Skip to content
Sign in

Post

The 300 Club

Replies

  1. I've been at this site. It's close to the Alaska Highway. The former mill site is visible from the highway, and the mine is only about 5 k up from it. Hudbay put in an all weather road, so there's no need for permitting one. But it's low grade. Burwash and D Bay are on generators, not on the grid, so feasibility will have to include diesel generation. Been watching the property for years. I'm still not sure I can bring myself to believe in it.

    There are much better prospects.

    1. Thanks for the info. Reading the ownership of this propety over the last 20 years

      is like watching tennis.

      However, their 1.4 billion tonne Mongolian Coal deposit makes this PCY very attractive.


      from SH ....
      FWIW, somebody took my advice and emailed PCY'S CEO John Lee earlier today and John replied back in 5 mins. Amazing, esp on a Sunday.

      Apparently, John basically said "permit is a formality, free to produce coal, offtake before year end."

      Speed
      11/8/2010 7:37:26 AM | | 184 reads | Post #28814637
      The official mine opening ceremony is on the 20th of this month. I expect to see some Govt. officials and maybe some Representatives from Russia there.