Has anyone considered

tommy2tone wrote: Has anyone considered the possibility that the Pfs numbers were just that and when the bfs numbers came out they sucked resulting in a complete redo. I got a buddy who is a pres of a jr mining company and he thinks givin the New timeframe this is a possibility.

This is a very real (increased capex, mine pit slope...) and frightening possibility.

If TT is (apparently) so inept that they are unable to complete a BFS in a timely fashion, how can anyoine trust the end result?

Scary stuff.

Skyaki

Join the conversation about Copper Fox Metals Inc.

Reply

Replies

  1. I think we all need to consider the possibility that the draft PFS numbers were not working and/or the mine plan for the NE wall encountered tough engineering challenges.

    However, the company didn't say a peep about that in the NR so we will have to ask CUU management direct, pointed questions as to what they do know about the mine plan and economics.

    The mine plan should have been done or close. The fact that CUU management has been stating that the BFS was on time for end of Q1 gives me doubt that the mine plan was not more advanced than what the NR states. How could CUU be maintaining that BFS is on schedule if the mine plan was not on track?

    We are two weeks from end of Q1 and the targeted BFS date but we are 6 to 8 weeks from a Mine Plan and how many months from BFS?!

    Copper Fox has been advised by Tetra Tech that due to manpower shortages and scheduling difficulties of staff the March 31st timeline for completion of the Feasibility Study will not be achieved. The main difficulty being encountered lies with the completion of the Mine Plan, the most critical component in the Feasibility Study, which now appears to be six to eight weeks behind schedule. Due to the fact many important components of the Feasibility Study cannot be finalized until the mine plan is completed, a further delay will ensue. It is now expected that completion of the Feasibility study will be delayed until mid-late summer, 2012.

    The new timeline suggests that the draft mine plan needed to be thrown out and everything started over. Including the 2011 drilling into RE3, mine plan #2, BFS might give them the economics to move mountains.

    Taking the NR at face value, staffing issues can be big problems. Did a key engineer on the SC project leave? I don't know how big Tetra Tech's Vancouver office is but they have an impressive list of job openings (note two pages of jobs!): https://tetratech.tms.hrdepartment.com/cgi-bin/a/searchjobs_quick.cgi?order=jobs.timedate%20DESC&start=0&kand=&kor=&kquote=&knot=&geog=Vancouver_BC_CA&qty=25&sj=1&search=Search%20Jobs&s_lcid=en-US

    All of us have more questions than answers.

    Unfortunately, the 2011 drilling is located in an area and at depths most influenced by the NE mine wall so the engineering is not going to get easier. If we push Paramount farther North (into steeper terrain), the North wall could become a problem as well.

    jmho

    1. Chappy, great post. This seems like the most reasonable explanation for what went on.

      As a non-geo, can you explain to me why the mine plan takes so long to devise. I understand that there are a lot of different issues involved but with the power of computers and software these days, I would think that it shouldn't be as massive an undertaking as it seems to be.

      From your own p.c., you're able to create unbelievable maps, pictures etc. in a matter of hours to help us non-technical people understand what CUU is telling us in their NRs. I'm sure that a mine plan is more involved but if Tetra Teck is already so late and catching so much flack for this, it seems unfathomable to an outsider that they wouldn't be able to push this along in a shorter timeframe.

      1. Trader: "...As a non-geo, can you explain to me why the mine plan takes so long to devise. I understand that there are a lot of different issues involved but with the power of computers and software these days, I would think that it shouldn't be as massive an undertaking as it seems to be."

        I am not sure that my ideas on what is involved in a mine plan are that credible or helpful but here is my understanding. SC is huge. Mineralization extends about 2.5km north to south (DDH 425 to just short of DDh 421) so there are a lot of problems taking 3 to 6 inch drill core in a few spots to confidently predict the rock's characteristics over such a vast area. How many geotechnical drills do we have? The economics and safety issues require confidence. Where you don't have confidnence you need to compensate with more conservative engineering practices such as wider benches and shorter drops to lower the overall angle of the pit walls. The NW wall may be in the order of 1000 to 1500m in height (1 to 1.5km, 0.6 to 0.9 miles) above the floor of the final pit. Imagine how small you would feel looking up at almost a mile high wall of rock!

        Mt Lacasse is steep in the NW corner of our deposit. Increasing the slope of the ground exacerbates the engineering issues for safety and economics.

        Engineers need to sign off on the plans they devise and are accountable for them. Engineers (in BC anyways) wear an iron ring on their pinky finger made from steel recovered from a vancouver bridge (the Second Narrows bridge) that collapsed during construction and killed a number of workers. The ring serves to remind engineers that their plans matter to people's lives. Further layers of conservatism and restraint.

        Poryphry deposits (SC included) tend to be quite complex geologically (mineralization, faulting etc). Complexity leads to uncertainty leading to more restraint. Poryphries also tend to be located in sizmicly active areas (ring of fire); earth movements are not an exact science. More conservatism.

        Lowish grade deposits like SC don't have a lot of wiggle room for fancy, expensive engineering options - staggering amounts of material needs to be moved from point A to point B. Blowing up strong, heavy rock and transporting it cheaply only offers so many alternatives. Digging up to 500-600m of rock takes time and time is money. Stockpiling low grade ore for processing at a later date takes time, money and space. More constraints.

        SC does have plenty of barren rock and also some acid generating rock. Barren rock needs to be moved and wasted somewhere cheap and permanent. Constraint. Acid rock needs to be isolated from streams and preferably covered by water to prevent oxidization and leaching. Constraint.

        Ramp angles out of the pit for ore trucks need to be such that laden trucks can crawl out. And wide enough to safely handle very large machines. Meanwhile other folks are in the same hole blowing stuff up and loading empty trucks.

        All of these constaints (and more for sure) need to work with the lay of the mineralization, and the surrounding landscape. It isn't all in a neat funnel shape like a completed open pit we all can imagine.

        I imagine that the engineers start with a resource model (RE) and try a best guess at how to mine it in a computer model with all of the constraints in mind. I don't know what happens with the computer models at this point; do they run minutes or days to spit out an optimized plan? How many iterations do they do? How good are they at modeling reality? Computer models are only as smart as their worst section of computer code. The output from the computer model then needs to be scrutinized and annointed by a qualified human (qualified professional).

        All this is from the top of my unqualified head...

        1. The NW wall may be in the order of 1000 to 1500m in height (1 to 1.5km, 0.6 to 0.9 miles) above the floor of the final pit. Imagine how small you would feel looking up at almost a mile high wall of rock!

          Below is Bingham Canyon Mine - http://en.wikipedia.org/wiki/Bingham_Canyon_Mine look at the bottom, there is an ant....no wait it is a rock truck! LOL

          1.2km deep x 4kms wide - deepest open pit in the world (Rio Tinto)

          I'm no expert, but based on Chappy's notes above, we will be similar in magintude. The Engineering - Mine Plan would not be that easy to say the least. I would think that not many consultants cross this bridge wrt Mine Plan Development.

          Wardrop must have lost key staff - stress level is likely high with Copper Fox and other deliverables. Like I mentioned yesterday, Qualified technical staff are hard to come by. You can pull any BSc, M.Sc, P.Eng., B.Eng. PhD from school or jane doe consulting and they know nothing. Billions of dollars are resting on this work and there are only a few key staff that do this work. The mining consulting business is not really all that big especially at these levels.

          PAY BACK IS KEY. Payback = optimize the processing of high grade starter pit ore and CAPEX and OPEX to the shortest payback period. (we have a large deposit, but payback is key)

          A possibility - Mine plan was a bit complex and Tetra lost staff.

          Another - Payback is not working out so inlude 2011 drills and Ag.

          GLTA hav a great day

          File:Bingham Canyon April 2005.jpg

          1. I like the picture of the mine Gi-nor-mus Good perspective.

            I see no reason why management would sand bag us.

            If the delay were not the contracters fault ,then they would be suing us today . A trading halt followed by an international announcement that your company sucks is quite a serious reputation assualt.I wouldn't want my company in that release.!

            Delays happen -Try waiting for the Government Ha!

            I do think that CUU has poor media relations. I think they have a moral responsibility to provide shareholders with more accurate information .(we invested out of good faith in a public company ).They must hire a proper media relations person or company,what they have now is simply not good enough.

            P.S.(I vote for Vette -get on the payroll). not kidding

        2. considering all of the potential issues I raised with the mine plan...

          We still have some $32.4 B* in metals in situ with RE2011 and this can only be improved in grade and tonnage with RE3.

          I think SC is a very viable project.

          (some 'negative' folks either can't follow (ESL?) or like to twist my comments to their advantage)

          *Cu $3/lb, Mo $15/lb, Au $1200/oz, Ag $23/oz @1.7gpt

    2. Chappy,

      Your explanation sounds the most probable. As a former engineer and PM I for one cannot believe management was not on top of this and knew full well what was going on. Something radical must have happened and I believe your explanation that the draft mine plan had to be thrown out and reworked for one reason or another makes the most sense. The new timeline suggests that a new plan is being worked obviously to incorporate the new RE with better grades in the Paramount Zone.

      The thing that really bothers me is management's willingness to obfusticate these issues rather than being forthright with shareholders. If there was a problem tell it like it is and let shareholders know we need a rework of the entire mine plan. Let shareholders know with regular updates that a rework will take more time but the end result will be much better. Don't string us along that everything is ok and then cook up this lame excuse to cover your ass. Investors respect honesty. ES was telling everyone at PDAC that everything was right on time and that the numbers were going to amaze everyone. Now we know that was a load of bull. Investors expect honesty from management even if that honesty is not going to be liked. We can live with that but don't string us along like we are two year olds.

      1. Just out of curiousity, why do people find it so hard to believe that TT did lie about their progress to Elmer & management? From what I understand, Wardrop was taken over by TT and CUU was a Wardrop project - and because of this could have been "put to the side" to finish projects that were from TT, possibly with the intention/thought that they'd be able to do it in a short amount of time (underestimating how big and difficult SC is to work with).

        I realize that it's a bit incompotent that management wouldn't know exactly where and what was going on and that going from "on-time" twice, to "delayed for another few months" but, that would be why we would hire oversight at this point, but if the reason Elmer didn't know was because he was lied to, doesn't that stand for grounds for a fine, or a lawsuit or something?

        Because either Elmer is lying to us (his own reputation, that he's built for decades and still needs for further projects such as BXX) or he was lied to. At least that's what the NR implies if you don't look deeper, which we shouldn't have to - if Chappy is right, the news report should say that we're working on a new mine plan because the old one wasn't working. We're not even promised the new RE in the BFS, just the "possibility" of it being there.

        1. JayJ,

          See attached an email I sent to investor relations at tetra tech in California :

          Will advise if I get a reply as I sent this too corporate office for whole company or will they through it over to Canadian division :

          http://www.tetratech.com/us/contact-us.html

          [email protected]

          Good morning Talia,

          Just a quick question regarding some work your ( our ) company was completing for Cpper Fox
          in Vancouver B.C.
          There has been delay after delay with this company getting out a BFS which Tetra is working on.
          Their news report yesterday stated that latest delay was a result of Tetratech.
          Can you please advise whether and how bad the back log situation is with us and will
          this be a common thing going forward as it will not look good in the eyes of new customers or current shareholders.
          Regards
          examples below :

          Copper Fox Metals (TSX: V.CUU, ) received the most reads and posts on a day its share price slipped more than 12%.


          the above are just some of the reports posted - they are all over the newswires in Canada

  2. Just putting this out there....

    Management is excellent......A delay was a possibility the whole time...Schaft creek is a massive project. I have nothing but faith in them and will continue to do so. Investors hate having their money tied up for too long and all we're seeing right now is the people that want to go to cash and play with other stocks.

    Im going to bring a few things up;

    1)All the times it was posted on this board that "Elmer promised us it would be out by PDAC" etc. etc. As I alluded in my post on Friday....management needs to be vague about these kinds of responses. The fact that its written here as a promise leads me to believe theres some kind of spin thrown in. This boards been in buyout frenzy for a long time and I do believe that a lot of the positive misrepresentation on timelines is to blame for people feeling let down, I dont think mangement has much choice here. They said Q1...where did the "before the PDAC" come from? From here on out...call the company yourself...dont rely on the posts here as gospel, there is definately spin to the positive thrown on them.

    2) Q)If you do a BFS.....followed by a revised resource estimate what do you have?

    A) An outdated BFS.

    So you really cant do the bfs first.....it makes A LOT more sense to be done this way in the first place. Be patient ladies and gentlemen.....and Ill be the first to say....it might be longer than mid-late summer....do not be surprised.

    3) Theres a ton of companies out there looking for resources. A lot more than there used to be thats for sure. We still only have the same amount of Wardrops, Tetra-Tech's, Amecs etc. Ever been to a busy restaurant? Thats right....it takes longer.

    4) Anyone who went all in and is desperate for cash right now....guys Ive been there and it sucks...believe me I know. Please remember who made the choice to put themselves there.....that is not managements fault.

    5) Big E calls the shots.....no matter how pissed any of us get, or what we want, hes got the power to overstep all of us.....honestly....I dont think we even matter in the equation between Big E and Teck....we're just hitching a ride.

    Just my .02.....Im really not surprised at the delay whatsoever.

    The endgame hasnt changed a bit....its just going to take longer to get there, the reward will come when the job is done.

    Rogue,

    1. Rogue: "...All the times it was posted on this board that "Elmer promised us it would be out by PDAC" etc. ",,,

      I've seen this mentioned a couple of times that people have been saying that CUU promised BFS would be out by PDAC. I dont recall seeing any post whatsoever. I do recall posting a fond hope that it would be out by PDAC. I recall people pouring water on that hope. Please show us one post where someone is quoting that managment made such a promise.

      I agree that a BFS followed by a new RE renders the BFS obsolete, but I believe that is how mining works. Even while the mine is working the resource will be explored and updated. For our purposes, the BFS was really about triggering the TCK clock and buyout.

      I agree with your subsequent points (3-5).

  3. I think there's two issues at play here.

    1. The IRR wasn't that great, considering we know the 2011 drill results were great in the paramount zone, adding RE2 into the BFS (and improving IRR) will make it far more appealing to us and Teck.

    2. The mine pit slope issue. I think they're weighing sacrificing some pounds in the ground to keep costs down, or increase the capex to get to all the pounds.

    All this is not to say that the BFS is terrible, I think it means we still have an above average deposit, it's just not the jackpot we thought it was.

    I also recall someone mentioning from discussions with CUU at one of the investor conferences that the bloggers had to be realistic on their buyout prices.