TYHEE GOLD CORP
(PRESS PROFILE TAB FOR FACT SHEET & UPDATES)
  • Demo Video
  • Private Messages
  • Edit My Profile
  • View/Edit Portfolio

AGORACOM News Flash

AGORACOM WIRE - FRIDAY MAY 25TH, 2012

FOCUS METALS (TSXV:FMS) Changes Its Name to Focus Graphite Inc.

  • Aim to develop and manufacture the best technology graphite in the world
  • Additional shareholder value will come from investment in commercialized graphene through joint venture partner, Grafoid Inc.

Read More   |   *SPONSOR

INTERNATIONAL PBX VENTURES (TSX:PBX) Signs Copaquire Joint Venture Option Agreement - $90M Potential Payment Read More

AGORACOM Maintenance Alert: Friday Evening Downtime for About an Hour Read More

LOMIKO METALS (TSXV:LMR) Graphite and Zinc Price Outlook is Favourable Through 2013  Read More   |   *SPONSOR

 

 

Message: Ice road open but not yet Tyhee route

John-bolton-bigotes-yosemeti-sam-un
Rank: [?]
President
Points: [?]
4636
Rating: [?]
Votes: 81 Score: 3.4
  • Currently 3.5/5 Stars.
Did you know? You can earn activity points by filling your profile with information about yourself (what city you live in, your favorite team, blogs etc.

Ice road open but not yet Tyhee route

posted on Feb 06, 12 07:53PM

http://www.jvtcwinterroad.ca/jvwr/ Choose 2012 update:

In short, main road open but Tyhee route not yet.

The TCWR season officially opened at 8:00AM, January 27th, 2012. All loaded lanes were open with a minimum ice thickness was 28”. A gradual build-up of traffic was implemented with a targeted volume of four (4) trucks dispatched ever four (4) hour for the first operational day, for a total of 24 loads. The second day traffic volume was four (4) trucks dispatched every two (2) hours for a total of 48 loads. The targeted number of loads for the two day period was 72 north bound loads. Total number of loads dispatched for the first day was 18 north bound loads. The second day load count is to be confirmed.

Speed limits for loaded traffic and Hot Shots remains 25kms/hour or as posted.

The majority of express lanes have been cleared and all expected to be open to empty southbound traffic within the next few days. Express lanes that are opening will be clearly identified with appropriate roadway signage.

EBA geometric survey is currently ongoing.

Secondary Route - Prosperous Lake to Gibbs Lake

Ice profiling continued this week, with 3 line profile completed on this section. Prosperous to Giauque now has recorded centre line of 22”minimum, most of the left and right are sides 21” minimum with a few small sections at 19”.

Flood crews have continued target flooded low ice sections from Clan to Giauque. Final portage construction started this week and has progressed from P70 on Prosperous to P75 at Quyta.

Ploughing of lakes to full width from Smoky to Gibb was completed. Ice profiling continued this week. 3 line profiling of Giauque and Thistlethwaite shows recorded minimum of 27”. Recorded centre line from Smoky to Gibb has minimums of 19”. Ponds north of Smoky to Gibb have minimums 15 to 17” on left and right sides.

Flood crews have concentrated target flooding on the ponds north of Smoky and Gibb lake. Final portage construction started this week and has progressed from P108 at Gibbs to P104 on Smoky.

New Message

Please login to post a reply

AGORACOM Quick Tips

Recent Drill Results: 63m of 1.21 g\t gold and 2m of 13.95 g/t gold ... Learn More!

President's D.D.

CEO Brian Briggs' Report read more