Nice move today
Maybe Murphy's well hit some hydro Carbons.
Join the conversation about CGX Energy Inc.
ReplyMaybe Murphy's well hit some hydro Carbons.
Join the conversation about CGX Energy Inc.
Reply
Well #1: November 2010 (Atwood Beacon, Block 37, Murphy Oil, Suriname)
The first well of the four-well Atwood Beacon program spud in early November on Murphy Oil’s 100%-owned Block 37 (located offshore Suriname) and is expected to take approximately 50 days to complete. Was spud November 8, so we are within a week of completion. Well #2: January 2011 (Atwood Beacon, Block 37, Murphy Oil, Suriname)
The second well of the four-well Atwood program is expected to spud in early January, target Murphy Oil’s Aracari Prospect and take 30 days to complete. By end of January both wells 1 & 2 could be finished.
I hope most of you remember that Shell already has drilled this area long ago. In fact we'll be drilling very very close to this hole (if I'm not mistaken it might even be reentering?). This well produced something like 3300 bbl/day. But was abandoned due to political instability in Guyana. This means there is pretty much no doubt about a rising SP in 2011. The expectations will be high, fast. But we still have a number of months to go...