A Canadian mining exploration company
  • Demo Video
  • Private Messages
  • Edit My Profile
  • View/Edit Portfolio

AGORACOM News Flash

AGORACOM Wire - Wednesday February 15th, 2012

Breaking News ....

Lomiko (LMR: TSX-V) to Complete 43-101 Report on Previous Drilling at the Quatre Milles Graphite Property *CLIENT* Read More

Top Sector Stories ....

Strike Graphite Corp. (TSXV:SRK) Acquires Wagon Graphite Project in Quebec in Vicinity of Timcal's Lac des Iles Graphite Mine *CLIENT* Read More  |  Profile

Strike Graphite goes "Beyond the Press Release"

McLaren Resources (CNSX:MCL) Drills 7.0 Grams Gold Over 7.4 Metres at the TimGinn Property Located Adjacent to the Hollinger Mine *CLIENT* Read More | Watch Beyond the Press Release

DONNER METALS INTERVIEW: David Patterson Discusses the Bracemac-McLeod Mine Development Beyond the Press Release

 AGORACOM Launches GraphiteStocksBlog.com

We're proud to announce the launch of GraphiteStocksBlog.com a website dedicated to the needs of investors and companies in the fast growing Graphite industry.

INAUGURAL GRAPHITE SPONSORS

Message: Arianne Resources Inc.: The Paul Zone Remains Open at Depth

Agoraa_profile
Rank: [?]
President
Points: [?]
19515
Rating: [?]
Votes: 1 Score: 5.0
  • Currently 5.0/5 Stars.
Did you know? You can earn activity points by filling your profile with information about yourself (what city you live in, your favorite team, blogs etc.

Arianne Resources Inc.: The Paul Zone Remains Open at Depth

posted on Feb 16, 10 09:00AM

SAGUENAY, QUEBEC--(Marketwire - Feb. 16, 2010) - The management of Arianne Resources Inc. ("Arianne" or "Company") (TSX VENTURE:DAN)(FRANKFURT:JE9N)(OTCBB:DRRSF) is pleased to announce drilling results from its Lac a Paul phosphate/titanium property located in Quebec, Canada.

This campaign included 18 drill holes for a total of 3,590 metres (PAU-09-14 to PAU-09-31) and took place exclusively on the Paul Zone. The objective was to upgrade a section of the inferred resources of this zone (99.3 Mt of ore grading 7.84% P2O5 and 8.24% TiO2) into indicated resources. A compilation of assay results shows that the mineralized zone reaches a minimal vertical depth of 240 m and remains open at depth. The drill holes intersections are presented in the following table.



---------------------------------------------------------------------------
Length of
drill hole Grades
including ------------- Length of intersection
HOLE overburden P2O5 TiO2 along the hole
---------------------------------------------------------------------------
---------------------------------------------------------------------------
PAU-09-14 171 m. 8.74% 8.33% over 64.45 m. (from 48.55 to 113
m.)
---------------------------------------------------------------------------
PAU-09-15 174 m. 5.64% 6.55% over 96 m. (from 3 to 99 m.)
---------------------------------------------------------------------------
PAU-09-16 201 m. 7.06% 7.38% over 151.5 m. (from 42 to 193.5
m.)
---------------------------------------------------------------------------
PAU-09-17 174 m. 6.67% 5.59% over 84 m. (from 3 to 87 m.)
---------------------------------------------------------------------------
PAU-09-18 192 m. 5.19% 6.01% over 189 m. (du debut to 192 m.)
---------------------------------------------------------------------------
PAU-09-19 201 m. 8.39% 8.66% over 195 m. (from 6 to 201.0 m.)
---------------------------------------------------------------------------
PAU-09-20 249 m. 8.19% 9.45% over 117 m. (from 132 to 249 m.)
---------------------------------------------------------------------------
PAU-09-21 183 m. 4.90% 4.96% over 89.8 m. (from 80.7 to 170.5
m.)
---------------------------------------------------------------------------
PAU-09-22 69 m. 6.53% 6.41% over 61 m. (from 8 to 69 m.)
---------------------------------------------------------------------------
PAU-09-23 177 m. 1.54% 1.65% Outside the Zone
---------------------------------------------------------------------------
PAU-09-24 198 m. 5.26% 4.58% over 192 m. (entire drill hole)
---------------------------------------------------------------------------
PAU-09-25 279 m. 7.44% 7.23% over 273 m. (from 6 to 279 m.)
---------------------------------------------------------------------------
PAU-09-26 279 m. 8.29% 8.37% over 180 m. (from 12 to 192 m.)
---------------------------------------------------------------------------
PAU-09-27 132 m. 6.91% 11.26% over 105m. (from 12to 117 m.)
---------------------------------------------------------------------------
PAU-09-28 92 m. 6.35% 9.87% over 83 m. (from 9 to 92 m.)
---------------------------------------------------------------------------
PAU-09-29 279 m. 7.53% 9.58% over 231 m. (from 30.6 to 261.6
m.)
---------------------------------------------------------------------------
PAU-09-30 279 m. 5.87% 6.91% over 99.7m. (from 11 to 110.7 m.)
---------------------------------------------------------------------------
6.06% 8.64% over 157.6 m. (from 121.4 to 279
m.)
---------------------------------------------------------------------------
PAU-09-31 261 m. 8.76% 11.01% over 231.1 m. (from 14.9 to 246
m.)
---------------------------------------------------------------------------
Total: 3590 m.
--------------------



SGS Geostat Inc. will update the resource estimate of the Paul Zone.

Arianne Resources is a Canadian mining exploration company with the mission to explore and develop gold, silver and phosphate/titanium deposits in Canada and Mexico. The Company has less than 26 M shares outstanding. Investors can visit our website at www.arianne-inc.com.

Neither TSX Venture Exchange nor its Regulation Services Provider (as that term is defined in the policies of the TSX Venture Exchange) accepts responsibility for the adequacy or accuracy of this release.

New Message

Please login to post a reply

AGORACOM Quick Tips

Alaskan Junior Gold Co. with Bonanza Grades ... Learn More!

President's D.D.

New feature: Hub Presidents can add important links here.

Hub Leaders