English translation and from the tonnage and the CAPEX, it's for both MOP and SOP:

(Google translate)

Allana Potash Canada's plans to cut in the Dallol Depression in Afar Regional State potash from 2017 . The incidence is estimated at 3.2 billion tonnes. The project is expected to cost together with the necessary infrastructure $ 1.2 billion . The annual earning is estimated at $ 430 million . The potash lies at a depth of 100 m. The temperatures in the valley move in a range of 45 to 60C . Thanks to these two factors, it is probably the most cost-effective degradation worldwide, says Allana President Farhad Abasov . The potash will be delivered via Djibouti mainly in Africa , Southeast Asia and the PRC.