I just read through the MD&A and noticed that 2 peer reviews are required. The sequence of events is:

1. Complete the mine plan - DONE

2. Review the mine plan with peer group and external group

3. Complete the economic analysis

4. Review the entire Feasibility with peer group

It sounds like we are only on #2. If that is the case then we badly missed the Sept deadline of completing the feasibility. It appears Elmer hid a fairly major delay from us.

Join the conversation about Copper Fox Metals Inc.

Reply

Replies

  1. Yes he did but on a technicallity. He said he Might produce an interim based off the mine plan. Then Columbia and BGM struck and he did an about face. I talked to him about both of them and the impact on our interim and he said no way. Now he could not touch that with a 10 foot pole. So no interim for us. Back to just the corporate walk and in light of those other two fiascos, I 100% agree. Just look at the Mira. It identified some deposits and made possible the promise of more. We had to stop talking about that because we'd need some real proof like a drill result. The company is being that carefull.