This company is moving in slow motion. We go another week without drilling and the month will be half gone. Something has to happen soon. IMO
Join the conversation about Canadian Imperial Venture.
ReplyThis company is moving in slow motion. We go another week without drilling and the month will be half gone. Something has to happen soon. IMO
Join the conversation about Canadian Imperial Venture.
ReplyMr. Steven Millan reports
UPDATE
Canadian Imperial Venture Corp. has provided the following update.
Currently, the 2K-39 well is at 2,865 metres and the hole is being conditioned prior to running intermediate casing. Following the casing run, the hole will be drilled ahead to penetrate the primary target horizons, the Aguathuna and Watt's Bight formations.
The operator, Shoal Point Energy Ltd., estimates in a May 9 news release that it will be two to three weeks before drilling of the Aguathuna commences.
Just another news article to count the days from or till news..... Canadian Imperial Begins Drilling on Shoal Point, Newfoundland Wednesday, March 05, 2008 Canadian Imperial Venture Corp. has been informed by the operator, Shoal Point Energy Ltd., that drilling commenced today on the Shoal Point et al 2K-39 well in western Newfoundland. The well will be directionally drilled from an onshore surface location on the northern trip of Shoal Point to a subsurface target beneath Port au Port Bay, approximately 2,200 meters, a few degrees west of due north of the point. By drilling a directional well from onshore, impacts on the marine environment of the Bay are minimized. The well is designed to test a large seismically defined structure which is genetically related to the Hunt et al Port au Port #1 discovery at Garden Hill South. Formations within the Ordovician St. George's Group are being targeted by the well with the primary target being the Aguathuna Formation which is productive at Garden Hill. The well will be terminated in the Watt's Bight Formation which has demonstrated high porosity and permeability elsewhere. Testing of the Aguathuna and Watt's Bight Formations at the Port au Port (number sign)1 well produced a combined total of 7600 barrels per day of fluids including 51 degree API, low sulphur oil and sweet natural gas. Drilling, using the Nabor's #45 drill rig, is estimated to take between 75 and 90 days. The planned total drilled depth of the well is 4040 m (2700 m total vertical depth). The planned average deviation angle of the borehole is approximately 45 degrees. The company intends to make regular news releases on the status of the drilling project as information is received from the operator. RIGZONE NEWS provided by Rigzone.com Source: Canadian Imperial Ven http://www.rigzone.com/news/article....