Skip to content
Sign in

Post

Connacher Oil and Gas

The post this replies to is no longer available.

Prez3.5 rating from 47 members4.8K ptsRate

Re: Production

Willy:

As I recall, they peaked pre-crash and burn, at about 9,300BBL/Day. Ever since the crash and the ensuing loss of productivity struggle, they have been 30 to 40% below such production. Gets real expensive with significant added cost and reduced revenue!

Brian

Join the conversation about Connacher Oil and Gas.

Reply