Skip to content
Sign in

Post

Connacher Oil and Gas

Treasurer2.7 rating from 19 members2K ptsRate

Expansion Project

I've been loosely following the discussion about funding required for future growth.

It seems to me Connacher was planning to somehow expand Great Divide using some of the existing infrastructure from Algar and Pod 1. I could easily be wrong, but that was my impression. The "Initial expansion from 20,000 to 44,000 bbl/day" beginning in 2012 is what I'm referring to. Slide 31 of the latest presentation comments "Central processing at Algar."

-bbq

Join the conversation about Connacher Oil and Gas.

Reply

Replies

  1. TIME TO SET THE RECORD STRAIGHT

    Coming out of retirement for 1 post.

    Recently a poster presented a hypothesis regarding CLL not being able to pay future debt requirements with 33k of production without major new dilution or debt. The poster then went on to state that any major attempt to increase production to service the debt would in effect destroy the company. MY RESPONSE TO THIS IS TOTAL RUBBISH. Recent updates have shown that lost revenue due to disappointing production levels are being made up by reduced costs at Algar. Also the oil isn't going anywhere so oil not sold yesterday will be sold tomorrow at a potentially higher price.All anyone has to do is ask themselves a simple question. Would institutions continue to accumulate and more importantly, would the banks have given CLL the new revolving credit had they had any of the concerns the poster has?

    bbq

    YOU'RE CORRECT CLL does in fact have a plan to expand

    Press release Mar 10 2009

    http://www.connacheroil.com/documents/news2009/CLL-2009-03-10.pdf

    Calgary, Alberta – Connacher Oil and Gas Limited ("Connacher" or the "Company", CLL – TSX) announced today that in accordance with a proposed expansion of its Great Divide Pod One and Algar steam assisted gravity drainage ("SAGD") facilities from a combined design capacity of 20,000 bbl/d of bitumen to approximately 44,000 bbl/d of bitumen (the "Great Divide SAGD Expansion Project" or the "Project"), the Company has filed a Proposed Terms of Reference ("Terms of Reference’) for the Project with Alberta Environment. The filing of the Terms of Reference is the first step in the process of submitting an Environmental Impact Assessment ("EIA") for the Great Divide

    YOU KNOW, IT NEVER CEASES TO AMAZE ME, that those invested in CLL know so little about the plans of the company. None of it is hidden, it's all there for anyone willing to do a little research to see.. HAS ANYONE seen or heard anything about production increases by building the intended PODS 3-6 ( which if done now would require increased dilution, debt)? OF COURSE NOT BECAUSE AS ANYONE can clearly see, CLL is intending to reach their intended production levels by expanding the already paid for Great divide and Algar projects. This of course is why Algar's design is slightly different as it's being built for 20k production. Great divide will be modified to increase production to 20K. Now of course this shortens the expected lifespan of the projects but it does allow increased production with minimal cost increases. In fact IMHO CLL can easily make the necessary requirements to reach the intended 44k production level with existing funds and WILL NOT require any future debt or dilution. THEN once the desired production levels are met depending on market conditions and the price of oil decisions be made regarding future PODS.

    IMHO , future PODS will be added with MINIMAL increased debt or dilution as they'll be paid for by revenues from PODS 1 & 2.The potential production levels could eventually reach 124k bbl/d if future POPS are built for 20k bbl/d as opposed to the original 10k design.

    This is a LONG TERM play, do your own research and decide for yourself. Listening to people with SHORT TERM investment plans aren't usually the best sources of information regarding companies building long term projects.

    1. THEN once the desired production levels are met depending on market conditions and the price of oil decisions be made regarding future PODS.

      I would also offer that Connacher will increase production in line with an escallating price for bbl,thanx for comming out of "retirement"nice to read something positive.

      1. TD is showing CLL Q4 2009 and Q1 2010 as

        CLL's next earnings will be reported in 92 days.

        3/15/10 Confirmed Q4 2009 Earnings Release
        5/11/10 Q1 2010 Earnings Release

        confirmed dates.

        1. Sometimes I watch his vids.

          He's not bad.

          He tells something about oil too in the beginning of his vid of 12/14

          To him the US has some deals for Iraq for oil and he thinks Iraq will outpace Iran for oil and Iraq would become an important trading partner for oil for the US so he claims oil could take a pause for rising ?

          What you guys are thinking about that and have you heard something about US contracts in Iraq on tv recently

          http://livewithoscar.com/

  2. BBQ

    I had almost same idea .They would use the GD and Algar plants for further expansion IMO too.Other POD's should probably be linked at the two.Could be wrong also but I understood constructions like GD and Algar were not the plan for the rest..