Focusing on Moly in B.C – Drilling On Lone Pine Property Has Shown High Grades of Moly.
NI 43-01 Resource: Measured + Indicated 110,340,000 tonnes Grading 0.083% Molybdenum
  • Demo Video
  • Private Messages
  • Edit My Profile
  • View/Edit Portfolio

Widget

Add Bard Ventures Ltd. widget to your own site or blog

Email Updates

Search

AGORACOM News Flash

AGORACOM CONFERENCE UPDATE

  • 12 More Companies Added To Schedule For Dec 3 & 4. (See Schedule)
  • Keynote Speakers Include Peter Grandich, Eric Coffin (See Speakers)
  • Workshop Presentations Added To Thursday Schedule
  • Investors from over 45 Countries Have Visited
  • Conference Begins 2 Weeks From Today!

Looking forward to seeing all of you there gang.  Registration is free for investors.  AGORACOM Members register with just one click.  Non-members takes less than 60 seconds.  Register here (see form on right hand side)

 

Message: NEWS - Drilling Intersects 0.15% Mo (0.25% MoS2) Over 276 Meters as Part of 520.0m of 0.11% Mo (0.18% MoS2) At the Lone Pine Property, B.C.

Admin_profile
AGORACOM
Rank: [?]
Administrator
Did you know? You can earn activity points by filling your profile with information about yourself (what city you live in, your favorite team, blogs etc.)

NEWS - Drilling Intersects 0.15% Mo (0.25% MoS2) Over 276 Meters as Part of 520.0m of 0.11% Mo (0.18% MoS2) At the Lone Pine Property, B.C.

posted on May 27, 08 03:02AM

VANCOUVER, BRITISH COLUMBIA--(May 27, 2008) - Bard Ventures Ltd. ("Bard" or the "Company") (TSX VENTURE:CBS) is pleased to announce the following drill results from its Lone Pine Molybdenum Property (the "Property"). The Property is located approximately 15 kilometers north-northwest of Houston, BC, and is situated in the Omineca Mining Division. Final assay results have been received and interpreted from drill hole BD-08-29, which was drilled vertically to a depth of 803.71m.

The significant intervals for drill hole BD-08-29 are tabulated below:

 
Drill hole BD-08-29 was designed to follow up the northwest trend of the higher grade molybdenum mineralization initially encountered in drill hole BD-08-25. Drill hole BD-08-25 intersected 730.9m of 0.10% molybdenum including 130.1m of 0.20% molybdenum. BD-08-29 was collared 100 meters to the northwest of BD-08-25 and collared into andesitic rocks through to approximately 127m before encountering the favourable Alaskite intrusive. Alaskite continued through to approximately 754m and was shutdown in the Quartz Feldspar Porphyry at 803.71m.

The Alaskite intrusive is the main focus of the Lone Pine Property drilling and has been interpreted as being the most favorable lithology for molybdenum mineralization. To date, the Alaskite intrusive is 300m in length along its northwest-southeast strike and 310m wide in plan view and molybdenum mineralization has been tested to a known depth of 843m. A higher grade corridor of molybdenum mineralization has been outlined within the Alaskite intrusive as shown in the favourable assay results from BD-07-16, BD-08-24 to BD-08-28, and now BD-08-29.

Of importance to note is the existing infrastructure on the Property, which includes Highway 16, natural gas pipeline, a major hydro power transmission line and transformer sub-station, and it is located only 15 kilometers from the CN rail line in Houston, BC.

Bard is earning a 100% interest in the Property under the terms of an option agreement (see News Release dated September 15, 2006). The Lone Pine exploration work is being conducted under the supervision of Qualified Person Jim Miller-Tait, P. Geo., a Director of Bard.

Samples from BD-08-29 were analyzed at Eco Tech Laboratories in Kamloops, British Columbia. Analytical procedures consist of a 28 element ICP analysis; package BICP-11, followed by assay for any molybdenum ICP analyses greater than 500 ppm.

On behalf of:

Bard Ventures Ltd.

Eugene Beukman, President

This release includes certain statements that may be deemed to be "forward-looking statements" within the meaning of the U.S. Private Securities Litigation Reform Act of 1995. All statements in this release, other than statements of historical facts, that address future production, reserve potential, exploration and development activities and events or developments that the Company expects, are forward-looking statements. Although management believes the expectations expressed in such forward-looking statements are based on reasonable assumptions, such statements are not guarantees of future performance, and actual results or developments may differ materially from those in the forward-looking statements. Factors that could cause actual results to differ materially from those in forward-looking statements include market prices, exploration and development successes, continued availability of capital and financing, and general economic, market or business conditions. Please see our public filings at www.sedar.com for further information.

For all Bard Ventures Ltd. investor relations needs investors are asked to visit the Bard Ventures Ltd. IR Hub at http://www.agoracom.com/IR/bardventures where they can post questions and receive answers within the same day, or simply review questions and answers posted by other investors. Alternatively, investors are able to e-mail all questions and correspondence to cbs@agoracom.com where they can also request addition to the investor e-mail list to receive all future press releases and updates in real time.


The TSX Venture Exchange has not reviewed and does not accept responsibility for the adequacy or accuracy of content of this press release.

CONTACT INFORMATION:

Bard Ventures Ltd.
Eugene Beukman
President
(604) 687-2038
Fax: (604) 687-3141
Website: www.bardventures.com

New Message

Please login to post a reply

AGORACOM Quick Tips

Testimonials. Members Sure Love AGORACOM! ... Get On The List!

Executive Address

Cbs-beukman-bc
Eugene Beukman
President & CEO
September 03, 2009

Eugene Beukman Provides Update On 200M Lbs. Molybdenum Resource

View Broadcast