Skip to content
Sign in

Post

CGX Energy Inc

The post this replies to is no longer available.

Prez3.4 rating from 62 members5.3K ptsRate

Re: NR..seismic started

Correct me if I'm wrong but I thought that the origional seismic that CGX had contracted for the 500 sq. kil's would take @ month or so so, but since they JV'D with repsol on the seismic and increased the area to be mapped to 1600 sq. kil's (if memory serves me) I would think that the mapping will take quite a bit longer. Nice to have you on this MB Corndog, the more input the better. All the best Zibo.

Join the conversation about CGX Energy Inc.

Reply