The drilling announced today is the follow-up/continuation of the
drill plan that was initiated in mid-Oct and was wrapped up approx.
two weeks later with the following explanation:
"The only drill available for this program was a hydraulically
powered model which could be mobilized to the site by helicopter.
The purpose of proceeding with it at this time was to confirm the
existence of the fault zone, to test for shallow alteration and /or
mineralization along it and to accurately determine the dip of the
zone so that deeper holes requiring a larger machine could be more
precisely designed.
"Three holes to intersect the main fault zone near surface were
attempted and partially completed. The ground was found to be
extremely disrupted with gouge (clay) seams indicative of faulting
and the sandstone is in part intensely altered. Circulation of drilling
fluid was frequently lost in open fractures resulting in several strings
of drill rods becoming jammed in the holes and not recovered. It
was therefore decided to terminate the program and proceed later
with a larger machine better equipped to cope with the difficult
ground. If normal winter conditions prevail it should be possible
to mobilize a larger drill to the site over an existing winter road
from Stoney Rapids to Riou Lake in January."