CALGARY, April 16 /CNW/ - Connacher Oil and Gas Limited (CLL-TSX) announced today the completion of construction of its second steam assisted gravity drainage ("SAGD") oil sands project ("Algar") at Great Divide in Northeastern Alberta. A recent aerial photograph of Algar can be viewed at http://files.newswire.ca/574/algar_2618.jpg.

Algar has a design steam generation capacity of 30,000 bbl/d, which at its long-term target peak operating steam:oil ratio (SOR) of 3.0, is anticipated to facilitate production of 10,000 bbl/d of bitumen over a project life of more than 25 years. The project was designed to allow for expansion to 34,000 bbl/d of bitumen production in subsequent years.

Major civil work at Algar, including construction of the plant site, access road and well pads, was completed in February 2009. Project field construction and fabrication commenced on July 7, 2009. Drilling of the 17 SAGD well pairs at Algar and concurrent construction of the steam generation facility and oil processing plant were completed in 273 working days, less than the 275 working day target set out by the company. Capital expenses are still being accumulated and won't be final until after commissioning of the project. Connacher anticipates the total construction costs of Algar will be under its announced $375 million budget.

A total of 390 standard loads and an additional 175 large loads of material, skids and component parts were trucked to the Algar site during construction. The project incorporated 1,900,000 kg of structural steel and 280,000 inches of welding on 8,800 spools. Overall, the project had an extremely low spool revision rate of approximately one percent. The project also incorporated 36 vessels, 84 heat exchangers, 52 tanks and 190 pumps. Over 700,000 field and shop man hours of employment were created during Algar's construction, primarily in Canada. At peak construction, 400 workers were employed on site.

Connacher also announced today that commissioning of the Algar plant will commence on April 19, 2010. It is anticipated the commissioning process will take up to 30 days and will include tie-in of the three SAGD well pads to the steam generation facility and oil processing plant. Also, the evaporators and all vessels will be tested along with the treating, instrumentation and electrical systems. Commissioning of the steam pipelines and SAGD well pads will follow.

The next step will then be the commencement of sequential injection of steam into Algar's 17 SAGD well pairs. Connacher plans to steam the well pairs for approximately 90 days prior to the initial production of bitumen. The process will be closely monitored to determine the optimum production startup date, based on individual well response. As all wells will not be brought onstream simultaneously, the company anticipates ramping up bitumen production towards design capacity of 10,000 barrels per day by the second half 2011.

Acknowledgments are extended to all of Connacher's management and staff, consultants, advisors and the construction team. We would also like to recognize the service sector and trades which supported and participated in the building of the Algar project. The company anticipates a formal ribbon-cutting ceremony will be held at the Algar plant site on June 22, 2010.

Join the conversation about Connacher Oil and Gas.

Reply

Replies

  1. Congratulations to Connacher's management and the construction teams and the Drifter Projects guys, and conguratulations to all of the long suffering shareholders on this board who made this happen. It was brilliant to see that it was announced today that construction is complete 3 days before the actual completion date. Connacher's management is finally catching on how to use the news to our advantage. It remains to be seen however, if this will have any impact on the share price today, as today is supposed to be a down day on the TSX. Hopefully the completion of the project today and the end of the commissioning period in 30 days will remove a lot of the risk from owing Connacher shares going forward and we will see a steady rise in the share price. The bitumen is in place = no risk. The plant is complete and in 30 days there will be little operational risk left if all goes according to plan. Laura Lau and Jaime Carrasco, analysts on BNN have given Connacher their recommendations to buy this week so..............

    Best Wishes; Scott

    1. Hi Scott

      I learned to be cautious about the so called buying advices etc..

      Why is RJ the latest days among the biggest sellers even if they claim an sp atv 2.25 or more?

      The latest artickle about the abusse of management team on this board showed how some are trying to advice to buy shares while these guys are dumping .It's very easy as a bank or brooker etc.. to give buy or sell advice to do the opposite and gain on both up and down moves.Bourses are a game played by big investors .The trick is not to get trapped in their acts.

      1. Hi sharky:

        I agree with you not to trust what the analysts say as they mainly go on BNN to promote the stocks that they own in their funds and after they appear on Market Call or Market Call Tonight, when they promote a stock it generally goes up the next morning and they most likely sell some of their shares when this happens. The big financial houses also put out target prices for shares to help them to unload the millions of shares that they have acquired , at a higher price. I am not in a buying mode right now so none of this will effect me, however as a long term shareholder in CLL, as many others on this board are, it would be nice to see our shares appreciate in value over the next number of months. As for RJ and the other big financial houses, they are still dumping CLL shares at present because they most likely collectively still have around a hundred million shares ( a wild guess) that they are presently stuck with after they picked them up last fall in the .90 cent per share offering that they bought out. Anyway, neither you nor I feel sorry for them as they are making a big profit now on every share that they dump. They are biding their time and selling hundreds of thousands of shares a day "manipulating" the share price by keeping it on an upward trajectory. It appears that they are being very careful not to release too many shares at once, which would put the share price into a downward tail spin which would then take them many more months to unload the many shares that they own. The question is, I wonder how long it will take them to finally get rid of all of shares that they have left from that .90 cent offering.

        Best Wishes; Scott

        1. Hi Scott

          Agree with you about the houses moves on the sp.

          I think sp will firmly start rising again after summer.All markets are in very high territory and i think they run at of steam.Then we are at start production too.

          So far around 1.70 is a lot of action in past days.

          I would like to buy back in the 1.55 zone .As for today the news has no major impact and CLL is in line with the markets and oil .

          All by all this is not a bad event and now it's hoping on some stable envirioment from both production and oil price etc..

          But I would like some eps predictions for Q's to come.It's not we can hopefully start prodcution that this can only support sp.We need to consider that we have a double in share amount as well.So before the deal with one pod sp was running towards 5 $ in latest spike 2 years ago.So we probably if we are lucky they can have 16.000 at Q 1 next year .What will MRC be doing on support side for sp?That's where it's all about .Cash flow and eps for a support in sp.

          These analyst may predict what they want we need facts and hard numbers.

          1. Sharky

            It is always hopeful that you may be able to buy in at $1.55, maybe that will happen. Sounds to me like you are nervous and rightly so. I had hoped for Algar being built on time, and I am pretty sure it is under budget. Normally SP drops on news, good or bad, so it may still drop. If it doesn't, the train will start to slowly leave the station and $1.55 will be long gone, imho.

            Their cash flow is pretty good, not stellar, but good. Facts and hard numbers will come, but the train will be long gone, look ahead, the light is not a head light.

            1. Replying to @spiderman8

              Hi Spidy

              The only reazson so far I didn't buy back is the overbought markets situation .It seems today could be a start for profit taking.

              I watch other oils as well and though oil price has gone over 84 top they didn't follow the run up and couldn't make another high.i don't see CLL go further up if major markets are struggeling.I think all construction events where in the sp before this news already.

              So now it's just waiting for a few months until production starts.For pod 1 we also knew they stuck at 8.500 for a while and it wil take some months until the rest of the esp's is on place.So I don't see why we should go further up if markets fail .

              You're right of looking ahead but we must not forget about market situations and behavior as well.

              See this Dow charts.Almost all white candles since the collaps.That's not very normal.

              1. Replying to @sharky

                Last winter when we were on a caribean cruise,They told us if you go off on your own take your camera that way you can get a picture of the cruise ship leaving the docks ,with out you .does this sound familiar .

                BJ

                1. Replying to @B-Jay

                  Well I don't think the ship will leave that rapidly.

                  Yesterday the bourses were pretty shocked about the GS news about the fraude claim.

                  so will be interesting to see the reaction next week.Some earnings too seems not to be so overwelming.See this big red candle on the sp500 index.First level to a possible stop if a downturn starts is the 38 % level at 1150.

                  If that is indeed the case also CLL will follow the trend.

                  1. Replying to @sharky

                    Sharky:

                    The major issue is not fraud. The real issue is that there are still massive quantities of derivative securities floating around out there. In excess of 100 trillion $ of derivative securities are still in limbo out there. That is more than the worlds gross domestic product for one year by a large margin. Can you guess who the largest writer of derivative contracts was? Whoops, Goldman!! Warren Buffet called derivatives "Weapons of mass financial destruction." The world still sits on the financial equivalent of all of the nuclear weapons it ever produduced!!

                    Brian

                    1. Replying to @BKM8572

                      Hi Brian

                      If that's the case that could have some more consequences.I just read they had done transactions in the CDO's and while they new this could have a serious effect on the world economy they started to play on the downside of the market with option strategies.

                      That's why I have waited to buy back because the indexes were not in normal situation since begin March this year.

                      I don't know where you got your information but I guess you in the US are better informed about the GS news so now I'm curious for next week.

                      So let's see who has done the best by selling a week ago .Indeed for CLL future is not bad but if markets will fall CLL will go along.

                      It is clear that the commodities market and also oil is driven by speculators in the future markets and the hedge systems around it .Like Warren said "Weapons of mass financial destruction."

    2. Hi Scott,

      definitely, it is good new.Connacher and DG have never had delivering interms of actaul hands on, like building. The issue was the debt and dilution that they did not see it coming.

      More than the 3 day ahead of schedule, I am delighted that Algar has 30k design capacity. My understanding is that if the approval to produce more than 10k is given, then cll can produce 20k more from ALgar in litterally months after approval.Is this true?

      But in case of Pod 1 they have to expand as its design capacity is only 10k??

      It this is true then, cll can produce 40k by end of 2011. They have applied for the expansion and algar can produce 30k in interms of design. I have this exusion rubs over pdp.

      thanks

      1. Believe in CLL:

        Be careful of interpreting the press release. When you are excited about the 30k design capacity, which number are you looking at? Here is the first paragraph from the press release:

        Algar has a design steam generation capacity of 30,000 bbl/d, which at its long-term target peak operating steam:oil ratio (SOR) of 3.0, is anticipated to facilitate production of 10,000 bbl/d of bitumen over a project life of more than 25 years. The project was designed to allow for expansion to 34,000 bbl/d of bitumen production in subsequent years.

        You have to remember that the first 30k number is STEAM GENERATION CAPACITY. That's what they have now. That only gives them the capacity for 10k of bitumen production at the current time.

        Algar as a whole is designed FOR EXPANSION to 34k of bitumen. However, this simply means that other potential bottlenecks in the plant were engineered to accommodate future larger production than the existing plant with minimal upgrading. Basically, it is my understanding that before Algar grows to 34k bitumen, it needs to tie into one (or possibly even two) more pod(s). The company still needs to apply for approval for more pods.

        Now, someone can correct me if I'm wrong, but I believe that an application for expansion of Algar was already submitted well over a year ago, and is tentatively expected to be approved, we hope, within another year. THAT application would keep us on track for the timeline of starting construction of all required facilities to start production at a third pod in the next couple of years. That production would feed into Algar too. That construction would include the simple infrastructure to start working on pod number three, ie. the additional series of well-pads, etc. And then that production is fed into the Algar facility for processing.

        It would be great if two posters who are more familiar with the process to contribute the following info:

        1. A "layman's" explanation of what standalone facilities are needed for a new pod feeding into Algar plus an explanation of what existing Algar infrastructure can be shared by the next pod. Someone like 2Crude could probably explain this very easily and comprehensively.

        2. Maybe someone else can dig up the latest maps/seismic showing the approximate physical locations of all pods that have been identified to date?

        1. Marlboro,

          Good post about the Algar designed production limited by Steam Generator capacity and SOR.

          One has to remember that designed capacity at 10,000bbl/d does not indicate the average production of 10,000bbl/d.

          8,000 to 9,000 quarterly average is most likely. This will increase CLL total bitumen production to 16 to 18,000 bbl/d by Q3/Q4 of 2011

          IMO the latest company announcement did not have desire effect on the CLL SP because it was well advertised in advance and all parties involve know that the most difficult part of the Algar project is in front of us. In 12 to 16 months we will see if the project was successful , on time and on budget.

          As we all learn, this is not the one time "push button" start up process and as such it is impossible to be ever describe as "on time or on budget ".

          After 2 years POD1 is still in the ramping up production mode (quarterly production at 6500bbl/d) and actual POD1 numbers are suggesting that up-today total cost (about $500millions) doubled the initially projected cost ($275 million).

          IMO the 2011 will be the consolidation year and not a expansion year. For starter , CLL will not generate any substantial free cash flow (possible less then $50 millions) which can be reinvested in the expansion. 2011 expansion would mean new dilution (200 million shares) or partnership, as was suggested in Jan by CLL Vice President Grant Ukrainetz.

          1. 2011 expansion would mean new dilution (200 million shares) or partnership, as was suggested in Jan by CLL Vice President Grant Ukrainetz.

            Jurek brings up an excellent point here. Where do we go from here?

            My opinion, and this is only a wild guess, is the following: if CLL knows that they need to go to market for additional equity, then they need to get the stock price back up. How to do this? The only real light on the horizon that I can think of is that the annual reserves re-evaluation report by GLJ usually comes out around the third week of July. That encompasses all winter drilling and is a snapshot as of June 30th. Two things will significantly affect the valuation of the reserves at that time, namely: (1) the price of oil on June 30th; and (2) the amount of additional 1P, 2P, and 3P reserves that can be delineated as a result of drilling since January 1st. Therefore, if I was CLL at this point, I'd be drilling like crazy, trying to expand reserves. Unfortunately, I think that this goes counter to the strategy that I believe Gusella has been employing for years, namely that of "drill just the bare minimum so we can move forward but not attract attention from the big boys who might try to buy us out prematurely based on reserves."

            On a separate but related note, I actually just sold 40% of my holdings this morning. I don't get a good feeling right now from the markets. They are at a high, and can certainly go higher thanks to the massive government injections of stimulus liquidity, but I don't think the underlying value of the markets validates the levels they are at. Any number of things could be a tipping point to start sending us lower again - the ongoing Greece saga, the Goldman-Sachs story, CDO's, maybe even something as innocuous as airline problems. Algar is complete. I don't think an announcement in four weeks that we're under budget will stir the stock price. We're still half a year away from commerciality, and as we know from Pod1, things can go wrong. I still think that Connacher is a great company, but I feel that we're not going to see upward movement on the stock price until at least close to the end of June. The "sell in May and go away" mentality is also to be considered. I may regret this decision, but I think that I can probably get back into the stock at a lower point eight weeks from now. The AGM is in the interim, but historically, the AGM has never influenced the SP no matter how feel-good the presentations were.


            1. Replying to @MarlboroDog

              That's why i also stay on the sidelines until a lot has cleared out and like you wote a lot of all we know is calculated into the CLL sp.

              It still holds well at 1.7 for a while but further bad sentiment in the markets and indeed the "sell and go way in May" can bring a lack of momentum in the stock.Indeed reserve report in June can bring attention into the stock again.

      2. Hi believe in CLL;

        In order for Algar to be expanded beyond its current 10,000 bbl/d of bitumen design capacity several things have to happen. Later this year Connacher will submit its final designs and environmental application materials to the ERCB later. Management expects that they will get the Ok to build the expansion starting in 2012 as stated on page 30 of the latest presentation http://www.connacheroil.com/en/documents/presentation/cll-2010-04-ppt-v2.pdf

        In terms of building the expansion, DG already stated that Algar will be the central processing facility for the bitumen, and snap in modules will be added to the Algar facility to enable it to process the extra 24,000 bbl/d of bitumen (34,000 bbl/d of bitumen total including Algar's 10,000 bbl/d bitumen production). For Phase 1 of the expansion (there are 3 phases), Connacher will have to build 6 remote satellite well pads and drill 35 to 40 more well pairs and pump the steam to them to produce the extra bitumen. If you look at the Public Disclosure Document on Connacher's website it will explain everything that you need to know that is currently available on the expansion. http://www.connacheroil.com/en/documents/corp/CLL-2009-03-Public-Disclosure-Document.pdf

        The Public Disclosure Document is on CLL's website if you click on the About Us tab, it is the first item dated March 9 , 2009 under Corporate Certificates and legal Documents. Page 12 shows the diagram of the 3 Phases of the expansion project.

        2C has already given a detailed explanation that POD 1 is limited to it's existing design capacity unless 200 - 300 million more dollars are spent to enlarge it by replacing a lot of its current parts which would be a huge undertaking which may not be very practical.

        Connacher will not be producing 40,000 bbl/d of bitumen at the end of 2011. The number will be closer to 20,000 bbl/d of bitumen if everyting goes according to plan.

        Best Wishes; Scott

        1. Expansion isn't going to happen real quick. First they have to commission, then steam then get it up to design capacity. This will take some time.