Skip to content
Sign in

Post

Copper Fox Metals Inc.

Mail Room2.6 rating from 59 members128 ptsRate

Slow assays

Assays are slow not due to the assay method employed but due to the sample preparation which takes long time. A few days are enough to report the assay results if the samples are ready.

Normally the full drill cores taken from the underground have to be cut into half cores (or even quarter cores), and store 1/2 of the half cores for future use.

Imagine the time needed to cut 500 m of full drill core into half drill core by a saw.

The remaining half core samples are cut meter by meter. there would be 500 samples if the hole is 500 m in depth.

Each meter sample has to be crushed (say to 10 mesh) and then further pulverized to very fine before sending out for chemical assaying.

you need to log in the cores properly before doing all of above.

Hope this will help.

Join the conversation about Copper Fox Metals Inc.

Reply

Replies

  1. Thanks BCmetallurgist. How does the geotechnical interpretation of the core affect the core slicing and assay sampling? Is this just a matter of "oh, there is a fault at x depth, inclined at Y degrees blah blah blah"? Or does each crack and other structural anomally need to be dissected and puzzled with prior to splitting and assaying? I've noticed that our geotechnical/deliniation cores are delayed a bit more on average but it could be their place in the que.

    tia