To The Inveterate Cheerleaders And Others Who Wish To Avoid Inconvenient Truths:

If we go back approximately a year ago, to the time of the market crash and observe the behavior of Connacher actions, there is something to be learned. In pointing this out, I am being neither positive or negative. Simply, I am observing reaction realities in the behavior of Connacher at that time and since then and then projecting actions taken to potential conclusions and outcomes. In my working life, my area of expertise was Strategic Market Planning of Custom Engineered metallurgical materials. As a Marketing Manager, I interacted on a daily basis with all functions relative to product management and then moving programs and product from development into production and through to the market. Thus, though not an engineer, I dealt with engineering and manufacturing functions on a daily basis. This is said only so that you can better understand my background.

At the time of the market crash last year management of Connacher idled production at Great Divide due to a then current operational loss position. Construction at Algar was also put on hold. This decision increased operational losses due to plant and equipment and labor expenditures which were now non recoverable as there for a protracted period could be no prouctive revenue to offset the costs. This reaction was taken and implemented very quickly. Since that time, we have had a persistent reduction in productive output. Such of course means we have had minimized output and profitability now for an entire year. Even though oil prices have increased with a better than doubling since the bottom. Obviously, any such situation results in decreased revenue, profit and cash flow. My concern with this historical situation is not only that it occured but what it reveals about management. And these actions reveal that Connacher was operating from an undercapitalized position which reveals a defect in contingency planning. Put simply, there was not enough money in the bank to continue field operation. As a result, field productive output was threatened. A threat which we now recognize became a reality.

This to me indicates a major shortcoming in the area of Corporate contingency planning. A shortcoming which in fact likely put the totality of Connacher as an ongoing entity in jeoporady.

Going downstream, have any lessons been learned? Or will we see such additional risky behavior again? Because survival of two near death experiences is unlikely. So, how confident are you that we will not experience a similar incident as we saw last year? What are you aware of that has changed which would preclude such a scenario?

Brian

Join the conversation about Connacher Oil and Gas.

Reply

Replies

  1. I'ld like to weigh in with a positive spin on the prospects for CLL. First some observations on Share Price.

    I generally look to operating cash flow per share multiplied by a cashflow multiplier as a general guide for share price. For CLL I look to other companies in the oil sands area for comparison. Suncor can be used as an example. If we choose a time frame prior to the market meltdown say Q2 of 2008 what do the numbers look like. All these numbers are available from the Investor section of the company websites.

    Suncor 2008 Q2 operating cashflow / unit was 1.34. To annualize this multiply by 4 to get $5.34. What was Suncor's share price at that time? It went from a high of 73 (April) to around 60 (in July) just before the crash. This works out to a muliplier range of 11 to 14.

    What about CLL? Well in 2008 Q2 its cashflow per share was approx 10 cents - or 40 cents on an annual basis. Its share price varied from a high of 5.25 (April) to approx 4 (in July) just before the crash. This works out to a multiplier range of 10 to 13.

    What about PBG which is often trotted out on this web site for comparison. Its cashflow per share in 2008Q2 was 1.82 or 7.28 annualized. Its share price was a high of 63 (January) to around 40 in July. This gives a multiplier range of 5 to 9.

    I think 100% oil sands companies will be afforded a higher cash flow multiple because of the minimal exploration risk and the long-term annuity characteristics of their resource base. Their resource base isn't subject to the rapid depletion of conventional oil. So in my mind a 10x multiple is appropriate for CLL.

    For the CLL SP get to $10, it has to generate $420 million cashflow on annual basis - due to the 420 MM diluted shares outstanding. How is that possible? Let's take yesterday's numbers. WITC was USD 81, CAD exchange rate was .96 giving a CAD 84 / barrel. Dilbit was selling for 84% of that or CAD 71 / barrel. Deducting the cost of diluent and transportation gives approx CAD 60 / barrel of bitumen. Less royalties (negligible at this point) and op costs of $15 gives a netback of $45 / barrel. Multiply that by 9,500 bpd * 365 days gives approx 150 MM per annum. 2 pods would be 300 MM / year. WITC @ USD 95 (not an unreasonable assumption) and a CAD at parity results in 400 MM / annum. I am ignoring interest and the other operations of CLL. But the point I want to make is that the oil sands can be a money machine - if the planets are in alignment.

    The only significant risk I see is operational. CLL has got to get POD1 over 9,000 bpd with an op cost at or below $15/barrel. Last quarter their op cost was below $15 but production was only 6,300 bpd. I understand it was over 8,000 bpd before the September maintenance outage and they seem to be struggling to get production back up.

    I am a long way from giving up on CLL. If they can get POD1 operations back on track for a few consecutive quarters then the market will reward them with an increased SP. I Personally am looking for a SP in the $5 range next summer. A successful ramp up of Algar towards the end of 2010 and a $90 oil price should see the SP push well north of $5.

    I know this is long winded but I want to make one more observation. I think being long bitumen is where to be the next few years. I don't for a minute think CLL will ever expand the Montana refinery. And it wouldn't surprise me if they don't aggressively expand NG production at these low NG prices. There is a new pipeline to bring Alberta heavy oil to US refineries to replace Venezuelan and Mexico heavy oil. This should keep the heavy-light differential narrow. (The only fly in the ointment is possible US laws to penalize the refining of heavy oil).

    1. Cornergas

      nice post your numbers are not that far off,with the kind of scenario I forsee ie 50,000/bbl with Oil banging on the door of $200/bbl,below the comparrison I saw was two companys producing 50,000bbl or equivelent,yes one had twice as many shares Connacher but Harvest has twice the debt,before the offer $10 Harvest avg about $7.50 over last 30 days while CLL avg $1,on the negative side present facts speak for themselves,one of the reasons I sold Harvest($12.10) was a reduction in production 50% and a further cut in distribution,as before just puting food for thought out there,investing is all about the end result in Connachers case that's in the longterm,so far its a good one IMVHO.

      1. For those who havn't already seem this.

        Connacher Oil and Gas Limited provides Algar update

        CALGARY, Oct. 23, 2009 (Canada NewsWire via COMTEX News Network) --

        Connacher Oil and Gas Limited (CLL - TSX) announces today that on October 16, 2009 a major milestone was achieved at the Algar construction site with the engineered lift of the two evaporator towers ("towers"), which constitute part of Connacher's second 10,000 bbl/d steam-assisted gravity drainage ("SAGD") plant at its Great Divide oil sands development project in northeastern Alberta.

        As shown on our website at www.connacheroil.com under the caption "Algar Slideshow" and also as available at http://files.newswire.ca/574/Algar_Evaporators.pdf, the first tower, which weighed over 476,000 pounds and stands approximately 150 feet tall, approximately 40 feet taller than the evaporator towers at Pod One, was installed initially, followed by the second, smaller tower. These lifts required a sound plan, excellent teamwork, communication and cooperation among a wide range of disciplines, as well as favorable weather conditions with limited wind. The towers were transported to the site by truck, including over Connacher's newly-constructed road from Highway 63 to the plant site. This road was carved out of muskeg in a remote area and the towers were installed on reinforced concrete bases, situated on piles driven into the muskeg. The towers were each stood up in approximately four hours and are expected to be in place for approximately 25 years.

        Construction at the Algar project is proceeding on time and under budget at this time, with a target to complete the plant and tie in the associated seventeen SAGD horizontal well pairs in early April 2010. Thereafter, it will take approximately one month to commission the plant and steaming of the well pairs should start in May 2010 and last approximately three months before first production in approximately August 2010.

        Thereafter, rampup towards full plant capacity is anticipated to occur between startup and year end 2010 or early 2011. Completion of Algar will double Connacher's capacity at Great Divide to 20,000 bbl/d of bitumen.

        Connacher is very pleased with the progress at Algar, as highlighted by this installation of the evaporator towers in a most timely and efficient manner. Barring any unforeseen problems or unduly adverse weather conditions, the company remains optimistic about the timely, cost effective completion of the Algar project and then its eventual impact on the company's production levels from the region.

        Separately, with the recent closing of the $30 million flow through equity financing, after freeze-up Connacher will immediately be embarking on a multi-well core hole drilling program, primarily on the northwest portion of its main lease block at Great Divide and to a lesser extent on its 50 percent-owned Halfway Creek acreage. Additionally, 3-D seismic will be shot on Connacher acreage in the region.

        1. The press release looks good, but one comment on it does not seem right, If you look at the suggested timeline

          April 2010 Complete

          May-Aug 2010 steam well pairs

          Dec 2010 early Q1 2011 full production.

          It is the last part that does not seem right, they have not gotten Pod1 up to full produciton yet, how do they anticipate getting P2 up to full production in that short of a time frame. Can someone with industry knowledge answer (like 2 crude or ??).

          Thanks

          Rex

          1. t is the last part that does not seem right, they have not gotten Pod1 up to full produciton yet, how do they anticipate getting P2 up to full production in that short of a time frame. Can someone with industry knowledge answer (like 2 crude or ??).

            One would hope that they will learn from their mistakes. I don't mean that in a derogatory manner, just that problems are to be expected and the industry is young. I believe that the last time, they predicted three months from initial production to full production. They are probably being conservative in their estimates this time by giving it say four to six months. Also, remember how there were rumours with the GD startup when people were saying that "black stuff was coming out of the wells" and being trucked, yet it took a couple weeks (or more?) before there was any official confirmation that bitumen was being produced in quantity.

            1. Replying to @MarlboroDog

              It is not my intent to be unnecessarily negative however, there are elements which could put a damper on Algar and the entirety of Connacher. Some of which are controllable and others which involve macro economic issues well beyond the control and even influence of Connacher. Some of the issues involve:

              1. Miscalculations on the part of Connacher. These could involve errors in the placement or depth of producing well pars for instance. Others, including some large sophisticated companies have had problems with this. There are certain to be many additional execution risks which I and possibly others, are not even aware.

              2. Macro economic issues such as a collapse in demand predicated on a double dip economic event impacting the entire world wealth and income structure. Though at the moment, inflation seems to be winning, the ultimate resoution of the macro economic picture is far from yet settled. A depressionary deflation potential is still a realistic scenario. Under such a scenario, Connacher due to its debt significantly affecting cash flow in a depressionary event, would likely be catastrophic to a company in Connachers position. Such a scenario in fact gains credence as Oil continues to move higher thus placing ever greater pressure on the overall economies of the world. Remember, high oil prices were the trigger event for the event of 13 months ago. We still have very high unemployment in the western heavily oil consuming oil nations of North America and Europe. And Connacher has no influence over the potential macro economic events.

              Though I am not suggesting the future is completely gloomy, there are still macro events as well as Connacher potentialities which increase the risk level for a small producer in the still relative high cost structure of the Oil Sands. There in my mind, is no question that the "sands" will be ultimately successful The only question? Will it be on the second go round or a subsequent one?

              Brian

          2. They designed GD and Algar to meet the production that they hope to make. They have never achieved an average of 6500 bbl/d over a quarter yet with GD, yet they still pound the drum that NEXT QUARTER we will be at or near design capacity, (of course we have now seen that tomorrow never comes).

            They can say what they want about being at full production at Algar, it will probably produce about 5000 bbl/d within a few months after steaming and then they will baby it along upwards to about 8500 mid 2011. Like I said they can say what they want but prove will be in the pudding, or should I say production.

            1. Replying to @spiderman8

              Since the whole area is under steam pressure heated up and they are not getting the bitumen dripping down the the way it is designed or planned for ,then why not drill some more holes and spread out a little further .This is what they will do to increase prod. to the 25000,barrels anyway

              willy

    2. Cornergas

      I like to think positive, and I'm not agreeing or disagreeing with your numbers, but I believe multipliers will take some time to recover, and they recover with increasing confidence. That confidence has to be restored in the market, which may take a few years. Confidence also has to be built into companies and management teams and CLL has to rebuild this. They gained confidence in investors on how quickly POD 1 was brought on, but have done very little if anything to keep that confidence. People do have short memories and will quickly forget past bumblings but only with consistent high production numbers. Until then a multiplier of 10 is a little high.

      1. I agree with your assessment re investors confidence in CLL needing to be earned back.

        Re the calculations in my last email I was missing the CLL "quality discount" from the Hardisty dilbit price. In 2009 Q2 the published figures were: USD WTIC 60, CAD exchange rate was .86 giving a CAD WTIC 70. Hardisty dilbit averaged CAD 57 (or 81.2 % of CAD WTIC), CLL dilbit was CAD 52.35 (or 74.6 % of CAD WTIC). Thus CLL dilbit suffers a "quality discount" of approx $5 / barrel. This is disclosed in note (3) on slide 38 of their current investor presentation. After the cost of diluent and transportation the bitumen netback was CAD 41. The royalty & operating costs were $15, resulting in operating cash flow of $26/barrel of bitumen. All this info is in their 2009Q2 report.

        The corresponding figures for 2009Q3 are: USD WTIC of 68.50, CAD exchange rate of .91 giving a CAD WTIC of 75. Hardisty dilbit averaged $60 (implying a 20% discount from WTIC). Assuming a $5 quality discount for CLL dilbit, they should have received approx $55 / barrel of dilbit. Assuming similar diluent, transportation, royalties & operating costs as Q2, their operating cash flow should be approx $30 / barrel of bitumen.

        On Wed of this week the corresponding figures were: USD WTIC 81.37, CAD exchange of .96 giving a CAD WTIC of 84.85. The Hardisty dilbit price that day was CAD 71.36. Assuming a $5 quality discount, CLL should be receiving approx CAD 66 / barrel of dilbit. After deducting the cost of diluent, transportation, royalties & operating costs they should have operating cash flow of approx $40/barrel of bitumen. That times 9,500 bpd * 365 days / yr = approx 140 MM. The cashflow from other operations should be sufficient to cover all other finance & admin costs. (I realize that only about half or 10MM quarterly of their interest costs are expensed until Algar goes commercial). 140MM/420MM shares = 33 cents/share and with a 10x multiple should translate to a SP of approx $3.

        Dreaming further, with USD WTIC @ 95, a CAD at parity, and similar heavy - light differentials, CLL operating cashflow would be approx $48 / barrel of bitumen or 166 MM/ annum which translates to a $4.00 SP. This is why I don't see it as unreasonable for CLL SP to approach or even surpass $5 with only 1 POD in production.

        One last point is that I am ignoring the various hedges they have in place as I view them as temporary and they only obscure the underlying real potential of their operations.

    3. I value Conancher with following method

      take ENcana ratio for enterprise value (debt + market cap ) / cash flow averaged over 3 years

      take a discount of 20% on this ratio to account for Connacher small size and higher risk

      and compute with connacher debt and future cashflows algar included

      This is my estimate of COnnacher value

      Much below yours

      With this you will find that you need algar cashflow to even justify the current share price. It is by the way normal that algar is taken into account in share price ...

      Your current estimation is strange and I am surprised so many members approve it.

      Hubisan

      1. In considering the cost of producing the NG. We have to realize all the costs of drilling the wells and setting up the collecting system have been written off against the the bankable cash that we all cry about the disapearing cash.Now when we talk about the cost of producing NG some people here add in all those costs again ,and deduct it off the cash flow from the NG.but in my way of thinking that is double costing ,as we have already paid for those costs,I know it is just taking money out of one pocket and putting it in the other

        willy

    4. Thank you for a very well thought out lucid review of CLL. I am long term and do respect but the bears and bulls on here as long as they have some facts (or at least lay out the logic) to back up thier claims. Stock picking is not an exact science, if it were we would all be rich, but rather it is an art where you take the available information and make an educated guess what the future holds.

      Rex

  2. So Brian,

    if you were in charge and oil was predicted to go as low as 20, what would have you done? Hidsight is perfect, why deplete your resources for 10/bbl and then paying the operational cost? I think management acted responsilby.

    My beef is that they did not plan for a possible oil price crash. One way to do that was to raise more money when sp was high, imagine if they sold same half of shares at 5, same money less dilution and less debt

    So tell me what would you have done faced with the same circum?

    Believe

    1. Believe:

      First, in a situation like Conacher faced a year ago, there are no easy decisions. So, I cut management a little slack on that score considering their state of being under capitalized. But, the state of being under capitalized is a state from which there is no reprieve during a crisis. And this is where the critical error was made in my opinion. Yes, I know. It is easy to draw that conclusion from our position of hindsight today. Not so easy from the perspective of 2 to 3 years ago when they were doing their capital budgeting. But none the less, this is what CEO's get paid for. The price of failure to appropriately do this? A death or near death experience. That was the only sense that CLL investors got lucky in. It was only "near death" But still a major set back for Connacher. We all can only hope that in the capital budget for both GD and Algar. lessons have been learned and put to good use!

      Brian

      1. By the way, by creating an appropriate margin of "crisis management error", one if the excess either in whole or part is not required, one can as long as contractual terms have been negotiated to permit, return the unused portion of the loan paying only the interest on the excess for the time funds are actually borrowed and at the rate of interest negotiated. Brian