Ni, Co, Cu, PGM, Au Properties in Ontario Canada
Producing Mines and "state-of-the-art" Mill
  • Demo Video
  • Private Messages
  • Edit My Profile
  • View/Edit Portfolio

AGORACOM News Flash

AGORACOM WIRE - FRIDAY MAY 25TH, 2012

FOCUS METALS (TSXV:FMS) Changes Its Name to Focus Graphite Inc.

  • Aim to develop and manufacture the best technology graphite in the world
  • Additional shareholder value will come from investment in commercialized graphene through joint venture partner, Grafoid Inc.

Read More   |   *SPONSOR

INTERNATIONAL PBX VENTURES (TSX:PBX) Signs Copaquire Joint Venture Option Agreement - $90M Potential Payment Read More

AGORACOM Maintenance Alert: Friday Evening Downtime for About an Hour Read More

LOMIKO METALS (TSXV:LMR) Graphite and Zinc Price Outlook is Favourable Through 2013  Read More   |   *SPONSOR

 

 

Message: Liberty Updates Feasibility Study for the McWatters Nickel Mine

Generic_profile
Rank: [?]
Treasurer
Points: [?]
379
Rating: [?]
Votes: 11 Score: 3.2
  • Currently 3.3/5 Stars.
Did you know? You can earn activity points by filling your profile with information about yourself (what city you live in, your favorite team, blogs etc.

Liberty Updates Feasibility Study for the McWatters Nickel Mine

posted on Dec 22, 09 08:13AM

Liberty Updates Feasibility Study for the McWatters Nickel Mine

8:00 AM ET, December 22, 2009

Edmonton, Alberta CANADA, Dec 22, 2009 (Filing Services Canada via COMTEX) -- Liberty Mines Inc. (LBE - TSX), ("Liberty or the Company") is pleased to announce the results of an updated feasibility study completed for its McWatters nickel mine based on an independent National Instrument 43-101 compliant mineral reserve model completed by SRK Consulting (Canada) Inc. ("SRK"). The McWatters Probable Mineral Reserves was estimated by SRK at 872,000 tonnes with an average grade of 0.70% nickel ("Ni") using a nickel price of US$15,430 per tonne (US$7.00 per pound) and an exchange rate of $1.00 CDN = $0.90 US. All revenue and costs are expressed in Canadian dollars unless otherwise indicated.

The estimate was based on partially mining a small open pit and caving the balance of the remaining ore in the open pit with the underground sublevel cave mining operation. Due to time constraints, this report does not optimize the "caved pit design" with the underground operation. Conceptual level calculations indicate a potential for decreasing waste stripping and overburden removal. Various models show pre-tax cost savings in the range of $2 million to $4 million. The resulting pre-tax cash flow would be in the range of $15.2 million to $17.2 million. The authors are confident in these findings and strongly recommend mining and geotechnical engineering be allocated to complete optimization.

The life of mine ("LoM") for the McWatters project is two years at an average production rate of 1800 tonnes per day. Approximately 28% of the ore will be mined from the open pit with the 72% balance exploited by sub level caving (87%) and cut & fill (13%) mining methods.

The open pit and the underground mine assessed individually and together in the combined production schedule are economically viable at the study Ni price of US$7.00 per pound. The project economics include:

* LoM net revenue based on plant feed of 872,000 tonnes at 0.70% Ni is estimated at $62 million;

* Open pit mine unit operating costs are estimated at $4.56 per tonne mined;

* Underground mine unit operating costs are estimated at $35 per tonne mined for sublevel caving and $45 per tonne mined for cut and fill;

* The estimated unit cost for processing at 1,500 tonnes per day is $16.19;

* The LoM average general and administration operating cost is estimated at $3.25 per tonne milled;

* The average surface ore haulage cost to the Redstone mill is estimated at $2.26 per tonne;

* LoM operating costs are estimated at $45 million;

* Total project capital requirements are estimated at $3.5 million;

* Undiscounted pre-tax LoM cash flow is estimated at $13.2 million;

* The estimated project NPV at a 8% discount rate is $11.54 Million;

* The project IRR is estimated at 460% excluding sunk costs.

The resource and reserve estimates for the McWatters mine are presented in the following tables, respectively:

McWatters Mineral Resource Statement - SRK Consulting, July 27, 2009



Classification Zone Mining Quantity Grade Contained Nickel
Type Tonnage Ni(%) Tonnes (000'lbs)
-------------------------------------------------------------------------
Open Pit Mining

Indicated Disseminated Open Pit 368,400 0.45 1,646 3,629
Zone

Underground Mining

Indicated Disseminated SLC/BH** 382,200 0.86 3,287 7,075
Zone

Massive Cut 41,900 3.57 1,497 3,297
Zone & Fill***

Combined Mining

Indicated Total Combined 792,500 0.81 6,430 14,172
-------------------------------------------------------------------------



Mineral resources are not mineral reserves and do not have demonstrated economic viability. Numbers have been rounded to reflect accuracy of the estimate.

*Open Pit Resource reported within a designed pit at a cut off grade of 0.27% Ni.

**Sub-level caving (SLC) and longhole stope (BH) resources area reported within designed stopes at a cut off grade of 0.55% Ni.

***Cut and fill stope resources are reported within designed stopes at a cut off grade of 0.65% Ni.

Cut-off grades are based on a nickel price of US$7.00/lb and a mill recovery of 87%.

McWatters Mineral Reserve Statement - SRK Consulting, December 15, 2009



Classification Zone Quantity Grade Contained Nickel
Tonnage Ni(%) (tonnes) (lbs)
---------------------------------------------------------------------
Probable Pit 245,000 0.33 810 1,790,000
Probable SLC/BH 546,000 0.68 3,710 8,180,000
Probable CF 81,000 1.91 1,540 3,400,000
Probable Total 872,000 0.70 6,060 13,370,000
---------------------------------------------------------------------



The in-situ mineral resources included into the mineral reserve estimate are based on cut-off grades of 0.25% Ni for the open pit, 0.54% Ni for sublevel cave, and 0.63% Ni for cut and fill mining methods.

The independent mineral resource and reserve estimates prepared by SRK are reported in accordance with Canadian Securities Administrators' National Instrument 43-101 and conforms to generally accepted Canadian Institute of Mining ("CIM") "Estimation of Mineral Resources and Mineral Reserves Best Practices" guidelines. A complete National Instrument 43-101 Technical Report, which will incorporate the resource and reserve estimation, will be filed on Sedar within 45 days of release of this press release.

This independent Technical Report was compiled by Mr. Glen Cole, P. Geo.(APGO) and Mr. Andrew MacKenzie, P. Eng. (APEO) as principal authors with assistance from the following independent professionals:

* Mr. Cam Scott, P. Eng. on pit overburden slope design for closure planning;

* Mr. Bruce Murphy, FSAIMM for the hard rock geotechnical assessment;

* Mr. Eugene Puritch, P. Eng. on open pit design;

* Mr. Phil Bridson, P. Eng. on underground mine planning;

* Mr. Carlo Cattarello, P. Eng. on mineral processing;

* Mr. Rod Doran, P. Eng. on closure planning.

This report benefited from the review of Mr. Ken Reipas, P. Eng. SRK Principal Mining Engineer. By virtue of their education, relevant work experience and affiliation to a recognized professional association, these professionals are independent qualified persons as defined by National Instrument 43-101.

About Liberty Mines Inc.

Liberty Mines Inc. is a producer of nickel and is focused on the exploration, development and production of nickel, copper, cobalt and platinum group metals from its properties in Ontario, Canada. It owns and operates the Redstone nickel concentrator near Timmins Ontario.

CAUTIONARY STATEMENT

No stock exchange, securities commission or other regulatory authority has approved or disapproved the information contained herein. This News Release includes certain "forward looking statements". All statements other than statements of historical fact included in this release, without limitation, statements regarding future plans and objectives of Liberty, are forward looking statements that involve various risks and uncertainties. There can be no assurance that such statements will prove to be accurate and actual results and future events could differ materially from those anticipated in such statements. Important factors that could cause actual results to differ materially from Liberty's expectations are: mining risks; commodity prices; currency exchanges; regulatory approvals; and assumed startup and operating costs detailed herein and from time to time in the filings made by Liberty with securities regulators.

For further information please contact:

Dr. Gary Nash, PhD (Physics), President & CEO

Phone (416) 238-9736 Fax 780-437-7898

e-mail: gnash@libertymines.com

Press Release 18-09

Source: Liberty Mines Inc. (LBE)http://www.libertymines.com

Maximum News Dissemination by Filing Services Canada Inc. *

www.usetdas.com

http://www.useTDAS.com

Copyright (c) 2006 Filing Services Canada Inc.

Back


New Message

Please login to post a reply

AGORACOM Quick Tips

AGORACOM Twitter. Follow our small but powerful market tips .. Follow and Prosper

President's D.D.

The best source for detailed insight into all aspects pertaining to Liberty Mines Inc. read more

Hub Leaders