Welcome to the TTM Resources Stock Hub

(Edit this Message from the "Fast Facts" Section)

Free
AGORACOM NEWS FLASH

Dear Agoracom Family,

I want to thank all of you for your patience with us over the past 48 hours and apologize for what was admittedly a botched launch of our new site.

As you can see, we have reverted back to the previous version of the site while we address multiple forum functionality flaws that inexplicably made their way into the launch.

To this end:

1.We have identified 8 fundamental but easily fixable flaws that will be corrected in the coming week, so that you can continue to use the forums exactly as you've been accustomed to.

2.Additionally we will also be implementing a couple of design improvements to "tighten up" the look and feel of the forums.

Have a great Sunday, especially those of you like me that are celebrating Orthodox Easter ... As well as those of you who are also like me and mourning another Maple Leafs Game 7 exit ... Ugggh!

Sincerely,

George et al

Message: Updated resource estimate

TTM RECEIVES REVISED RESOURCE ESTIMATE

FOR CHU MOLYBDENUM PROJECT

MEASURED AND INDICATED RESOURCE INCREASED BY 18%

Measured 159,080,000 tonnes 0.061% Mo, 0.035% Cu (at 0.04% Mo cutoff)

Indicated 211,550,000 tonnes 0.057% Mo, 0.035% Cu (at 0.04% Mo cutoff)

Inferred 256,560,000 tonnes 0.052% Mo, 0.036% Cu (at 0.04% Mo cutoff)

Vancouver, B.C., May 20, 2010 – W. K. Crichy Clarke, President and CEO of TTM Resources Inc. (“TTM” or the “Company”) announces that the Company is in receipt of an updated Resource Estimate from Gary Giroux of Giroux Consultants Inc. of Vancouver, B.C. for its 100% owned Chu Molybdenum Project located 65 kilometers southwest of Vanderhoof, British Columbia, Canada. The updated Resource Estimate has been incorporated into a revised Preliminary Economic Assessment (“PEA”) prepared by Moose Mountain Technical Services (“Moose Mountain”) of Calgary, Alberta.

Revised Resource Estimate and Preliminary Economic Assessment

The Company has received an updated Resource Estimate from Giroux Consultants Inc., of Vancouver, B.C. The revised estimate was calculated by incorporating the 2009 and 2010 drilling campaigns (13 drill holes totaling 5,894 meters) that occurred subsequent to the previous resource estimate announced in the Company’s Feb 27, 2009 press release, which incorporated all holes drilled to the end of 2008. The Mineral Resource Estimate at the Company’s 100% owned Chu Molybdenum project using a 0.04% Mo cutoff now stands at: Measured 159 million tonnes at an average grade of 0.061% Mo and 0.035% Cu (214 million lbs molybdenum, 122.8 million lbs copper), Indicated 211 million tonnes at an average grade of 0.057% Mo and 0.035% Cu (265.9 million lbs molybdenum, 163 million lbs copper), and Inferred 256 million tonnes at an average grade of 0.052% Mo and 0.036% Cu (294.2 million lbs molybdenum, 203 million lbs copper). The Measured plus Indicated resource totals 370 million tonnes at a grade of 0.059% Mo and 0.035% Cu (482.2 million lbs of molybdenum, 286.1 million lbs copper). The Measured and Indicated resource tonnage has increased by 18% while the contained molybdenum and copper have increased by 16% and 12% respectively over the previous estimate. The Resource Estimate is tabulated at various cutoffs and shown on the tables below:

CHU PROJECT - MEASURED RESOURCE

Mo Cutoff

Tonnes> Cutoff

Grade > Cutoff

(%)

(tonnes)

Mo %

Cu (%)

Million lbs Mo

Million lbs Cu

0.02

286,070,000

0.047

0.034

296.5

214.5

0.03

222,820,000

0.053

0.035

260.4

172.0

0.04

159,080,000

0.061

0.035

214.0

122.8

0.05

100,380,000

0.070

0.035

154.9

77.5

0.06

61,080,000

0.080

0.036

107.7

48.5

0.07

35,990,000

0.090

0.037

71.4

29.4

0.08

21,450,000

0.101

0.039

47.8

18.4

0.09

13,190,000

0.111

0.041

32.3

11.9

0.10

8,340,000

0.120

0.043

22.1

7.9

CHU PROJECT - INDICATED RESOURCE

Mo Cutoff

Tonnes> Cutoff

Grade > Cutoff

(%)

(tonnes)

Mo %

Cu (%)

Million lbs Mo

Million lbs Cu

0.02

508,910,000

0.041

0.033

460.1

370.3

0.03

345,970,000

0.049

0.035

373.8

267.0

0.04

211,550,000

0.057

0.035

265.9

163.3

0.05

119,340,000

0.067

0.036

176.3

94.7

0.06

67,990,000

0.077

0.036

115.4

54.0

0.07

38,880,000

0.086

0.036

73.7

30.9

0.08

21,720,000

0.095

0.037

45.5

17.7

0.09

11,830,000

0.104

0.039

27.1

10.2

0.10

5,920,000

0.114

0.040

14.9

5.2

CHU PROJECT - INFERRED RESOURCE

Mo Cutoff

Tonnes> Cutoff

Grade > Cutoff

(%)

(tonnes)

Mo %

Cu (%)

Million lbs Mo

Million lbs Cu

0.02

969,050,000

0.035

0.032

747.9

683.8

0.03

531,590,000

0.043

0.034

504.0

398.5

0.04

256,560,000

0.052

0.036

294.2

203.7

0.05

113,320,000

0.062

0.037

154.9

92.5

0.06

52,160,000

0.072

0.039

82.8

44.9

0.07

23,950,000

0.080

0.042

42.2

22.2

0.08

9,910,000

0.088

0.048

19.2

10.5

0.09

3,080,000

0.098

0.052

6.7

3.5

0.10

910,000

0.109

0.052

2.2

1.0

CHU PROJECT - MEASURED PLUS INDICATED RESOURCE

Share
New Message
Please login to post a reply