AGORACOM WIRE - FRIDAY MAY 25TH, 2012
FOCUS METALS (TSXV:FMS) Changes Its Name to Focus Graphite Inc.
Read More | *SPONSOR
INTERNATIONAL PBX VENTURES (TSX:PBX) Signs Copaquire Joint Venture Option Agreement - $90M Potential Payment Read More
AGORACOM Maintenance Alert: Friday Evening Downtime for About an Hour Read More
LOMIKO METALS (TSXV:LMR) Graphite and Zinc Price Outlook is Favourable Through 2013 Read More | *SPONSOR
|
Copied from tradingchief #49282 - XOR 43-101 News |
X-Ore Resources Inc
Symbol XOR
Shares Issued 86,034,704
Close 2009-08-10 C$ 0.05
Recent Sedar Documents
X-Ore, First Gold's Croinor at 238,414 oz Au M+I
2009-08-11 07:31 MT - News Release
Also News Release (C-EFG) First Gold Exploration Inc
Mr. Leon Methot of X-Ore reports
X-ORE RESOURCES AND FIRST GOLD EXPLORATION COMPLETE A NEW RESOURCE ESTIMATE ON CROINOR
Managements of joint venture partners X-Ore Resources Inc. and First Gold Exploration Inc. have released a new National Instrument 43-101-compliant resource estimate for the Croinor property, located east of the town of Val d'Or, Abitibi, Que.
This new resource estimate follows two years of intensive exploration drilling (approximately 13,000 metres) along the down-dip and lateral extensions of the Croinor gold deposit. All results have been compiled and a reinterpretation of the entire deposit was performed. It is now believed that the deposit consists of numerous east-west elongated, shallowly north-dipping and plunging mineralized shoots. This is a significant change from previous interpretations which indicated a series of discontinuous tabular structures. Individual mineralized shoot extends laterally from 50 metres up to 250 metres.
The tables show the indicated resource and the measured resource for each vein and finally a summary of the indicated and measured resources at cut-off grades of five grams per tonne (g/t) Au (base case for the resource estimate) and seven g/t Au.
INDICATED RESOURCES
Cut-off 5.00 g/t Au Cut-off 7.00 g/t Au
Zone Tonnes g/t Ounces Tonnes g/t Ounces
A2 41,007 8.685 11,450 20,705 11.566 7,699
A4 17,469 10.468 5,879 11,136 13.316 4,767
A5 78,439 10.985 27,703 51,546 13.655 22,629
A6 74,650 9.346 22,432 39,922 12.447 15,975
A11 2,978 10.753 1,030 2,978 10.753 1,030
B1 15,346 7.451 3,676 7,247 8.660 2,018
C1 61,496 9.225 18,239 39,073 11.236 14,115
C2 52,895 6.632 11,279 8,955 11.093 3,194
C3 8,679 5.530 1,543
C4 64,868 9.223 19,234 33,591 12.676 13,689
C5 35,044 6.628 7,468 11,515 8.482 3,140
C6 13,384 13.550 5,830 5,914 23.483 4,465
C7 15,507 9.342 4,658 15,049 9.434 4,565
C8 33,315 8.37 8,962 16,081 11.35 5,869
C9 9,305 6.181 1,849 2,836 7.223 659
C10 8,261 5.694 1,512
C11 18,877 6.833 4,147 5,750 8.880 1,642
C12 1,105 9.260 329 1,105 9.260 329
C13 1,144 10.950 403 1,144 10.950 403
D1 13,046 5.475 2,296
D2 73,574 10.402 24,605 30,540 17.038 16,729
D3 79,023 9.928 25,223 40,394 14.136 18,358
D5 63,624 9.802 20,050 40,154 12.502 16,140
Total indicated 783,036 9.13 229,799 385,636 12.70 157,416
MEASURED RESOURCES
Cut-off 5.00 g/t Au Cut-off 7.00 g/t Au
Zone Tonnes g/t Ounces Tonnes g/t Ounces
A2 1,029 7.47 247 1,029 7.47 247
A4 3,729 11.45 1,373 1,211 22.23 865
A5 13,037 9.27 3,883 8,551 11.04 3,035
A6 9,038 7.47 2,171 1,816 13.00 759
C2 1,393 7.16 321 1,393 7.16 321
C4 1,881 7.22 437 1,211 22.23 865
C5 1,085 5.27 184
Total measured 31,192 8.59 8,615 15,210 12.46 6,092
MEASURED and INDICATED RESOURCES
Cut-off 5.00 g/t Au Cut-off 7.00 g/t Au
Category Tonnes g/t Ounces Tonnes g/t Ounces
Total measured 31,192 8.59 8,615 15,210 12.46 6,092
Total indicated 783,036 9.13 229,799 385,636 12.70 157,416
------- ---- ------- ------- ----- -------
Total 814,228 9.11 238,414 400,847 12.69 163,507
======= ==== ======= ======= ===== =======
This new NI 43-101-compliant resource estimate was performed by Pierre O'Dowd, PGeo, independent consulting geologist and qualified person under NI 43-101, based on the review of 832 diamond drill holes and all available technical information and previous report. The latter used the same geological parameters as the ones used by the firm InnovExplo for its 2005 estimate. The main parameters are:
Minimum mining width of 1.8 metres;
Polygons drawn on cross-sections;
Polygons extend vertically and laterally to half the distance in between intercepts to a maximum of 20 metres;
Grade capped at 65 g/t Au;
Specific gravity of 2.8;
Five g/t Au cut-off as base case.
This current estimate shows a 15-per-cent increase in the number of ounces of gold over the 2005 estimate (from 206,792 ounces Au to 238,414 ounces Au). As noted above, the average grade of the deposit, using five g/t Au cut-off grade, was established at 9.11 g/t Au. A technical report presenting all information pertaining to the resource estimate, in conformity to Appendix NI43-101A1, will be filed shortly on SEDAR within the prescribed time frame.
In recent news, it was announced that a scoping study was completed based on the 2005 resource estimate (July 15, 2009). The scoping study, performed by Golder and Associates of Val d'Or, indicates that approximately 80,000 ounces of gold could potentially be extracted economically at Croinor. It is believed that, based on the new resource estimate and the new geological model for the mineralization, the economics of the deposit can be further improved. The partners, X-Ore and First Gold, have now started the procedures to obtain necessary permits to initiate the rehabilitation of the underground workings. Note that this scoping study is preliminary in nature and includes mineral resources that are not mineral reserves and do not have demonstrated economic viability. There is no certainty that the preliminary assessment will be realized as presented since certain engineering parameters related to construction, environment and rocks mechanics will have to be validated at the preproduction phase.
The revised model for the deposit opens a significant area of prospective ground which will hopefully increase resources while the development of the deposit is continuing. Previous programs targeted the up- and down-dip extensions of known auriferous intercepts. Future drilling programs will target lateral extensions which exhibit a much better continuity.
Mr. O'Dowd (OGQ No. 668), a qualified person under NI 43-101, has revised and approved the technical content of this release. Mr. O'Dowd has accumulated more than 30 years in exploration experience in Canada and worldwide having worked with companies such as Falconbridge, Noranda, Cambior (Doyon mine) before starting his consulting firm in 1995.
We seek Safe Harbor.
Please login to post a reply
Like X-Ore Resources? Then you might also be interested in McLaren Resources
Forgot your username or password?
Recover it here
Not a member yet?
Register
You can now log in to Agoracom using your existing Facebook account. Click below to log in automatically.
