     0.58

CHL08-2106   716800   -61/2 degrees   201.5    206.0         4.5     1.13

CHL08-2107   716850   -46/2 degrees   178.0    185.5         7.5     0.56
  And                                 221.5    226.0         4.5     0.81
  And                                 245.5    249.5         4.0     1.10
  And                                 264.5    267.5         3.0     0.87

CHL08-2108   716850   -59/2 degrees   201.0    208.5         7.5     0.75
  And                                 228.0    240.0        12.0     0.41
  And                                 243.0    259.5        16.5     1.40

CHL08-2119   716900   -61/2 degrees    18.0     21.0         3.0     0.89
  And                                  52.5     57.0         4.5     0.93

CHL08-2120   716900   -73/2 degrees    70.5     78.0         7.5     0.64
  And                                   76.5    78.0         1.5     1.09
-------------------------------------------------------------------------

/T/

Drillholes CHL08-2054 to CHL08-2061 (table above) represent a 120 metre 
west-east section across the southwestern margin of the CHL Porphyry 
Intrusion, and holes CHL08-2128 to CHL08-2138 represent a 150 metre 
west-east section across the eastern margin of the CHL porphyry intrusion. 
Both sections are located between the Jeffrey Zone to the southeast and the 
Shaft Zone to the northwest. Drilling generally comprised 3 holes per 
set-up along the western margin of the CHL Porphyry Intrusion and single or 
2-hole set-ups within the central core and eastern margins of the CHL 
Porphyry Intrusion.  The higher grade zone in drillhole CHL08-2061 was 
closed at depth and near surface with holes CHL08-2060 and CHL08-2062, but 
remains open along strike near the contact of the CHL Porphyry Intrusion 
and ultramafic schists.

Mineralized intersections from the drillholes (CHL08-2092B to CHL08-2120 
listed in table above) targeting the Shaft Zone are all from the deeper 
portion of the zone or from zones of lower grade disseminated 
mineralization located in the CHL Porphyry Intrusion immediately south of 
the Shaft Zone. These new drill results, along with previously reported 
intersections from the Shaft Zone, presently suggests a minimum 150 metre 
strike length of unknown true width.

Mineralization along the CHL Porphyry Intrusion consists of disseminated 
pyrite-gold in strongly potassic altered quartz-feldspar porphyry dikes in 
contact with a predominately ultramafic flow sequence, and in subordinate 
gabbro and sedimentary units. Narrower, higher-grade mineralization is 
hosted in quartz veins; brecciated and silicified porphyry and/or 
talc/chlorite altered and sheared ultramafic rocks.

Current structural interpretation by Osisko indicates that the Jeffrey and 
Shaft Zones are located at the southeastern and northwestern extremities, 
respectively, of the CHL Porphyry Intrusion, which has been deformed into a 
Z-shaped body by sinistral strike-slip motion along the Cadillac-Larder 
Lake Fault Zone. The geological model suggests potential for additional 
mineralization along dilation zones at the contact between the porphyry and 
the ultramafic schists.

A very similar structural setting occurs at the recently opened Lapa Mine, 
Agnico-Eagle's highest-grade gold mine (3.8 million tonnes of proven and 
probable reserves grading 8.8 grams of gold per tonne and containing 1.1 
million ounces of gold; Agnico Eagle Mines Limited website). At the Lapa 
deposit, many of the gold-mineralized zones are located in the hinges of 
fold structures and displaced by numerous minor faults within quartz veins 
and biotite-sericite altered and deformed volcanic rocks (mafic to 
ultramafic schists) that are associated with sheared feldspathic dikes 
straddling the eastern strike extension of the Cadillac-Larder Lake Fault 
Zone on the Malartic CHL Prospect.

All NQ or HQ core assays reported above were obtained by standard 50 gram 
fire assaying-AA finish or gravimetric finish at ALS Chemex laboratories in 
Val d'Or, Quebec. Reported weighted averages were calculated using a 
minimum of 0.40g/t Au over successive maximum intervals of 20 metres with 
no upper cut-off of individual assays. Intersected drifts or lost core 
within mineralized intersections were incorporated as blank intervals.

Osisko has the right to acquire a 70% interest in the Malartic CHL Property 
in consideration for $150,000 in cash payments over a four year period 
(paid) and by completing a minimum $2,000,000 in exploration work over a 
four year period. Upon earning its 70% interest, Golden Valley Mines will 
maintain a free-carried interest of 30% to production. Drilling completed 
to date by option/joint venture partner and operator Osisko included 19,746 
metres (101 drillholes) on the property in 2008 and 15 holes totalling 
6,544 metres in 2007 (total drilling to date: 26,290-metres).

Also, Osisko purchased a claim block from Golden Valley Mines located 
immediately southeast of the Canadian Malartic Mine. Terms of the 
acquisition included a cash payment of $100,000 at signing to allow Osisko 
to earn a 100%-interest subject to a 2% net smelter royalty payable to 
Golden Valley Mines.  This claim block covers the Charlie Zone.

About Golden Valley Mines Ltd.: The Company typically tests initial 
grassroots targets while owning a 100% interest and then seeks partners to 
continue exploration funding. This allows the Company to continue its 
generative programs and systematic exploration efforts at other 
majority-owned grassroots projects. As of October 16, 2009, the Company 
holds majority property interests in 141 projects consisting of 3,715 
mining (221,516 hectares) and 3 projects consisting of approximately 710 
km2 in the Republic of Sierra Leone.

Mr. Michael P. Rosatelli, P.Geo. and Vice-President, Exploration and Mr. 
Glenn J. Mullan, P. Geo., President, CEO, and Chairman of Golden Valley 
Mines, are the Qualified Persons (as that term is defined in National 
Instrument 43-101) who have reviewed this news release and are responsible 
for the technical information reported herein.

Forward-Looking Statement: This news release contains certain 
forward-looking statements. These forward-looking statements are subject to 
a variety of risks and uncertainties beyond the Company's ability to 
control or predict and are not to be interpreted as guarantees for future 
performance. These forward-looking statements could cause actual events or 
results to differ materially from those anticipated in such forward-looking 
statements. All forward-looking statements speak only as of the date of 
this news release and the Company does not undertake any obligation to 
update or publicly release any revisions to such forward-looking statements 
to reflect events, circumstances, or changes in expectations after the date 
hereof, except as required by law. Accordingly, readers should not place 
undue reliance on such forward-looking statements.

A map is available at the following address: 
http://file.marketwire.com/release/GZZ_2009-10-19_Malartic-CHL_EN_Map.pdf

-30-

FOR FURTHER INFORMATION PLEASE CONTACT:

Golden Valley Mines Ltd.
Glenn J. Mullan
Chairman, President, and CEO
Toll Free: 877-879-1688 ext. 1222
[email protected]
or
Golden Valley Mines Ltd.
Michael P. Rosatelli
Vice President, Exploration
819-824-2808 ext. 205
[email protected]

Neither TSX Venture Exchange nor its Regulation Services Provider (as that 
term is defined in the policies of the TSX Venture Exchange) accepts 
responsibility for the adequacy or accuracy of this release.

/> http://imagen03.247realmedia.com/RealMedia/ads/Creatives/247Canada/2009-0623-Microsoft-77-All/STGO_160x600_EN.SWF/1254770617?clickTag=http://network-ca.247realmedia.com/RealMedia/ads/click_lx.ads/Adviceforinvestors.com/News/L22/47139204/x10/247Canada/2009-0623-Microsoft-77-All/STGO_160x600_EN.flash.html/5445656f6c30714b6f44634144664c55?http%3A%2F%2Fclk.atdmt.com%2FCAM%2Fgo%2F177834637%2Fdirect%2F01%2F" />
Share
New Message
Please login to post a reply