Tagish Lake Gold HUB
A Wealth of Experience In Gold
  • Demo Video
  • Private Messages
  • Edit My Profile
  • View/Edit Portfolio

AGORACOM News Flash

AGORACOM WIRE - WEDNESDAY MAY 30TH, 2012

GOLDEN HOPE MINES (TSXV:GNH) Confirms High Grade Intersection of 64.1 g/t Au (Gold) over 1m Read More 

  • The screen metallic analysis returned 82 g/t Au for an average grade of 93.5 g/t Au.
  • Two additional fire assays on the original pulp done prior to the screen metallic analyses returned 0.22 g/t Au and 0.12 g/t Au for an average fire assay grade of 0.41 g/t Au. The weighted average of all the fire assays and screen metallic assays from this 1-metre section in hole BD2011-184 is 64.1 g/t Au.

Sonomax® eers™ Custom Earbuds Announces Sponsorship of MUTEK 2012

CONTINENTAL ENERGY  Geothermal Energy Project Receives US$ 11.5 Million Grant Read More * Client

AGORACOM Launches Graphite Stocks Blog

Top Stories

  • FOCUS METALS (TSXV:FMS) Changes Its Name to Focus Graphite Inc. Read More   |   *SPONSOR

  • LOMIKO METALS (TSXV:LMK) Paul Gill Discusses Exploration Initiative with James West of Midas Letter Read More   |   *SPONSOR
  • GRAPHITE DEMAND Seen Surging from Fuel Cells, Nuclear Reactors, Graphene Read More

 

 

Message: new results - typical pinch and swell

Ddh17_zone_peri_section
Rank: [?]
President
Points: [?]
2320
Rating: [?]
Votes: 161 Score: 4.6
  • Currently 4.6/5 Stars.
Did you know? You can earn activity points by filling your profile with information about yourself (what city you live in, your favorite team, blogs etc.

new results - typical pinch and swell

posted on Dec 12, 07 06:39AM

Sure is nice when it swells

 

Rockaur 

 

 

Tagish Reports on Gold and Silver Values in the Rainbow Two Zone

10 Dec 2007 11:48 ET
(TSX.V: TLG)        RICHMOND, BC, Dec. 10 /CNW Telbec/ - Tagish Lake Gold Corp. (TSX.V - TLG)  is pleased to report on results of sampling from raises excavated on the  Rainbow Two and Berg zones. The raises were driven at an angle of  +50(degrees). The chip samples were taken across the entire face of the  working. The adjusted width shows the average of the results over the width of  the zone, adjusted to a minimum width of 1.50 m.        <<      -------------------------------------------------------------------------                                                            ADJ.      LOCATION     FROM     TO   WIDTH       Au       Ag  WIDTH     Au      Ag      -------------------------------------------------------------------------                     (m)    (m)     (m)    (g/t)    (g/t)    (m)  (g/t)   (g/t)      -------------------------------------------------------------------------      -------------------------------------------------------------------------      Rainbow Two      9+00 E Rse      Start (0)      0 + 1.5 m    0.00   0.60    0.60    26.10    106.0                   0.60   1.80    1.20     1.31    182.0                   1.80   2.30    0.50     6.80    106.0   2.30   8.97   145.6        0 + 2.6 m    0.60   1.05    0.45    51.60    316.0                   1.05   1.65    0.60    47.80    284.0   1.50  34.60   208.4        0 + 5.8 m    0.00   0.50    0.50     5.40     72.7                   0.50   0.70    0.20    77.00    166.0                   0.70   1.10    0.50     0.04      0.0                   1.10   1.25    0.15    62.00    788.0                   1.25   1.50    0.25     0.09      0.0   1.50  18.30   125.2        0 + 8.6 m    0.20   0.80    0.60    12.90    191.0                   0.80   1.60    0.80     0.07      0.0   1.50   5.20    76.4        0 + 13.8 m   0.70   0.90    0.20     3.90    496.0   1.50   0.52    66.1        0 + 17.3 m   0.90   1.10    0.20    29.00    537.0   1.50   3.87    71.6        9+75 E Rse      Start (0)      0 + 1.5 m    1.10   1.40    0.30    70.00   2062.0                   1.40   1.90    0.50     4.85      0.0   1.50  15.62   412.4        0 + 3.0 m    0.00   0.38    0.38   105.00    354.0                   0.38   0.60    0.22    54.90    188.0                   0.60   1.50    0.90     0.16      0.0   1.50  34.75   117.3        Rainbow Two      9+75 E Rse      (Cont'd)      0 + 4.5 m    0.45   0.65    0.20    98.00    712.0                   0.65   1.35    0.70     0.58      0.0   1.50  13.34    94.9        0 + 6.1 m    0.95   1.20    0.25    48.00    428.0   1.50   8.00    71.3        0 + 7.8 m    0.00   0.20    0.20     0.13      0.0                   0.20   0.80    0.60    69.20    294.0                   0.80   1.00    0.20     0.44      0.0   1.50  27.76   117.6        0 + 9.3 m    0.00   0.40    0.40      0.28     0.0                   0.40   0.60    0.20     51.00   302.0                   0.60   0.90    0.30      0.25     0.0   1.50   6.92    40.3        0 + 10.4 m                             nsv        0 + 12.0 m   0.00   0.35    0.35      0.52     0.0                   0.35   0.90    0.55     54.40   512.0   1.50  20.07   187.7        0 + 13.8 m                             nsv        0 + 17.2 m   0.00   0.60    0.60      0.13    0.0                   0.60   0.80    0.20     62.00  370.0                   0.80   1.20    0.40      0.65   58.7    1.50   8.49    65.0      10+40 E Rse      0 + 1.5 m    0.00   0.30    0.30     10.30  1470.0                   0.30   0.80    0.50      8.60   644.0   1.50   30.72  508.7        0 + 2.5 m    0.00   1.70    1.70     13.90   128.0   1.70   13.90  128.0        0 + 4.5 m                              nsv        0 + 7.0 m                              nsv        0 + 10.0 m                             nsv        0 + 11.2 m                             nsv        0 + 14.5 m   0.00   0.70    0.70      1.57     0.0                   0.70   1.20    0.50      2.90     0.0   1.50   1.70     0.0        Berg      8+65 E Rse      0 + 1.5 m    0.30   0.80    0.50     86.00   644.0   1.50  28.37   214.7        0 + 2.0 m                              nsv        0 + 2.9 m                              nsv        Berg      8+40 E Rse      0 + 2.9 m                              nsv        0 + 3.0 m    1.40   2.00    0.60     31.70   364.0   1.50  12.68   145.6        0 + 3.1 m    0.00   0.50    0.50      0.19     0.0                   0.50   1.20    0.70     12.70   687.0                   1.20   1.80    0.60      0.31     0.0   1.80   5.10   267.2        0 + 5.4 m                              nsv      -------------------------------------------------------------------------      >>      nsv = No Significant Values          Robert Rodger, P.Eng., President of the Company, stated: "The results  indicate that the gold and silver values continue vertically above the 1300m  level. As is expected in gold veins, the zones pinch and swell. The sample  results at 2.9, 3.0 & 3.1m in the 8+40E Raise provide some indicatio of the  variations, while confirming high grade values. The overall evaluation of  these zones will be undertaken when all of the results have been received"      The underground exploration program is under the supervision of Robert  Rodger, P.Eng., the President of the Company, a qualified person under NI  43-101. Sampling and assaying procedures are subject to a rigorous QA/QC  program, which includes insertion of standards and blanks for each batch of  samples. All samples were delivered in sealed packages to Eco-Tech  Laboratories in Whitehorse, YT for preparation and shipped by Eco-Tech to  their laboratory in Kamloops, BC for analyses. Samples that return values  greater than 900 ppb Gold (Au) by ICP were fire assayed for gold.

New Message

Please login to post a reply

AGORACOM Quick Tips

Start A New HUB. Control. Quality. Refreshing. ... Start One Now

President's D.D.

New feature: Hub Presidents can add important links here.