2 bucks?

The old RE says 7.6 billion lbs of copper even at $3 a pound =23 billion dollars -at negative production cost =28 billion dollars in black and white. without silver or the new drills or the new land or the new copper price.Thats the rock bottom low value here .

Who on earth would sell 25% of that for under a billion dollars (or 2.20 a share) no way.

  1. The Measured and Indicated mineral resource for the Schaft Creek deposit (at a 0.20% copper equivalent cut-off) total 1.01 billion tonnes grading 0.27% copper, 0.017% molybdenum and 0.18g/t gold (copper equivalent 0.46%) containing 6.1 billion pounds copper, 383 million pounds molybdenum and 5.8 million ounces gold,
  2. The Inferred mineral resource for the Schaft Creek deposit (at a 0.20% copper equivalent cut-off) total 283.6 million tonnes grading 0.24% copper, 0.011% molybdenum and 0.15 g/t gold (copper equivalent 0.39%) containing 1.5 billion pounds copper, 69 million pounds molybdenum and 1.3 million ounces gold,
  3. The silver grade of the Schaft Creek deposit is estimated to range between 1 and 2 g/t. The silver content of the deposit has not been included in the resource estimate due to legacy data issues as previously disclosed.

Join the conversation about Copper Fox Metals Inc.

Reply

Replies

  1. The 2007 resource estimate shows 69.4 million ounces of silver.

    2007 Resource Estimates:
    The Measured and Indicated resource at Schaft Creek has increased to 1.393 billion tonnes averaging 0.25% copper (7.7 billion pounds), 0.18 gpt gold (8.1 million ounces), 0.019% molybdenum (584 million pounds) and 1.55 gpt silver (69.4 million ounces) at a 0.20% copper equivalent ("CuEq") cutoff.


    1. The 2007 resource estimate shows 69.4 million ounces of silver.

      Yes and it will be back....

      ''Upon receipt of the assay results from the remaining seven diamond drill holes of the 2011 program, expected shortly, the Company will initiate the preparation of an updated "Resource Estimate" to include the results of the 2011 program. The metallurgical test work results for the Paramount zone are very encouraging, showing a high percentage recovery for the various metals including silver."

      1. Why are you underlining "including silver"? It's saying metallurgical test work results for Paramount zone are encouraging including silver.

        IMO, the FS will come first. Then an updated Resource Estimate with silver. I just don't know why silver is taking so long to figure out thouhg.

        1. IMO, the FS will come first. Then an updated Resource Estimate with silver. I just don't know why silver is taking so long to figure out thouhg.

          History: The Schaft Creek Project was extensively explored and drilled by several mining companies since its discovery in the late 1950's culminating with the completion of a pre-feasibility study by Teck-Cominco Corp. (now Teck Resources Limited) in the early 1980s. In 2002, Copper Fox Metals Inc. secured the rights to acquire a 100% working interest in the project pursuant to an Option Agreement with Teck Resources Limited ("Teck") and related underlying agreements. Copper Fox has since earned a 100% working interest in the project (subject to the terms and conditions of the Option Agreement and an earn-back Option held by Teck) and has incurred expenditures of approximately $63.6 million to the end of July 2011.

          The fact of the matter is there is a lot of data to be interpreted, starting with Hecla Mining, who discovered Schaft Creek in 1957 if Im not mistaken. Shaft Creek is 55 years old.

          Theres been a lot of drills in there, so I imagine theres an absolute ton of data to be interpreted, and probably some of the data is old and done in old ways. Perhaps it could be taking old data and reinterpreting it with modern methods, prehaps they just made a mistake and had to go back to square one figuring out silver. Im not certain but a deposit of this size requires a lot of scrutinizing to make sure its done right. We omit just one material fact and it could have serious ramifications.

          Personally Im quite content to just wait until the jobs done right with no rush. I know everyones tired of waiting but thats because we keep hyping ourselves up that its "just around the corner"...I cant wait to see the final result either, but mining is no quick industry and small delays are proportionate. Patience is always rewarded.

          Rogue,

            1. Replying to @orcinus

              CUU wanted the silver in, BUT the engineers did not. That's all I was able to get out from CUU.
              

              2003 RE                     cu-eq     Tonnes   Cu         Mlb      Gold    Silver  CuEq
                                Giroux M&I 0.20       991    0.28      0.018     0.19    1.77    N.A
                                Measured   0.55       100.7  0.43      0.028     0.32    1.85    0.65
                                Indicated  0.55       108.3  0.40      0.034     0.36    1.19    0.66
                                 Total M&I 0.55       209.0  0.41      0.031     0.34    1.51    0.66
                                 Inferred  0.55       2.4    0.53      0.035     0.15    2.11    0.71
              

              Notes: (1): ("M and I") stands for Measured and Indicated. "Giroux" refers to the resource report by Giroux & Ostensoe dated June 30, 2003 and amended May 20, 2004