Skip to content
Sign in

Post

Connacher Oil and Gas

Prez3.7 rating from 34 members3.7K ptsRate

On The Positive Side

On the positive side in Connacher's favour, wells P11 and P12 on page 15 of the presentation are currently in the steaming process and hopefully will add substantially to Connacher's bitumen production in July 2009.

Also, the 4 ESP's that were installed in April will help to reduce overall production costs for the rest of 2009. (page 15 presentation) The chart on page 13 for POD 1 production is also not very accurate as the production at each well pair changes hourly/daily and the chart is a static representation ( a vague approximation).

In addition, Connacher reached agreement in 2008 for the sale of its 250 million barrel asphalt production from MRC for delivery in 2009 at greater than $100 US/bbl which will add to cash flow. (page 33 presentation)

Finally, Connacher has scheduled the turnaround at the MRC for the fall however, if the profit being contributed from the MRC refinery to Connacher's overall cash flow is significant in the fall, I wonder if Connacher can delay the turnaround until the winter of 2009/2010. Why not shut down the refinery for a turnaround at the time of year when it is making the least amount of profit (or is the fall the latest date at which the turnaround can take place?)



Best Wishes; Scott



Join the conversation about Connacher Oil and Gas.

Reply

Replies

  1. "Connacher reached agreement in 2008 for the sale of its 250 million barrel asphalt"

    Did you mean 250 thousand barrels?

    Any ideas what is the netback from this sale? Will it be more then the cost of scheduled turnaround at the MRC ?

    1. You are corret Jurek it states 250,000 barrels on page 33 of the presentation. I am in error. Sorry everyone.

      So Connacher should receive over $25 million dollars for Asphalt sales and the cost of the turnaround at the MRC is $17 million dollars (page 9 presentation). I don't know how much the cost of the raw feedstock is to produce the asphalt.

      While we are at it Jurek you made an error on your post on the burn rate when you stated "They hope that $18 millions ESP pumps will help." Page 9 of the presentation state that $18 million was spent on POD one for 4 ESP's and drilling the 2 well pairs (11P and 12P).


      Best Wishes; Scott


      1. We have to take into consideration that the value of the assets has increased .GD had a small value untill the sight was built up ,the money spent so far on Algar is all value added ,and MRC now must be worth considerable more than CLL paid for it,even at these low prices .If MRC is completely paid for then it alone must be worth close to the 800 million ,Conacher owes

        digger



  2. Too bad they cant get a little fire under PDP like GTE seems to have in their Columbian territories.Waiting for PDP is like watching grass grow .

    digger