Re: Toronto show
Great message. You have moved into the top post of all time on the CUU board. Well deserved.
Join the conversation about Copper Fox Metals Inc.
ReplyThe post this replies to is no longer available.
Great message. You have moved into the top post of all time on the CUU board. Well deserved.
Join the conversation about Copper Fox Metals Inc.
ReplyLet's hope the reviewers are satisfied and we are not forced to redo significant portions of the BFS
Sounds to me like the results are great. And we're talking 20-30 Billion revenue..
Q: Why two reviews of the Feasibility study?
A: This is quite common in the industry and we want to make absolutely sure that anyone reading the report will not question the results
Keep in mind that not all of the metals in the Resource Estimate will be economical to mine. In the 2008 PFS, only 59% of the resource was converted to reserves.
This number should improve with the additional drilling that we have completed but still will not approach 100%.
I expect we will see 900M+ tonnes of ore.
I hadn't thought too much about that RT... but I thought the 2011 (and 12?) Resource Estimate really narrowed down the ore body to what was mineable (that's how we lost some tonnage). That said, the new mine plan would trump the 2011 block model so there could be some trimmage around the edges to concentrate on the most efficient, safe, economic removal of the best rock with the least amount of barren rock.
I might have to change some of my calculations but I suspect that they would get better with a more targeted ore body. I suspec the grades at the edges are the weakest so the trimmage will improve the overall average grade for the life of the mine. The life of the mine would be a bit shorter too.
Q. for the guys who talked to CUU: Any discussion of this year's Titan work? How much was done or where it might have covered?
I thought we were waiting on 1 more full core (DDH 428 or 430?) and two partial/failed cores?
The different calculation methods used in the Resource Estimates makes it pretty difficult to compare them.
The original 2007 Resource Estimate used the in situ method, which just tells us what's in the ground and does not take into account whether it can be mined economically. The 2007 RE showed 1393M tonnes of Measured & Indicated.
The 2011 Resource Estimate used the optimized pit shell method, which tells us what resource falls within an approximate open pit. This change in method is why our 2011 RE only showed 1035M tonnes in Measured & Indicated.
The 2012 Resource Estimate went back to the in situ method. Therefore this method added new resource from additional drilling AND from the change of methodology. The 2012 RE showed 1229M tonnes in Measured & Indicated.
So I would expect the 2011 RE should be fairly close to the actual reserves. It could possibly be higher because there has been additional drilling since then. However, it could also be lower because the actual reserve does not usually approach 100% of the resource. For comparison, the 2008 PFS showed 821M tonnes of reserves.
Replying to @RabidTiger
This would be a good question to ask management.
"Will the May 31, 2012 resource estimate be used for the FS or will there be an updated version."
70% of the inferred could be upgraded to indicated and the same for the indicated to measured category.
Replying to @Riskkee
It will definitely be the 2012 Resource Estimate that is used in the feasibility. I can't find a source but I know that they have stated that before. The 2012 Resource Estimate will be "converted" into a reserve based on the details in the feasibility study. Unfortunately, none of the Inferred will become reserves because the data is not reliable enough.