Skip to content
Sign in

Post

Copper Fox Metals Inc.

The post this replies to is no longer available.

VEEP3.6 rating from 69 members1.3K ptsRate

Re: nr question

"When you read it carefully, that statement is ambiguous.An interval has a start point and end point. We know the end point – it is 769m.But what is the start point? is it 769-250= 519 m (a 250m interval) or is it from 250m to 769m (a 519m interval).That is a big difference."

DDH 2012CF427 located 400m north of DDH 2012CF426 with a core length of 769.3m intersected visible copper +/- molybdenite mineralization from a core interval of 250.0m to the end of the drill hole at 769.9m. The chalcopyrite+/-molybdenite mineralization is open at depth,

The core interval starts at 250.0 metres and ends at 769.9 metres.

Join the conversation about Copper Fox Metals Inc.

Reply

Replies

  1. I agree and don't find it pretty clear.

    It states clearly there is visible copper "from...250m to the end of the drill hole at 769.9m."

    That's an interval of 519.9m.

    The hole 400m to the south 2012CF426 showed visual chalcopyrite mineralization in approximately 90% of the sample.


    Chalcopyrite is good stuff from what I've read. Yeehaw, bring on the chalcopyrite!

    http://en.wikipedia.org/wiki/Chalcopyrite