TORONTO, ONTARIO--(Marketwire - Jan. 17, 2013) -Castillian Resources Corp. (TSX VENTURE:CT)(OTCQX:CTIIF) ("Castillian" or the "Company") has completed 5,951 meters of reconnaissance diamond drilling in 21 holes at its Hope Brook Gold Project in southwestern Newfoundland. All of the holes, except two that were lost, intersected the mineralized silicified zones as targeted from geological and geophysical data.

The drilling intersected multiple zones of gold mineralization in a major new near surface target zone in the Mine Zone - 240 Connector Target ("Connector Zone"; see Figures 1 and 2), located approximately 900 metres (m) southwest of the former Hope Brook open pit. Table 1 lists significant results for all holes completed in the program (see press release dated December 11, 2012 for discussion of results of first four holes).

Highlights from new drilling include:

  • Major new near surface target zone within the Connector Zone and above the 240 Zone which extends along strike for approximately 800m to a depth of more than 300m;



  • Hole HB12-100:1.51 grams gold per tonne (g Au/t) over 14.0m, including 2.03 g Au/t over 8.0m and 1.07 g Au/t over 18.1m core length, including 1.68 g Au/t over 5.5m core length within a 57 m wide silicified zone in the Connector Target; and



  • Hole HB12-101: 1.04 g Au/t over 8.5m core length, 1.44 g Au/t over 2.9m core length and 1.35 g Au/t over 5.6m core length within an overall 75m wide silicified zone 100m northeast of hole HB12-100.

Dr. Bill Pearson, P.Geo., President and CEO of Castillian, commented: "This drill program was successful in outlining a major new near surface zone in the Connector Zone that has the potential to add significantly to our already strong mineral resource base. Our exploration team, support staff and drill contractor did a tremendous job completing the planned program in less than two months and on budget." Pearson continued: "We are currently completing interpretation of all of the new drilling data and planning the next drill program. The next program will focus on testing the new target zone and expanding existing resources, especially those that are potentially open pittable. In addition, our technical work has identified a number of areas near the current resource where there is potential to increase the overall grade of the resource."

Mr. David Copeland, P.Geo., Chief Geologist added: "Drilling within the Connector Zone demonstrates continuity of the alteration and mineralizing systems along a shallow southwest plunge between the Hope Brook Deposit and the 240 Zone. The thickness of the silicified zones and encapsulating argillic alteration zone is similar to that seen in the former Hope Brook Mine and 240 Zone." Mr. Copeland continued: "A newly recognized fold system affects the rocks of the 240 and Connector Zone areas, the identification of which has been driven by drilling outside of the main Hope Brook Mine area. This fold system explains why the main silicified horizon southwest of the Hope Brook Mine does not come to surface and why shallow historical drilling within the area failed to intersect both of the zones. This interpretation is corroborated by geophysical data. Further structural modelling and geological work in progress is designed to provide a better understanding of where to target gold mineralization within this extensive fold system."

The following provides a more specific description of the drilling completed in each of the target zones tested.

240 Zone - Mine Zone Connector Target

The Connector Zone was tested with a total of nine drill holes (3,279m; HB12-92 and 93 and HB12-100 to 106). Each of the holes that reached the intended target depth (seven of nine) within the Connector Zone intersected broad zones of silicified altered rocks with variable levels of gold mineralization.

Hole HB12-100 encountered several intermittent zones of pyrite and chalcopyrite bearing grey siliceous alteration from 234.2 to 248.0 m, 288.0 to 319.1 m; and 349.9 to 407.2 m. The silicified zones assayed 1.07 g Au/t over 18.1m (core length), including 1.68 g Au/t over 5.5m (core length); and 1.52 g Au/t over 14.0m (core length), including 2.03 g Au/t over 8.0m (core length).

Hole HB12-101 intersected buff-grey, pyrite and chalcopyrite - bearing silicification with intercalated mafic dykes from 329 to 403.8m (core length) with an 8.5m interval (core length) assaying 1.04 g Au/t. This interval bears many similarities to that described from historic drilling from the nearby 240 Zone and is being considered the eastern extension of the zone.

Hole HB12-106 intersected multiple zones of buff to grey, pyrite bearing siliceous alteration zones from 243.9 to 262.1m, 282.9 to 299.4m, and 331.7 to 334.1m. The siliceous zones were host to multiple minor quartz-tourmaline veins with trace chalcopyrite. Significant assays include 1.82 g Au/t over 1.5m.

Hole HB12-102 intersected a zone of light grey-buff, pyrite-bearing silicification from 262.2 to 281.9m and a zone of buff-grey, pyrite/chalcopyrite-bearing silicification from 151.4 to 183.7m.

Holes HB12-104 and HB12-105 ended short of the Connector Zone mineralization at depths of 162m and 113m respectively due to poor ground and mechanical issues.

Chetwynd and Chetwynd South Prospects

The potential downdip extensions of the Chetwynd and Chetwynd South Prospects were tested by six reconnaissance drillholes (HB12-095 to 099 and HB12-103). Each of the drillholes intersected the targeted silicified alteration rocks with anomalous gold mineralization.

Three drill holes (840m; HB12-095, 096, and 097) tested the Chetwynd South Prospect down dip mineralization encountered in historic holes CW-101, 102, 103, 039, and 098. Each of the drill holes intersected buff to grey, siliceous, pyrite and/or chalcopyrite-bearing mineralization. Quartz and tourmaline veining is prevalent and carries much of the gold mineralization. Anomalous gold values were encountered within the silicified zones and include 1.12 g Au/t over 1.5m core length in hole HB12-095 and 0.68 g Au/t over 1.5m in hole HB12-097.

Two drill holes (602m; HB12-098 and HB12-099) tested for potential gold mineralization down-dip of historic drilling and surface exposure at the Chetwynd Prospect. Although each of the drill holes intersected several zones of intermittent buff and grey siliceous, pyrite-bearing, fragmental rocks, no significant gold values were obtained from the Chetwynd Prospect drilling.

Chetwynd to 240 Connector Target

One hole (353 metres; HB12-103) intersected several grey - buff, siliceous units from 177 - 181.5m, 192.3 - 195.5m, 198 - 202.1m and 229.5 - 230m. The relationship of these silicified zones with the Chetwynd Prospect and the 240-Zone mineralization is currently not clear and requires further investigation. No significant gold values were returned from this hole.

NW Target Area

Five reconnaissance drill holes (714 m; HB12-107 to 111) tested the NW Target area with broad-spacing (75 to 125 m). Each of the drill holes intersected the targeted silicified alteration zones that locally contained disseminated chalcopyrite, pyrite and minor bornite. The best result was 1.16% Cu and 0.28 g Au/t over 1.3m in hole HB-12-109 and 0.68 g Au/t over 1.8m in hole HB 12-108.

Table 1: Significant Diamond Drilling Results, Fall 2012 Program, Hope Brook Gold Project.

Hole No. From To Core True Au Cu (%)
(m) (m) Length (m) Width (m) (ppm)
4960 Stope
HB12-091* 133.00 138.70 5.70 2.59 1.10 0.00
and 206.30 235.90 29.60 13.44 2.14 0.45
incl. 217.60 232.20 14.60 6.63 2.69 0.58
incl. 227.90 232.20 4.30 1.95 5.24 1.47
and 253.40 260.40 7.00 3.18 0.98 0.01
HB12-094* 106.30 111.00 4.70 1.99 1.11 0.00
and 156.30 169.00 12.70 5.37 0.34 0.00
and 180.90 220.00 39.10 16.52 1.90 0.12
incl. 185.00 197.50 12.50 5.28 3.95 0.07
Mine Zone - 240 Connector Zone
HB12-092* 314.40 330.90 16.50 12.60 0.64 0.02
incl. 319.60 322.00 2.40 1.80 1.66 0.04
HB12-093* 366.60 382.00 15.40 10.10 0.46 0.04
incl. 370.40 381.00 10.60 6.95 0.52 0.04
HB12-100 349.9 368.0 18.1 7.4 1.07 0.05
incl. 349.9 355.4 5.5 2.2 1.68 0.11
and 412.5 426.5 14.0 5.7 1.52 0.04
incl. 418.5 426.5 8.0 3.3 2.03 0.07
HB12-101 329.1 338.0 8.9 2.8 1.04 0.02
incl. 329.1 333.0 3.9 1.2 1.85 0.02
and 344.0 347.0 3.0 0.9 0.63 0.08
and 355.0 356.0 1.0 0.3 0.83 0.46
and 365.4 368.3 2.9 0.9 1.44 0.15
and 371.2 372.1 0.9 0.3 0.59 0.02
and 374.5 376.0 1.5 0.5 0.67 tr
and 398.2 403.8 5.6 1.7 1.35 0.03
and 432.7 433.3 0.6 0.2 1.53 tr
and 527.5 529.0 1.5 0.5 0.61 0.03
HB12-102 225.4 226.7 1.3 0.9 0.54 tr
and 271.0 277.0 6.0 4.3 0.60 0.04
and 282.1 292.6 10.5 7.6 0.63 0.02
HB12-106 174.6 176.0 1.4 0.4 0.60 tr
and 384.0 385.5 1.5 0.3 0.65 0.02
and 410.0 411.0 1.0 0.4 0.26 0.15
and 412.2 413.5 1.3 0.4 0.60 0.04
and 441.5 443.0 1.5 0.4 1.82 0.38
and 452.5 454.0 1.5 0.4 0.36 0.23
Chetwynd - 240 Connector Zone
HB12-103 201.0 203.0 2.0 1.7 0.15 0.13
Chetwynd Prospect
HB12-098 225.0 230.2 5.2 4.4 tr 0.10
HB12-099 no significant values
Chetwynd South
HB12-095 223.5 224.3 0.8 0.7 0.74 0.11
and 229.6 231.1 1.5 1.4 1.12 0.14
HB12-096 no significant values
HB12-097 188.5 190.00 1.5 1.2 0.68 tr
NW Target Zone
HB12-107 63.5 64.5 1.0 0.5 0.04 0.12
HB12-108 29.0 30.8 1.8 0.8 0.68 0.25
and 60.3 60.9 0.6 0.3 0.80 0.87
HB12-109 42.4 43.2 0.8 0.7 0.04 0.11
and 46.0 47.3 1.3 1.2 0.28 1.16
HB12-110 150.0 151.0 1.0 0.4 0.04 0.24
HB12-111 53.0 54.0 1.0 0.9 0.18 0.84
*Holes previously released see press release dated December 11, 2012
tr = trace
Table 2: Collar Coordinates and Orientations of Drill Holes, Fall 2012 Program, Hope Brook.
Hole No. Target UTM Mine Grid Elev. Length Az Dip
Easting Northing Easting Northing (i) (m) (ii) (ii)
HB12-091 4960 Stope 417919 5287887 11529 5198 5135 279 145 -51
HB12-092 Connector Zone 417756 5287323 11072 4829 5135 367 325 -63
HB12-093 Connector Zone 417756 5287323 11072 4829 5135 446 325 -74
HB12-094 4960 Stope 417940 5287903 11555 5199 5132 223 145 -51
HB12-095 Chetwynd South 415631 5285792 8453 4794 5055 237 325 -47
HB12-096 Chetwynd South 415683 5285816 8509 4783 5054 320 325 -57
HB12-097 Chetwynd South 415752 5285860 8591 4780 5058 283 325 -57
HB12-098 Chetwynd 416592 5286508 9651 4829 5045 333 325 -53
HB12-099 Chetwynd 416521 5286429 9547 4805 5046 269 325 -51
HB12-100 Connector Zone 417229 5287260 10604 5079 5069 459 145 -51
HB12-101 Connector Zone 417180 5287155 10504 5021 5066 536 145 -52
HB12-102 Connector Zone 417630 5287228 10914 4823 5123 336 325 -65
HB12-103 Connector Zone 416879 5286625 9953 4760 5023 353 325 -59
HB12-104* Connector Zone 417407 5287498 10887 5173 5075 162 145 -49
HB12-105* Connector Zone 417311 5287314 10702 5077 5073 119 145 -49
HB12-106 Connector Zone 417332 5287315 10719 5066 5073 501 147 -55
HB12-107 NW Target 417675 5287755 11253 5230 5087 73 145 -43
HB12-108 NW Target 417727 5287796 11319 5233 5090 88 145 -43
HB12-109 NW Target 417947 5287911 11566 5201 5131 120 325 -45
HB12-110 NW Target 417736 5287854 11360 5276 5104 237 145 -49
HB12-111 NW Target 417844 5287814 11426 5181 5131 196 325 -45
Called Off 14
Total 5,951
*Results for Holes HB12-104 and -105 were not reported as they were lost due to mechanical issues.