High-grade Ni-Cu-Pt-Pd-Au-Ag-Rh-Cr-V discoveries in the "Ring of Fire"
NI 43-101 Update (March 2011): 11.0 Mt @ 1.78% Ni, 0.98% Cu, 0.99 gpt Pt and 3.41 gpt Pd and 0.20 gpt Au (M&I) / 9.0 Mt @ 1.10% Ni, 1.14% Cu, 1.16 gpt Pt and 3.49 gpt Pd and 0.30 gpt Au (Inf.)
  • Demo Video
  • Private Messages
  • Edit My Profile
  • View/Edit Portfolio

AGORACOM News Flash

AGORACOM WIRE - FRIDAY MAY 25TH, 2012

FOCUS METALS (TSXV:FMS) Changes Its Name to Focus Graphite Inc.

  • Aim to develop and manufacture the best technology graphite in the world
  • Additional shareholder value will come from investment in commercialized graphene through joint venture partner, Grafoid Inc.

Read More   |   *SPONSOR

INTERNATIONAL PBX VENTURES (TSX:PBX) Signs Copaquire Joint Venture Option Agreement - $90M Potential Payment Read More

AGORACOM Maintenance Alert: Friday Evening Downtime for About an Hour Read More

LOMIKO METALS (TSXV:LMR) Graphite and Zinc Price Outlook is Favourable Through 2013  Read More   |   *SPONSOR

 

 

Message: Road work estimates laid out in the P&E Technical Report of Dec 10/08 pg.23

Images
Rank: [?]
President
Points: [?]
15009
Rating: [?]
Votes: 261 Score: 3.6
  • Currently 3.6/5 Stars.
Did you know? You can earn activity points by filling your profile with information about yourself (what city you live in, your favorite team, blogs etc.

Road work estimates laid out in the P&E Technical Report of Dec 10/08 pg.23

posted on Feb 18, 09 03:57PM

SITE ACCESS ROAD

The Eagle One Deposit site is currently not accessible by road. It is assumed that a permanent

access road would be required from Nakina via Martin Falls to the project site. Road

construction from Martin Falls to the site could utilize glacial eskers in the area which would

facilitate road building and lower construction cost. Gravel road construction costs were based

on a 7 m wide road bed which allows haulage truck travel speeds of at least 60 to 70 km/h.

Based on a limited amount of information on topography and lay of the land the estimated cost

of access haul road construction is $306,000 per kilometre, excluding EPCM and contingency,

as summarized in Table 1.9.

TABLE 1.9 – ACCESS ROAD COST ESTIMATE / km

Noront Resources Ltd. - Eagle One Preliminary Economic Assessment

Description $000’s/km

Road Construction Estimate (Based on GBN) 225

Culverts m per km (Based on Premier Ridge and GBN) 6

Bridge Cost per Km (Based on Premier Ridge) 75

Total Road Construction (W/O EPCM and Contingency) 306

Noront’s share of the total estimated cost of road access is approximately $62.3 million. A

summary of this estimate is presented in Table 1.10.

TABLE 1.10 – ACCESS ROAD COST ESTIMATE

Noront Resources Ltd. - Eagle One Preliminary Economic Assessment

Description Km Current Status

Government

Share

Noront’s Share (C$ M)

Nakina to End of HW 584 84.3 All-Weather Road

Nakina Winter road to Marten Falls 114.2 Winter Road 50% $17.5

Martin Falls to Eagle One 146.4 Non Existent Road $44.8

Total Noront’s Share $62.3

The portion of access road between Nakina and Martin Falls is assumed to be on a 50% cost

sharing bases with the Ontario Provincial Government. In addition, to facilitate major river

crossings of the Attawapiskat and the Albany Rivers, two Barges / Ferries, at an estimated cost

of $2.5 M each, have been included in the capital cost estimate.