Welcome to the Trade Winds Ventures Hub on AGORACOM
"New Mines are found next to old ones"
  • Demo Video
  • Private Messages
  • Edit My Profile
  • View/Edit Portfolio

AGORACOM News Flash

AGORACOM WIRE - FRIDAY MAY 25TH, 2012

FOCUS METALS (TSXV:FMS) Changes Its Name to Focus Graphite Inc.

  • Aim to develop and manufacture the best technology graphite in the world
  • Additional shareholder value will come from investment in commercialized graphene through joint venture partner, Grafoid Inc.

Read More   |   *SPONSOR

INTERNATIONAL PBX VENTURES (TSX:PBX) Signs Copaquire Joint Venture Option Agreement - $90M Potential Payment Read More

AGORACOM Maintenance Alert: Friday Evening Downtime for About an Hour Read More

LOMIKO METALS (TSXV:LMR) Graphite and Zinc Price Outlook is Favourable Through 2013  Read More   |   *SPONSOR

 

 

Message: Tradewinds Intersects 4.37 g/ton of Gold Over 15 Meters in Block A

Panamax
Rank: [?]
President
Points: [?]
3822
Rating: [?]
Votes: 87 Score: 3.7
  • Currently 3.7/5 Stars.
Did you know? You can earn activity points by filling your profile with information about yourself (what city you live in, your favorite team, blogs etc.

Tradewinds Intersects 4.37 g/ton of Gold Over 15 Meters in Block A

posted on Jun 09, 11 10:11AM

FSC / Press Release


Trade Winds Intersects 4.37 g/t gold over 15 metres on Block A

* 4.37 g/t Au over 15.0 m and 1.86 g/t Au over 9.0 m in Hanging Wall

* 1.89 g/t Au over 7.6 m and 1.24 g/t Au over 7.0 m in M Zone

* 1.44 g/t Au over 10.0 m and 1.02 g/t Au over 15.0 m in Foot Wall

* Exceptional gold intercepts of 127.0 g/t over 0.3 m and 53.1 g/t over 1.0 m in hanging wall, 46.5 g/t over 1.0 m in M Zone and 113.0 g/t over 1.0 m in footwall


Vancouver, British Columbia CANADA, June 09, 2011 /FSC/ - Trade Winds Ventures Inc. (TWD - TSX Venture, TVR - FWB), is pleased to announce additional drilling results on the Block A Joint Venture project (50% Trade Winds / 50% Detour Gold), located adjacent to Detour Gold's Detour Lake gold project in northeastern Ontario. The 2011 drilling program of 69 drill holes totalling 29,756.5 metres was completed on May 2, 2011. Trade Winds is the operator of the Joint Venture exploration program.

Shown below are the significant mineralized (uncut) sections intersected in the 9 diamond drill holes (TWDDH282A to TWDDH290), all infill drill holes located within the pit shell on Block A.

-***-
HANGING WALL ZONE

TWDDH-284 TWDDH-285 TWDDH-286
4.37 g/t Au over 15.0 m 1.34 g/t Au over 5.0 m 27.83 g/t Au over 2.5 m

TWDDH-289 TWDDH-290 TWDDH-290
0.99 g/t Au over 6.0 m 1.02 g/t Au over 4.0 m 1.86 g/t Au over 9.0 m

M ZONE

TWDDH-283 TWDDH-286 TWDDH-287
0.85 g/t Au over 9.0 m 1.24 g/t Au over 7.0 m 1.89 g/t Au over 7.6 m

TWDDH-288 TWDDH-289 TWDDH-290
1.19 g/t Au over 5.0 m 10.23 g/t Au over 5.2 m 1.6 g/t Au over 5.0 m

FOOT WALL ZONE

TWDDH-283 TWDDH-284 TWDDH-285
2.74 g/t Au over 3.0 m 2.96 g/t Au over 4.0 m 1.02 Au g/t over 15.0 m

TWDDH-286 TWDDH-287 TWDDH-290
0.95 g/t Au over 4.3 m 1.80 g/t Au over 4.0 m 1.44 Au g/t over 10.0 m
1.72 Au g/t over 5.0 m

-****-

Additional results are listed below in the press release.

The winter 2011 drill program began on January 5th, 2011 was completed on May 2nd, 2011 with 72 diamond drill holes completed (including 3 abandoned drill holes) with a total of 29,756.5 metres drilled. One planned drill hole was not completed due to ground conditions. Core logging has been completed and the core sampling is to be completed by the end of June.

Similar to the 2010 program, the 2011 program sought to address more than one objective: infill drilling, particularly large gap areas, and exploration drilling. One of the recommendations of the 2009 NI 43-101 report by Watts Griffis and McOuat (WGM) was the infill drilling of numerous drilling gaps, also termed data gaps, within the pit shell area to increase the confidence level of the mineral resources. On Block A, drill spacing of closer than 80 metres is required for the category of inferred resources and closer than 40 metres for indicated resources. The 2010 and 2011 winter program targeted regions with spacing greater than 80 metres within the pit area. A total of 53 drill holes, approximately 76% of the winter 2011 drill program, were drilled on 40 metre by 40 metre centres to increase the confidence level of the mineral resources. All nine drill holes are part of the infill drilling area of Block A.

Ian Lambert, CEO of Trade Winds, commented "Our 2011 winter drill program has been successful, with the total metres being drilled within the scheduled time frame. We are continuing to process and sample drilled core as planned, and are very pleased with the results announced to date. The first twenty three of sixty nine drill holes within the infill zone of the pit shell contain numerous intercepts of above pit-grade mineralization, and will add confidence to the updated Block Model and resource calculation to be undertaken at the end of this year's program."

Current Results from Block A - Winter 2011 Drill Program:

-***-


Drill Hole Zone From To Length Grade Single or
metres metres metres g/t Au Composite
uncut Sample
TWDDH282A Hanging Wall 24.0 25.0 1.0 4.13 S
TWDDH282A Hanging Wall 42.6 44.0 1.4 1.14 S
TWDDH282A Hanging Wall 137.0 137.6 0.6 4.86 S
TWDDH282A Hanging Wall 172.8 174.0 1.2 1.45 S
TWDDH282A Hanging Wall 216.5 217.2 0.7 1.30 S
TWDDH282A Hanging Wall 280.0 281.0 1.0 1.74 S
TWDDH282A Foot Wall 330.0 331.0 1.0 1.26 S
TWDDH282A Foot Wall 353.0 354.0 1.0 1.02 S
TWDDH282A Foot Wall 365.0 366.0 1.0 1.56 S

TWDDH283 Hanging Wall 15.0 17.0 2.0 1.23 C
TWDDH283 M Zone 49.0 58.0 9.0 0.85 C
including 50.0 50.5 0.5 4.18 S
TWDDH283 M Zone 61.0 63.0 2.0 3.83 C
including 62.0 63.0 1.0 7.10 S
TWDDH283 M Zone 72.0 75.0 3.0 2.74 C
including 74.0 75.0 1.0 7.76 S
TWDDH283 M Zone 80.0 82.0 2.0 0.99 C
TWDDH283 Foot Wall 106.0 107.0 1.0 1.85 S

TWDDH284 Hanging Wall 67.0 68.0 1.0 1.37 S
TWDDH284 Hanging Wall 86.0 87.0 1.0 1.14 S
TWDDH284 Hanging Wall 135.0 136.0 1.0 1.64 S
TWDDH284 Hanging Wall 140.0 155.0 15.0 4.37 C
including 149.7 150.0 0.3 127.00 S
TWDDH284 M Zone 159.0 162.0 3.0 1.56 C
TWDDH284 M Zone 193.0 193.3 0.3 5.81 S


Drill Hole Zone From To Length Grade Single or
metres metres metres g/t Au Composite
uncut Sample
TWDDH284 Foot Wall 279.0 280.0 1.0 0.98 S
TWDDH284 Foot Wall 285.0 286.0 1.0 0.98 S
TWDDH284 Foot Wall 299.0 302.0 3.0 0.62 C
TWDDH284 Foot Wall 324.0 328.0 4.0 2.96 C
TWDDH284 Foot Wall 359.0 360.0 1.0 1.95 S
TWDDH284 Foot Wall 377.0 378.0 1.0 1.58 S
TWDDH284 Foot Wall 395.0 395.6 0.6 0.94 S

TWDDH285 Hanging Wall 32.0 37.0 5.0 1.34 C
TWDDH286 Foot Wall 37.6 38.0 0.4 1.38 S
TWDDH285 Hanging Wall 42.0 43.0 1.0 4.39 S
TWDDH285 Hanging Wall 61.0 63.0 2.0 2.35 C
including 61.0 61.3 0.3 12.40 S
TWDDH285 M Zone 108.0 109.0 1.0 1.19 S
TWDDH285 Foot Wall 139.0 154.0 15.0 1.02 C
including 153.1 154.0 0.9 5.48 S
TWDDH285 Foot Wall 176.7 180.0 3.3 0.77 C
TWDDH285 Foot Wall 186.0 187.0 1.0 1.55 S
TWDDH285 Foot Wall 217.0 219.0 2.0 0.93 C
TWDDH285 Foot Wall 235.0 236.6 1.6 0.98 C
TWDDH285 Foot Wall 307.0 308.0 1.0 5.17 S
TWDDH285 Foot Wall 371.0 372.0 1.0 1.24 S
TWDDH285 Foot Wall 376.0 377.0 1.0 7.59 S
TWDDH285 Foot Wall 383.0 384.0 1.0 1.62 S

TWDDH286 Hanging Wall 60.5 63.0 2.5 27.83 C
including 61.0 62.0 1.0 53.10 S
TWDDH286 Hanging Wall 66.0 68.0 2.0 0.84 C
TWDDH286 Hanging Wall 71.0 72.0 1.0 5.62 S
TWDDH286 M Zone 110.0 117.0 7.0 1.24 C
TWDDH286 Foot Wall 161.0 161.7 0.7 5.47 S
TWDDH286 Foot Wall 164.0 166.2 2.2 0.92 C
TWDDH286 Foot Wall 170.0 172.0 2.0 1.33 C
TWDDH286 Foot Wall 174.0 175.0 1.0 2.07 S
TWDDH286 Foot Wall 227.8 232.0 4.3 0.95 C
TWDDH286 Foot Wall 256.0 256.7 0.7 4.62 S
TWDDH286 Foot Wall 319.0 320.0 1.0 7.13 S
TWDDH286 Foot Wall 381.0 382.0 1.0 5.76 S
TWDDH286 Foot Wall 389.0 390.0 1.0 4.56 S

TWDDH287 Hanging Wall 42.0 43.0 1.0 0.91 S
TWDDH287 Hanging Wall 182.0 183.0 1.0 1.13 S
TWDDH287 Hanging Wall 202.0 205.0 3.0 1.24 C
TWDDH287 Hanging Wall 214.0 218.0 1.0 0.78 S
TWDDH287 Hanging Wall 319.0 320.0 1.0 17.00 S
TWDDH287 M Zone 345.4 353.0 7.6 1.89 C
including 351.0 352.0 1.0 5.03 S


Drill Hole Zone From To Length Grade Single or
metres metres metres g/t Au Composite
uncut Sample
TWDDH287 Foot Wall 361.0 364.0 3.0 4.64 C
including 361.0 362.0 1.0 10.30 S
TWDDH287 Foot Wall 370.5 372.9 2.4 2.62 C
TWDDH287 Foot Wall 389.0 392.4 3.4 0.83 C
TWDDH287 Foot Wall 412.0 416.0 4.0 1.80 C
including 412.0 413.0 1.0 6.18 S
TWDDH287 Foot Wall 423.0 424.0 1.0 12.00 S

TWDDH288 Hanging Wall 27.0 28.0 1.0 1.64 S
TWDDH288 Hanging Wall 40.0 41.0 1.0 1.00 S
TWDDH288 Hanging Wall 86.0 87.0 1.0 2.72 S
TWDDH288 Hanging Wall 110.0 111.0 1.0 1.67 S
TWDDH288 M Zone 179.0 184.0 5.0 1.19 C
TWDDH288 Foot Wall 197.0 198.0 1.0 1.11 S
TWDDH288 Foot Wall 224.0 226.0 2.0 0.85 C
TWDDH288 Foot Wall 242.0 244.0 2.0 61.11 C
including 243.0 244.0 1.0 113.00 S
TWDDH288 Foot Wall 255.0 256.0 1.0 2.37 S

TWDDH289 Hanging Wall 57.0 63.0 6.0 0.99 C
TWDDH289 Hanging Wall 74.0 77.0 3.0 18.61 C
Including 76.0 77.0 1.0 32.20 S
TWDDH289 Hanging Wall 92.0 93.0 1.0 1.17 S
TWDDH289 Hanging Wall 101.0 103.4 2.4 3.45 C
Including 103.0 103.4 0.4 17.50 S
TWDDH289 Hanging Wall 112.0 115.0 3.0 1.10 C
TWDDH289 Hanging Wall 127.8 131.0 3.2 0.85 C
TWDDH289 Hanging Wall 137.0 143.0 6.0 0.72 C
including 142.0 143.0 1.0 2.41 S
TWDDH289 Hanging Wall 150.9 151.7 0.7 1.58 S
TWDDH289 M Zone 179.0 181.0 2.0 1.60 C
TWDDH289 M Zone 193.8 199.0 5.2 10.23 C
Including 197.0 198.0 1.0 46.50 S
TWDDH289 Foot Wall 239.2 240.0 0.8 1.11 S
TWDDH289 Foot Wall 252.3 253.1 0.8 1.94 S
TWDDH289 Foot Wall 290.0 291.0 1.0 1.07 S
TWDDH289 Foot Wall 299.0 300.0 1.0 3.37 S
TWDDH289 Foot Wall 305.0 308.0 3.0 0.92 C
TWDDH289 Foot Wall 329.6 330.0 0.4 1.07 S
TWDDH289 Foot Wall 351.0 352.0 1.0 1.24 S

TWDDH290 Hanging Wall 64.0 65.0 1.0 1.63 S
TWDDH290 Hanging Wall 82.4 82.8 0.4 3.05 S
TWDDH290 Hanging Wall 86.0 87.0 1.0 1.08 S
TWDDH290 Hanging Wall 97.0 101.0 4.0 1.02 C
TWDDH290 Hanging Wall 113.6 114.2 0.6 1.38 S
TWDDH290 Hanging Wall 116.5 117.0 0.5 2.23 S


Drill Hole Zone From To Length Grade Single or
metres metres metres g/t Au Composite
uncut Sample
TWDDH290 Hanging Wall 135.0 144.0 9.0 1.86 C
Including 142.0 142.4 0.4 12.00 S
TWDDH290 Hanging Wall 153.0 154.0 1.0 1.70 S
TWDDH290 M Zone 166.1 168.0 1.9 4.49 C
TWDDH290 M Zone 173.0 178.0 5.0 1.60 C
TWDDH290 M Zone 181.0 181.4 0.4 1.14 S
TWDDH290 Foot Wall 203.0 213.0 10.0 1.44 C
Including 212.1 212.5 0.4 15.40 S
TWDDH290 Foot Wall 216.0 219.0 3.0 0.84 C
TWDDH290 Foot Wall 236.0 238.0 2.0 3.99 C
TWDDH290 Foot Wall 259.0 262.0 3.0 2.30 C
TWDDH290 Foot Wall 266.0 267.0 1.0 1.18 S
TWDDH290 Foot Wall 283.0 284.0 1.0 1.90 S
TWDDH290 Foot Wall 289.0 297.0 8.0 0.80 C
TWDDH290 Foot Wall 342.0 343.0 1.0 1.20 S
TWDDH290 Foot Wall 359.0 360.0 1.0 1.36 S
TWDDH290 Foot Wall 381.0 386.0 5.0 1.72 C
TWDDH290 Foot Wall 408.5 410.0 1.5 1.20 C
TWDDH290 Foot Wall 418.0 419.0 1.0 2.33 S

-****-


Quality Assurance and Quality Control ("QA/QC") Program for Core Sampling

The Company has implemented a quality control program to ensure best practices in sampling, analysis and security of core samples. The drill core is first logged then sawn in half during the sampling process with half being retained for verification and reference purposes. During sample collection and assaying, there is an established QC procedure which includes the insertion into the sample stream of standard reference samples, sample duplicates and blank samples, including the insertion of blank samples after all samples with visible gold.

The samples are delivered direct to Activation Laboratories Ltd. (ActLabs) preparation facility in Timmins, Ontario by Trade Winds personnel. The samples are analyzed for gold using the ActLabs procedure 1A2-50, which is a 50 g fire assay with AA finish. Samples returning greater than 3 g/t Au are automatically processed using a fire assay-gravimetric finish. Total metallic assays for gold were also performed on selected intervals. All samples assayed by ActLabs include a standard multi-element ICP package. The coarse rejects are kept in Timmins for re-assaying purposes for a period of up to six months and then returned to the Trade Winds site for long term storage. Selected coarse rejects and pulps are check assayed by third party laboratories other than ActLabs.

The material in this news release has been prepared and reviewed by Stephen Wallace, P. Geo, VP Exploration, a Qualified Person as defined in NI 43-101.

ABOUT TRADE WINDS VENTURES INC.

Trade Winds Ventures Inc. has been named to the 2011 TSX Venture 50, a ranking of strong performing companies listed on TSX Venture Exchange. The 2011 TSX Venture 50 is comprised of ten companies from each of five sectors; Clean Technology, Mining, Oil & Gas, Diversified Industries, and Technology & Life Sciences. The 2011 TSX Venture 50 companies were chosen based on the following criteria, with equal weighting assigned to each: share price appreciation, trading volume, market capitalization growth and analyst coverage. TSX Venture 50 is a trade-mark of TSX Inc. and is used under license.

FOR FURTHER INFORMATION PLEASE CONTACT:
Ian D. Lambert, CEO/President
(416) 840-9843

Terry McGee, Investor Relations
Toll Free (866) 698-9187 ext 228
or
(604) 648-6228

Email: info@tradewindsventures.com
Visit our Website at
www.tradewindsventures.com

Forward Looking Information

Certain information included in this news release constitutes "forward-looking statements". The words "expect", "will", "intend", "estimate" and similar expressions identify forward-looking statements. Forward-looking statements are necessarily based upon a number of estimates and assumptions that, while considered reasonable by management, are inherently subject to significant business, economic and competitive uncertainties and contingencies. Trade Winds cautions the reader that such forward-looking statements involve known and unknown risks, uncertainties and other factors that may cause the actual results, performance or achievements of Trade Winds to be materially different from Trade Winds' estimated future results, performance or achievements expressed or implied by those forward-looking statements and the forward-looking statements are not guarantees of future performance. These risks, uncertainties and other factors include, but are not limited to, risks associated with the mining industry such as government regulation, environmental and reclamation risks, title disputes or claims, success of mining activities, future commodity prices, costs of production, possible variation in mineral reserves, mineral resources, grade or recovery rates, failure of plant, equipment or processes to operate as anticipated, accidents, labour disputes, the timing of estimated future production, capital expenditures, financial market fluctuations, requirements for additional capital, conclusions of economic evaluations, limitations on insurance coverage, risks associated with using third-party contractors and inflation. Trade Winds disclaims any intention or obligation to update or revise any forward-looking statements whether as a result of new information, future events or otherwise, except as required by applicable law.


Neither TSX Venture Exchange nor its Regulation Services Provider (as that term is defined in the policies of the TSX Venture Exchange) accepts responsibility for the adequacy or accuracy of this release.

To view this press release as a web page, please click on the following link:

http://www.usetdas.com/pr/tradewinds06082011.htm

Suite 1006, 1166 Alberni St.
Vancouver, BC V6E 3Z3

Suite 1170, 36 Toronto St.
Toronto, ON M5C 2C5

www.tradewindsventures.com



Source: Trade Winds Ventures Inc. (TWD - TSX-V, TWDIF - Pink Sheets, TVR - Frankfurt) http:www.tradewindsventures.com
Maximum News Dissemination by Filing Services Canada Inc. http://www.usetdas.com

New Message

Please login to post a reply

AGORACOM Quick Tips

Small & Micro Cap 2.0 Blog by George Tsiolis ... Read it Now

President's D.D.

Ian Lambert talks about developing gold and copper assets. read more

Hub Leaders