Skip to content
Sign in

Post

Copper Fox Metals Inc.

Prez3.3 rating from 97 members6.3K ptsRate

RE Observations

I've noticed a few differences between the 2011 RE and 2012 RE. The differences are most likely the result of different definitions, but I thought I'd point them out anways.

1. Drill Hole Quantity

The number of drill holes has decreased from the 2011 RE. Any guesses why that may be?

2011 - "The estimation database comprises 366 core holes (84,221.49 m)"

2012 - "A total of 286 drill holes with 16,501 composited (4 m) drill hole intervals (approximately 65,843 metres) were used by Tetra Tech in estimating the mineral resources for the Schaft Creek deposit. "

2. Liard / Paramount Quantities

2011 - Liard = 880M tonnes, Paramount = 155M tonnes

2012 - Liard = 741M tonnes, Paramount = 488M tonnes

3. Liard / Paramount Dimensions

2011 - Liard = 1000x700x300m, Paramount = 700x200x500m

2012 - Liard = 1500x1000x600m, Paramount = 1300x400x600m

Join the conversation about Copper Fox Metals Inc.

Reply