Welcome To The Hana Mining HUB On AGORACOM
Edit this title from the Fast Facts Section
  • Demo Video
  • Private Messages
  • Edit My Profile
  • View/Edit Portfolio

AGORACOM News Flash

AGORACOM Wire - Wednesday February 15th, 2012

Breaking News ....

Lomiko (LMR: TSX-V) to Complete 43-101 Report on Previous Drilling at the Quatre Milles Graphite Property *CLIENT* Read More

Top Sector Stories ....

Strike Graphite Corp. (TSXV:SRK) Acquires Wagon Graphite Project in Quebec in Vicinity of Timcal's Lac des Iles Graphite Mine *CLIENT* Read More  |  Profile

Strike Graphite goes "Beyond the Press Release"

McLaren Resources (CNSX:MCL) Drills 7.0 Grams Gold Over 7.4 Metres at the TimGinn Property Located Adjacent to the Hollinger Mine *CLIENT* Read More | Watch Beyond the Press Release

 AGORACOM Launches GraphiteStocksBlog.com

We're proud to announce the launch of GraphiteStocksBlog.com a website dedicated to the needs of investors and companies in the fast growing Graphite industry.

INAUGURAL GRAPHITE SPONSORS

Message: Intersects 2.02% Cu and 41.8 g/t Ag over 14.0 meters etc.

2nd shots 1 002
Rank: [?]
President
Points: [?]
23899
Rating: [?]
Votes: 219 Score: 3.5
  • Currently 3.6/5 Stars.
Did you know? You can earn activity points by filling your profile with information about yourself (what city you live in, your favorite team, blogs etc.

Intersects 2.02% Cu and 41.8 g/t Ag over 14.0 meters etc.

posted on May 07, 09 07:56AM
May 7, 2009
Hana Mining Intersects 2.02% Cu and 41.8 g/t Ag over 14.0 meters and 1.53% Cu and 26.3 g/t Ag over 7.0 Meters at Banana Zone-Ghanzi Copper-Silver Project, Botswana
VANCOUVER, BRITISH COLUMBIA--(Marketwire - May 7, 2009) - Hana Mining Ltd. (TSX VENTURE:HMG)(FRANKFURT:4LH) (the "Company") is pleased to report new results for 8 diamond drill holes at its sediment-hosted Ghanzi Copper-Silver Project in Botswana. Highlights of results for the new holes are as follows:

-----------------------------------------------------------------
                                             Core
                       Hole   From     To  Length      Cu      Ag
Zone                 Number     (m)    (m)     (m)     (%)   (g/t)
-----------------------------------------------------------------
Banana - N. Limb    HA-95-D    131    145      14    2.02    41.8
-----------------------------------------------------------------
                               132    134       2    3.37    73.8
-----------------------------------------------------------------
                               136    141       5    2.62    48.9
-----------------------------------------------------------------
                               136    145       9    2.16    43.7
-----------------------------------------------------------------
                               153    163      10    0.33     4.3
-----------------------------------------------------------------
                    HA-93-D    138    145       7    1.53    26.3
-----------------------------------------------------------------
                               140    145       5    1.90    35.0
-----------------------------------------------------------------
                               148    152       4    0.52    11.3
-----------------------------------------------------------------
                               161    169       8    0.53     6.0
-----------------------------------------------------------------
                               167    169       2    1.02     9.8
-----------------------------------------------------------------
                               168    169       1    1.30    11.7
-----------------------------------------------------------------
Banana - S. Limb    HA-81-D     84     87       3    0.78     8.7
-----------------------------------------------------------------
                                86     87       1    1.87    24.1
-----------------------------------------------------------------
                    HA-82-D     99    102       3    0.69     7.2
-----------------------------------------------------------------
                               100    101       1    1.61    16.6
-----------------------------------------------------------------
                    HA-84-D    117    121       4    0.52     4.6
-----------------------------------------------------------------
                               118    120       2    0.70     6.5
-----------------------------------------------------------------
                    HA-86-D     64     67       3    0.85     9.8
-----------------------------------------------------------------
                                64     66       2    1.14    12.1
-----------------------------------------------------------------
                                65     66       1    1.52    15.6
-----------------------------------------------------------------
                    HA-88-D     87     89       2    0.72     7.1
-----------------------------------------------------------------
                    HA-89-D    135    139       4    1.37    18.2
-----------------------------------------------------------------
                               136    139       3    1.71    23.3
-----------------------------------------------------------------
                               136    137       1    1.91    24.5
-----------------------------------------------------------------
                               138    139       1    2.36    33.2
-----------------------------------------------------------------
Two of the holes, HA-93 and 95-D, were drilled along the North Limb of the Banana Zone and tested copper-silver mineralization previously reported in press releases dated July 29 and October 29, 2009. The two new holes were 500 meters apart. Hole HA-93-D returned 7.0 meters grading 1.53% Cu and 26.3 g/t Ag and HA-95-D returned 14.0 meters grading 2.02% Cu and 41.8 g/t Ag, including 5.0 meters grading 2.62% Cu and 48.9 g/t Ag. The other six holes, HA-81, 82, 84, 86, 88 and 89-D, were drilled along an 800 meter strike length on the south limb of the Banana Zone. Both areas along the Banana Zone are open along strike and down dip.

Intercepts reported are intersection length and are estimated to be 80% or more of true width.

Holes HA-93 and 95-D were collared along the North Limb of the Banana Zone and were designed to confirm mineralization intersected in percussion holes listed above. HA-93-D intersected three parallel lenses with the upper zone grading 1.53% Cu and 26.3 g/t Ag over 7.0 meters (6.0m true width). The mineralized intercept in this hole is 60 meters down dip from mineralization intersected in previous hole HA-08-P that returned a 12 meter intercept (9.0m true width) that returned 2.36% Cu and 52.2 g/t Ag. Hole HA-95-D, collared 500 meters southwest of HA-93-D was designed to confirm mineralization intersected in previous percussion holes HA-02, 03 and 04-P. The new hole returned 2.02% Cu and 41.8 g/t Ag over 14.0 meters (11.2m true width) which occurs between intercepts of 15 meters (9m true width) grading 1.15% Cu and 4.9 g/t Ag (HA-02-P) and 18 meters (10.8m true width) grading 1.25% Cu and 26.5 g/t Ag (HA-03-P). The mineralization is open both along strike to the southwest and down dip. It is significant that strong copper-in-soil anomalies occur 6 kilometers to the southwest and are coincident with the interpreted aeromagnetic response of the target horizon.

Selected intercepts from July 29 and October 29, 2009 press releases:

-----------------------------------------------------------------
                                             Core
                       Hole   From     To  Length      Cu      Ag
Zone                 Number     (m)    (m)     (m)     (%)   (g/t)
-----------------------------------------------------------------
Banana - N. Limb    HA-02-P     27     42      15    1.15    4.92
-----------------------------------------------------------------
                                30     39       9    1.52    3.97
-----------------------------------------------------------------
                    HA-03-P     93    135      42    0.76    14.6
-----------------------------------------------------------------
                                96    114      18    1.25   26.54
-----------------------------------------------------------------
                    HA-04-P    159    189      30    1.02   23.47
-----------------------------------------------------------------
                               159    177      18    1.36   30.54
-----------------------------------------------------------------
                    HA-05-P     69    102      33    1.01   14.12
-----------------------------------------------------------------
                                72     81       9    1.65   28.33
-----------------------------------------------------------------
                                93     96       3     2.6   30.25
-----------------------------------------------------------------
                    HA-06-P     15     36      21    0.34    less
                                                             than
                                                             2.00
-----------------------------------------------------------------
                    HA-08-P     57     84      27    1.12    25.4
-----------------------------------------------------------------
                                60     72      12    2.36    52.2
-----------------------------------------------------------------
                                96    105       9    0.51     5.6
-----------------------------------------------------------------
Intercepts reported are intersection length and are estimated to be 60% or more of true width.

Holes HA-81, 82, 84, 86, 88 and 89-D tested the South Limb of the Banana Zone along a 800 meter strike length near the northeast fold closure. Five of the six holes intersected narrow high grade mineralization and the last hole to the southwest, HA-89-D, returned 3.0 meters grading 1.71% Cu and 23.3 g/t Ag. These are the first holes drilled by Hana in this area.

The north and south limbs of the Banana Zone are each 30 kilometers in length. To date Hana has tested 9.1 kilometers along the north limb and 4.8 kilometers along the south limb. All mineralization intersected to date is open along strike and down dip. More than 40 kilometers remain untested at the Banana Zone.

Quality Assurance/Quality Control

Hana has implemented an industry-standard QA/QC program. Drill core is logged, split by sawing and sampled at site. Samples are bagged, labeled, sealed and packed in sealed containers and shipped to Scientific Services Laboratory in Cape Town, South Africa. Standards and blanks are inserted into the sample stream.

About Hana Mining Ltd.

Hana Mining is a junior exploration company seeking to acquire, explore and develop highly prospective precious, base metal and other mineral projects worldwide with emphasis in southern Africa. The Company has the right to acquire a 70% controlling interest in the Ghanzi Copper-Silver Project in Botswana. The property consists of five license blocks covering 2,200 square kilometers that contain widespread sediment-hosted copper-silver mineralization.

Joseph Arengi, M. Sc., P. Geo., Vice President of Exploration for Hana Mining is the qualified person as defined in NI 43-101.

Statements in this press release, other than purely historical information, including statements relating to the Company's future plans and objectives or expected results, may include forward-looking statements. Forward-looking statements are based on numerous assumptions and are subject to all of the risks and uncertainties inherent in resource exploration and development. As a result, actual results may vary materially from those described in the forward-looking statements.

To view the maps accompanying this release please click on the following link: http://media3.marketwire.com/docs/hm... .

New Message

Please login to post a reply

AGORACOM Quick Tips

Alaskan Junior Gold Co. with Bonanza Grades ... Learn More!

President's D.D.

New feature: Hub Presidents can add important links here.