Skip to content
Sign in

Post

Copper Fox Metals Inc.

VEEP3.1 rating from 203 members9.3K ptsRate

Not drilling for Teck.

This means Teck has drawn a circle on the map and decided to stay within the contracted areas. Teck will not be offering for the whole thing.

This makes me think the drilling was for another party who has asked for more drilling. That would be why we are not entirely happy about reopening the camp. They said just show us a couple of holes and you have a deal. Since we lost some they said not good enough go back and drill a couple more.

So we probably do have a partner and we are drilling to make them happy. That means it's not under contract but open to other offers.

Join the conversation about Copper Fox Metals Inc.

Reply

Replies

  1. Teck will not be offering for the whole thing.

    That would be why we are not entirely happy about reopening the camp.

    Are these facts or your opinion? If facts, where do you get this information?

      1. So it is opinion then? You think our expenses are indicating a lack of Teck interest? How so?

        On the topic of expenses, we have surely run out of money again. They haven't closed the last PP yet, I suppose they could just extend the amount. What would cause a delay in closing a PP? They had the money right away, I'm sure.

          1. it could of been a just in case pp maybe they havent spent a penny yet or received a penny yet.

            No, they've been spending a lot of money drilling and buying properties down in Arizona. EE doesn't give just in case money. It's always targeted.

          1. It was my thought/opinion that the $2,000,000 loan this spring was for the Arizona properties. The timing and the amounts involved seem to match up much better. The loan was independant of any of the PPs this year. Disclaimer: Opinion

            http://www.newswire.ca/en/story/993213/copper-fox-announces-second-quarter-results

            Subsequent Event

            Subsequent to the quarter ended April 30, 2012, the Company acquired two groups of mineral tenures totalling 13,092.6 hectares (45 mineral tenures). In addition, a company controlled by a Director loaned the Company $2,000,000. The loan bears no interest and has no fixed terms of repayment. These transactions were recorded at the exchange amount agreed to by the related parties.

        1. As far as I know, CUU hasn't advised anything about drilling. They said they are considering it. That NR sounded more like a heads up, we're ready warning to Teck.

          Phase 1 of the 2012 exploration program including diamond drilling has been completed. Additional drilling may be undertaken in September

          Mr. Stewart, President of Copper Fox stated, "Although to date the drilling was limited in extent, it achieved the first Phase of the objectives of the 2012 exploration program. A Phase 11 program is currently being considered.

          Results of the interpretation of the airborne and Titan-24 surveys over the Schaft Creek project by Mira Geosciences are expected shortly

          The results of the feasibility study for the Schaft Creek project are expected to be delivered in September 2012. The optimized mine plan has been completed. The majority of the sections of the feasibility study have been drafted and reviewed.

            1. Replying to @Prospekt

              But, I thought someone had reported seeing a drill move on to the site?

              I guess it's there while they're considering it. But until CUU NR's that they're starting a phase 2....

          1. 80.8 in expenses as of June. No money into drilling.

            We don't have any of the other info in hand. Why?

            Teck has already seen it. It can't be with held from us unless it is with held to increase shareholder value. Elmer would have to satisfy the bare minimum by giving up 1 piece of it.

            They are stating Sept for the BFS buying a little more time. Why?

            It costs money to start and stop a camp. Why such a short shut down? That actually didn't save anything. Explanation?

            Also, you can't tell me that 4 holes was anywhere near enough on our new lands to do anything other than confirm mineralization. Since the expenses did not expand to include drilling we are safe to assume Teck has decided what they want. We have an offer. I'll concede that Teck may have made another offer on our lands but the company has stated that it was most likely that several majors would join in. We don't seem to be thrilled about drilling. I conclude we are risking our own money and there's no 4 times expenses involved here. That means a third party.

            Elmer was appointed to Liard for a reason.

    1. Sorta logical

      If we had decided we had enough information to close up shop, can't imagine that we are overjoyed about turning the lights back on

      ...and web provides a pretty good rational for why we would do it

      I too sense Teck is getting a bit squirrely here and another suiter may be the reality dose they need to get their thinking straight

      The early closure had to have been done with Tecks concurrence

      Now, not so much..

      I see potential in this activity

    2. After reviewing the May 10 news release, it sounds like the camp closure was part of the plan from the beginning. I think this is the reason they separated the drilling into 2 phases. Drill some holes, wait for results, and then use those results to drill some more.

    3. Multiple sources anf financial info like the applicable expenses.

      One thing we can gleen is that there is a third party and that validates Elmer's appointment to Liard

      1. I think it is a lot of speculation, pure and simple.

        Either way, it will be a number of months before we would get any of the data for the holes. Probably putting results into early 2013.

    4. Are these facts or your opinion? If facts, where do you get this information?

      Not sure I get the tone here

      This forum has always been as much about educated guesses and hypothesis testing as it is digesting hard news

      In the absence of actual news, which tends to our normal state, I think there is tremendous value in folks offering their opinion on why various events may or not be occuring

      As long as they are not presented as facts but opinion, they should be evaluated accordingly

      I don't think web intimated that this was anything but his opinion, and collectively we pretty much know there has been no release or other company information to clarify the new drilling

      It is, IMO, very much a valid topic for speculation and I welcome it

      1. I still talk to the company when I think I need to. The fun for me is figuring things out. I chase many dead ends but usually arrive at the right place. They have a hard time being cryptic when the financials are published and there are trends in the NRs. Take for example the question of how much is owed on the BFS? Well, what does this one cost? LOL. Go fish.

        1. Interesting question on BFS costing

          What value did we get for the aborted one?

          Seems like a bit of the cost of the new improved one migh thave been eaten by Wardrup/Tetra tech

          Surely we aren't paying full pop for the one that didn't happen plus the one that is due

      2. As long as they are not presented as facts but opinion, they should be evaluated accordingly

        No need to lecture me Meta, I was clarifying whether this was an opinion or not since this was the actual comment Web made, and it didn't say whether it was an opinion or not: Teck will not be offering for the whole thing.

        1. Sorry about that

          I'm going to blame the necessity to be chained to this damn computer, waiting for the announcement, due any time now, that will mark a life changing event for me

          Don't know about anybody else, but I really can't think much about anything else at this point

          I expect to see a lifetime of earnings dwarfed by a simple NR, and it has me a bit jiggy

          1. I'm with you on this. As much as we like to learn from the many knowledgeable people on this board, please please please get this done, even if it's not as much as we are expecting, at least we can deal with the aftermat each in our own way.

        2. It's always an opinion. Since things can change beyond anyones control everything less a NR is a foreward looking statement. Sure there's a lot of fact behind my idea but that wouldn't stop teck from offering on our lands. Just this, they have not and we have not charged expenses. Therefore, no deal yet on our lands. Given that they have not asked for additional drilling on their stuff, the company's statement that Teck has enough and is happy about the BFS let's us conclude that Teck has decided what they want. It will be up to us to accept or decline when the paper lands on our desks.

  2. Precisely my situation too, Metacomet, only on a smaller scale .

    I believe that makes a bunch of us . And patiently waiting !