    Hi I'm from the SH board....but been watching you guys lately
    In the following News release it was stated 2-3 weeks from the 9th of May, that would bring us to May 23rd - May 30th for the drilling thru to the Aquathuna Zone, obviousely that would mean that drilling would have to have comenced beforehand, so without consideration of the lost fish we should have at least kiked out the bottom of the set whole by now. however due to the lost fish and required devation of the Hole around the fish this would take extra time as well as lost time on attempting to retrieve the damn stinky fish.
    So whats an acceptable delay in terms of planning lost time, 5-10 days although some have stated only a few days, what really is acceptable? If 10 days then anytime from the 23rd May to 30th May +10 days.
    June 3rd to June 10th and as noted that would be to drill through to the Aguatuna zone so we must have to start drilling earliar than that for the June 3rd date, although the June10th date sounds good!
    Egad!................... I never thought I'd count so many birthdays going through this play!!!!


    2008-05-12 14:32 ET - News Release

    Mr. Steven Millan reports

    UPDATE

    Canadian Imperial Venture Corp. has provided the following update.

    Currently, the 2K-39 well is at 2,865 metres and the hole is being conditioned prior to running intermediate casing. Following the casing run, the hole will be drilled ahead to penetrate the primary target horizons, the Aguathuna and Watt's Bight formations.

    The operator, Shoal Point Energy Ltd., estimates in a May 9 news release that it will be two to three weeks before drilling of the Aguathuna commences.

    1. Just another news article to count the days from or till news.....

      Canadian Imperial Begins Drilling on Shoal Point, Newfoundland

      Wednesday, March 05, 2008

      Canadian Imperial Venture Corp. has been informed by the operator, Shoal Point

      Energy Ltd., that drilling commenced today on the Shoal Point et al 2K-39 well in

      western Newfoundland.

      The well will be directionally drilled from an onshore surface location on the

      northern trip of Shoal Point to a subsurface target beneath Port au Port Bay,

      approximately 2,200 meters, a few degrees west of due north of the point. By drilling

      a directional well from onshore, impacts on the marine environment of the Bay are

      minimized.

      The well is designed to test a large seismically defined structure which is genetically

      related to the Hunt et al Port au Port #1 discovery at Garden Hill South. Formations

      within the Ordovician St. George's Group are being targeted by the well with the

      primary target being the Aguathuna Formation which is productive at Garden Hill.

      The well will be terminated in the Watt's Bight Formation which has demonstrated

      high porosity and permeability elsewhere. Testing of the Aguathuna and Watt's Bight

      Formations at the Port au Port (number sign)1 well produced a combined total of

      7600 barrels per day of fluids including 51 degree API, low sulphur oil and sweet

      natural gas.

      Drilling, using the Nabor's #45 drill rig, is estimated to take between 75 and 90

      days. The planned total drilled depth of the well is 4040 m (2700 m total vertical

      depth). The planned average deviation angle of the borehole is approximately 45

      degrees. The company intends to make regular news releases on the status of the

      drilling project as information is received from the operator.

      RIGZONE NEWS

      provided by Rigzone.com

      Source: Canadian Imperial Ven

      http://www.rigzone.com/news/article....