Centamin Egypt Ltd

Gold Project: 9.39 Moz Measured and Indicated, Plus 3.5 Moz Inferred

Free
Message: Centamin PLC: Q4 2016 Preliminary Production Results,

 

 2017 Production Guidance and Dividend Policy Update
2017-01-09 02:00:00 AM ET (Marketwired)
   
   

PERTH, AUSTRALIA--(Marketwired - Jan 9, 2017) - Centamin PLC (LSE: CEY) (TSX: CEE)

LSE:CEY, TSX:CEE

For immediate release 9th January 2017

Centamin plc ("Centamin" or "the Company") (LSE:CEY, TSX:CEE)

Q4 2016 Preliminary Production Results, 2017 Production Guidance and Dividend Policy Update

Centamin announces preliminary production results for the quarter ended 31 December 2016 from its Sukari Gold Mine ("Sukari") in Egypt.

Preliminary total gold production for the quarter was 136,787 ounces, an 8% decrease on the previous quarter and a 16% increase on Q4 2015. This brings full year production to 551,036 ounces, a 25% increase on 2015 and above the guidance range of between 520,000 and 540,000 ounces. 

Quarterly throughput at the process plant was 2,948kt, a 5% increase on the previous quarter.

Open pit total material movement (ore plus waste) decreased 2% on the previous quarter to 15,811kt. Open pit ore production decreased by 25% to 2,183kt at an average mined grade of 0.84g/t. The average head grade to the plant from the open pit was 0.85g/t. The run of mine ore stockpile balance decreased by 592kt to 577kt at the end of the period.

The underground operation delivered 228kt of ore, 10% less than the previous quarter, at an average mined grade of 10.43g/t. Ore from stoping was 125kt at 10.01g/t and ore from development was 103kt at 10.94g/t.

                                       Q4 2016 (preliminary)   Q3 2016   Q4 2015
Open Pit - Total Material Movement (kt)   15,811                              16,191    13,754
Open Pit - Ore Production (kt)            2,183                               2,936     2,229
Underground Ore Production (kt)           228                                 255       300
Process Plant Throughput (kt)             2,948                               2,806     2,758
Process Plant Productivity (tph)          1,415                               1,437     1,345
Gold Produced (oz)                        136,787                             148,674   117,644

For more information, please contact:

Centamin plc                                          Buchanan
Josef El-Raghy, Chairman                              Bobby Morse
Andrew Pardey, CEO                                    + 44 (0) 20 7466 5000
Andy Davidson, Head of Investor Relations
([email protected])  +44 (0) 1534 828708

Click on, or paste the following link into your web browser, to view the associated PDF document. http://www.rns-pdf.londonstockexchange.com/rns/6070T_1-2017-1-9.pdf

This information is provided by RNS The company news service from the London Stock Exchange

END

Contacts: RNS Customer Services 0044-207797-4400 [email protected] http://www.rns.com

Share
New Message
Please login to post a reply