AGORACOM WIRE - FRIDAY MAY 25TH, 2012
FOCUS METALS (TSXV:FMS) Changes Its Name to Focus Graphite Inc.
Read More | *SPONSOR
INTERNATIONAL PBX VENTURES (TSX:PBX) Signs Copaquire Joint Venture Option Agreement - $90M Potential Payment Read More
AGORACOM Maintenance Alert: Friday Evening Downtime for About an Hour Read More
LOMIKO METALS (TSXV:LMR) Graphite and Zinc Price Outlook is Favourable Through 2013 Read More | *SPONSOR
-- Indicated Resources: 63.5 million tonnes -- Inferred Resources: 89.6 million tonnes -- Speculative Resources: 18.7 million tonnes
-- The most significant coal zone intervals occurred in the Niska sub-basin
in holes BD10-119 and BD10-136 with true, aggregate thicknesses of
approximately 64.3 metres and 126.5 metres respectively. Two in-fill
holes (BD10-124 and 140) were drilled at previously defined Chemong 03
and Pasquia 02 coal deposits which confirmed the significant true
aggregate thickness of 74.0 and 53.0 metre coal zone intercepts,
respectively.
-- Infill drilling has given better definition to the Niska 107 and 108
deposits where the emphasis was on upgrading Inferred Resources to
Indicated Resources. A majority of the 89.6 million tonnes of Inferred
Resource at Niska are expected to be converted to Indicated Resources.
-- Winter drilling identified a new coal deposit at Niska (1 metres) and a
second one at Leaf Lake (2 metres). 27 drill holes totalling 3,768
metres were drilled at Border. Fourteen drill holes intercepted
aggregate coal zone thicknesses ranging up to 126.5 metres. Those holes
that did not intercept coal were generally on the periphery of known
coal deposits. Of the 27 holes, 3 were drilled for geotechnical and
hydrological data.
-- A total of 177 coal samples were sent to Loring Labs in Calgary, Alberta
for proximate analyses and additional testing.
-- Two geotechnical and one hydrological drill holes were completed, the
results of which will be used in the Preliminary Economic Assessment
(PEA) that is currently underway.
-- Marston Consultants of Calgary, AB and EBA Engineering Consultants (EBA)
of Vancouver, BC began the PEA, which is scheduled for completion in the
3rd quarter of 2010. Several coal technologies for energy production are
under review including clean coal power generation, coal quality
upgrading, coal gasification and coal to liquids.
-- Environmental baseline work under the direction of EBA has begun with
emphasis on collecting data and reporting on results for the PEA.
-- Five drill holes totalling 569 metres were completed at the Ballantyne
property in Saskatchewan to test airborne geophysical targets. No coal
was intercepted in these holes.
-- A total of 8 holes were completed at the Pine River property in Manitoba
with 2 coal intercepts from 1 to 3 metres thick. Drilling was
discontinued pending completion of the consultation process between the
Government of Manitoba and First Nations groups regarding the work
program.
-- Under an agreement with Westcore Energy Ltd. to identify coal targets
using Goldsource proprietary geophysical tools, the success criteria set
out in the agreement have been satisfied and the Company is entitled to
receive, amongst other things, an additional 1 million shares of
Westcore and a 25% working interest in Westcore's coal lands in
Saskatchewan and Manitoba. Westcore has recently announced the discovery
of several significant coal deposits adjacent to the Border property in
which Goldsource now has a 25% interest. Please refer to the Company's
news release dated December 11, 2009 at www.goldsourcemines.com for
further details of the agreement.
----------------------------------------------------------------------------
Coal Zone
Interval
Hole ID From (m) To (m) (i)(m) Notes
----------------------------------------------------------------------------
BD10-120 60.5 85.3 24.8 Niska 107 deposit
BD10-121 72.0 111.2 39.2
BD10-125 71.5 126.0 54.5
BD10-127 50.0 68.0 18.0
BD10-133 41.0 80.0 39.0
BD10-136 56.5 183.0 126.5
BD10-138 45.0 63.0 18.0
----------------------------------------------------------------------------
BD10-119 83.8 148.0 64.3 Niska 108 deposit
BD10-123 107.0 137.0 30.0
BD10-132 89.0 94.0 5.0
BD10-135 70.3 80.0 9.7
BD10-139 80.0 103.0 23.0
----------------------------------------------------------------------------
BD10-116 50.0 51.0 1.0 New - Niska 116
BD10-122 92.7 94.6 1.9 New - Leaf Lake 122
BD10-124 86.0 139.0 53.0 Pasquia 2 in-fill hydrology hole
BD10-140 78.0 152.0 74.0 Chemong 3 in-fill hole
(i)The coal zone intervals are based on visuals (coal and carbonaceous
material) and down hole, e-log density of 1.6 g/cc or less.
Please login to post a reply
Like Goldsource Mines Inc? Then you might also be interested in Mistango River Resources
Forgot your username or password?
Recover it here
Not a member yet?
Register
You can now log in to Agoracom using your existing Facebook account. Click below to log in automatically.
