Full Text Posts Of Front Page Stories and Blog Posts On AGORACOM
  • Demo Video
  • Private Messages
  • Edit My Profile
  • View/Edit Portfolio

Widget

Add Agoracom Updates widget to your own site or blog

AGORACOM News Flash

AGORACOM WIRE - WEDNESDAY MAY 30TH, 2012

GOLDEN HOPE MINES (TSXV:GNH) Confirms High Grade Intersection of 64.1 g/t Au (Gold) over 1m Read More 

  • The screen metallic analysis returned 82 g/t Au for an average grade of 93.5 g/t Au.
  • Two additional fire assays on the original pulp done prior to the screen metallic analyses returned 0.22 g/t Au and 0.12 g/t Au for an average fire assay grade of 0.41 g/t Au. The weighted average of all the fire assays and screen metallic assays from this 1-metre section in hole BD2011-184 is 64.1 g/t Au.

Sonomax® eers™ Custom Earbuds Announces Sponsorship of MUTEK 2012

CONTINENTAL ENERGY  Geothermal Energy Project Receives US$ 11.5 Million Grant Read More * Client

AGORACOM Launches Graphite Stocks Blog

Top Stories

  • FOCUS METALS (TSXV:FMS) Changes Its Name to Focus Graphite Inc. Read More   |   *SPONSOR

  • LOMIKO METALS (TSXV:LMK) Paul Gill Discusses Exploration Initiative with James West of Midas Letter Read More   |   *SPONSOR
  • GRAPHITE DEMAND Seen Surging from Fuel Cells, Nuclear Reactors, Graphene Read More

 

 

Message: Atacama Reports 20% Increase in Ore Reserves

Generic_profile
Rank: [?]
Mail Room
Points: [?]
125
Rating: [?]
Votes: 0
  • Currently 0.0/5 Stars.
Did you know? You can earn activity points by filling your profile with information about yourself (what city you live in, your favorite team, blogs etc.

Atacama Reports 20% Increase in Ore Reserves

posted on Feb 20, 07 10:30AM

VANCOUVER, BRITISH COLUMBIA, Feb 20, 2007  -- Atacama Minerals Corp. ("Atacama" or the "Company") (TSX VENTURE:AAM) is pleased to announce that as a result of the on-going drill program at its Aguas Blancas iodine/sulphate/nitrate mine in northern Chile, the total Proven and Probable reserves at Aguas Blancas has increased to a total of 24.6 million tonnes, an increase of approximately 4 million tonnes, or twenty percent, from the previous estimate made in June, 2005 (see news release dated June 16, 2005). Since that time, approximately 2.1 million tonnes of ore has been extracted and processed and with the successful step-out exploration drilling, there has been essentially no net change to the overall resource base.

The new Reserve and Resource estimates are as follows:


---------------------------------------------------------------
Category         Tonnes        Iodine     Sulphate      Nitrate
              (millions)   (I2 in ppm)   (S04 in %)   (N03 in %)
---------------------------------------------------------------
Reserves
---------------------------------------------------------------
Proven            3.566           589         27.8         1.98
---------------------------------------------------------------
Probable         21.078           511         17.1         3.29
---------------------------------------------------------------
Total            24.644           522         18.6         3.10
---------------------------------------------------------------

---------------------------------------------------------------
Resources
---------------------------------------------------------------
Measured          3.898           613         28.2         1.92
---------------------------------------------------------------
Indicated        23.635           532         17.4         3.40
---------------------------------------------------------------
Total            27.533           543         18.9         3.19
---------------------------------------------------------------

---------------------------------------------------------------
Inferred         51.636           451          9.0         1.94
---------------------------------------------------------------

The Measured and Indicated resources are inclusive of the reported Proven and Probable reserves, which represent those parts considered as being economically viable, according to CIM Definitions and Guidelines as required by National Instrument 43-101.

Adam Wheeler and Bob Dowdell, independent consultants and Qualified Persons pursuant to NI 43-101, were commissioned to prepare a reserve and resource estimate in accordance with NI 43-101 based on results of recent drilling, analytical results and density measurements.

The resource estimate, dated January, 2007, was based on an iodine cut-off grade of 200 ppm. The volumetric estimates were made from 3 dimensional block models utilizing commercial mine modeling software. The measured and indicated resources contain blocks estimated for iodine, sulphate, and nitrate in two domains of the Aguas Blancas area: 1) the Virgin Area, where no previous mining activity has taken place and 2) the Repasos Area, where previous selected mining of shallow nitrate has taken place. The blocks were classified as Measured (50 meter drill grid), Indicated (100 meter drill grid) and Inferred (200 meter drill grid) based on the relative confidence from supporting data for each block. The Reserve estimation parameters were governed by estimated recoverable Iodine and economic estimates which are available in the Technical Report on the Sedar website for Canadian public companies (www.sedar.com ).

Sampling, quality assurance and control procedures (QA/QC) were examined and found to conform to industry standards with selected samples taken for verification by outside, independent laboratories. The Technical Report recommends continued in-fill drilling to convert known Resources to the Reserve category and also recommends continued outside exploration drilling for expansion of the overall resource base. The report also recommends on-going density measurements as standard operating procedure.

Atacama Minerals Corp. is an industrial minerals company producing Iodine from its 100% owned Aguas Blancas Mine in the Atacama Desert of northern Chile. The Aguas Blancas Mine has been in production since 2001 and is currently producing at an average rate of 80 tonnes of high purity iodine per month. Expansion plans are currently underway to increase iodine production to a rate of 120 tonnes per month through the conversion from heap leaching to mechanical agitated leach by the fourth quarter of this year.

On Behalf of the Board,

Edward F. Posey, President

SOURCE: Atacama Minerals Corp.

Atacama Minerals Corp.
Sophia Shane, Corporate Development
(604) 689-7842
(604) 689-4250 (FAX)
Website: www.atacama.com

New Message

Please login to post a reply

AGORACOM Quick Tips

AGORACOM Twitter. Follow our small but powerful market tips .. Follow and Prosper