Gentlemen,
In reference to comments about Gusella giving changing dates of unit 2 permit approval, accorrding to the news release the installation of equipment or production date of late 09 has not been effected. Prefab of equipment has proceeded. Building access roads and site prep will not take that long and can proceed concurrently in part of the site as received equipment is installed in others. If the startup schedule is not impacted, what is the difference whether they got it in June or October.
About the access cost of Luke being charged against production to date is a little rank and/setting some arbitary number of all future production in order to charge against mmft being produced lands in the same bucket.
What the market is going to have to deal with, sometime, is an ever increasing rate of production and cash in the door.
Pickens and others are talking about large volumes of NG being used for never before consumption. Pickens idea that NG power plants using less NG is dreaming. Coal fired power plants, new construction, are being switched to NG because of the 30% higher cost of capturing CO2 and storing somehere. The amout that is and can be used for pressurizing old oil fields is very limited.
NG is going up.
dbleagle1