Welcome To The Gran Tierra Energy Inc. HUB On AGORACOM
Edit this title from the Fast Facts Section
  • Demo Video
  • Private Messages
  • Edit My Profile
  • View/Edit Portfolio

AGORACOM News Flash

AGORACOM WIRE - FRIDAY MAY 25TH, 2012

FOCUS METALS (TSXV:FMS) Changes Its Name to Focus Graphite Inc.

  • Aim to develop and manufacture the best technology graphite in the world
  • Additional shareholder value will come from investment in commercialized graphene through joint venture partner, Grafoid Inc.

Read More   |   *SPONSOR

INTERNATIONAL PBX VENTURES (TSX:PBX) Signs Copaquire Joint Venture Option Agreement - $90M Potential Payment Read More

AGORACOM Maintenance Alert: Friday Evening Downtime for About an Hour Read More

LOMIKO METALS (TSXV:LMR) Graphite and Zinc Price Outlook is Favourable Through 2013  Read More   |   *SPONSOR

 

 

Message: Gran Tierra Energy to Complete Costayaco-7 as Water Injector

Tony_profile
Rank: [?]
President
Points: [?]
5273
Rating: [?]
Votes: 18 Score: 4.2
  • Currently 4.3/5 Stars.
Did you know? You can earn activity points by filling your profile with information about yourself (what city you live in, your favorite team, blogs etc.

Gran Tierra Energy to Complete Costayaco-7 as Water Injector

posted on Aug 05, 09 07:20AM

Gran Tierra Energy to Complete Costayaco-7 as Water Injector

Pipeline Repairs to Trans Andean Pipeline Continuing

Gran Tierra Energy Inc. (NYSE Amex: GTE, TSX: GTE), a company focused on oil exploration and production in South America, today announced that testing of Costayaco-7 has been completed. In addition, production operations are continuing at a reduced level while repairs continue with the Ecopetrol-operated Trans Andean Pipeline west of Orito.

Costayaco-7

The Costayaco-7 well is located at the northern end of the Costayaco Field in the Chaza Block, Putumayo Basin of southern Colombia. Following the well's initial results, further testing demonstrated that only formation water, and no oil, was present in the top of the Villeta T Reservoir where well logs and pressure data had indicated a potential thin oil column. This well will now be completed as a water injector to dispose of produced water from the Costayaco field, and to provide pressure support for the Villeta T reservoir.

Production Operations

Repairs on the Ecopetrol-operated Trans Andean Pipeline west of Orito are continuing. Since the pipeline was shut in on July 10, Gran Tierra Energy has produced crude at a reduced level of approximately 6,000 barrels of oil per day (BOPD) net after royalty in Colombia using available trucking capacity. The company expects to continue producing at approximately these levels until repairs are completed.

Argentina production has been averaging approximately 860 BOPD net after royalty during this period. Production in Argentina has since risen to approximately 1,200 BOPD net after royalty following recent completion of well workover activity.

"We expect to be able to return to normal production levels immediately following the completion of repairs," said Dana Coffield, President and Chief Executive Officer of Gran Tierra Energy. "Production from the recently drilled Costayaco-8, with a production capacity of 3,500-4,500 BOPD, is ready to be tied in, and drilling operations at Costayaco-9 are proceeding normally with completion expected in late August."

New Message

Please login to post a reply

AGORACOM Quick Tips

AGORACOM 100 - The Top 100 Small Caps ... Find Your Next Investment

President's D.D.

Hub Leaders