Some very rough numbers

Really rough numbers based on the old 2008 PFS for any of the bored on the board. Many assumptions need to be made here with many asterisks all along the way.

Start with the metal produced per year based on the tonnes per day processed (should/could update this). Then take some 2012 metal prices which might be a little high, or not. OPEX for the 2008 PFS was $12.49/t (transport, smelting, refining, processing) so I upped that 15% to $14.36/t to be safe. And yes, a high CAPEX, again to be on the safe side ... I'm actually not that risk averse based on the last 18 months of buying behavior with CUU! Just like to try and weigh the risks I take.

2008 PFS for 100k tpd 100k tpd annual 150k tpd 200k tpd 2012 prices?
Cu lbs per year 211,104,788 316,657,182 422,209,576 $3.25
Mo lbs per year 11,311,809 16,967,714 22,623,618 $11.00
Au ozs per year 199,178 298,767 398,356 $1,300.00
Ag ozs per year 1,439,717 2,159,576 2,879,434

$26.00

So without factoring in the money Teck would need to put in to build the mine, and without factoring in the extra lands (which I don't think are worth that much right now), here's a rough buyout price based on NPV discounted at 5%/8% before taxes. Despite the arguments over whether Teck is buying 25% or 100%, I like to go with 25% personally. They may not even want to pay 25% as Teck will be the one's taking all the risk going forward putting this into production. We'll see I guess.

These are very rough numbers and less developed than others here have shared, but something to peruse for any interested. Apologies for the formatting in advance.

NPV 150k tpd 150k tpd 200k tpd 200k tpd
Discount rate 8% 5% 8% 5%
CAPEX $4,500,000,000 $4,500,000,000 $5,000,000,000 $5,000,000,000
Year 1 $884,697,753 $884,697,753 $1,179,597,004 $1,179,597,004
2 $813,921,933 $840,462,865 $1,085,229,244 $1,120,617,154
3 $748,808,178 $798,439,722 $998,410,904 $1,064,586,296
4 $688,903,524 $758,517,736 $918,538,032 $1,011,356,981
5 $633,791,242 $720,591,849 $845,054,989 $960,789,132
6 $583,087,943 $684,562,257 $777,450,590 $912,749,676
7 $536,440,907 $650,334,144 $715,254,543 $867,112,192
8 $493,525,635 $617,817,437 $658,034,180 $823,756,582
9 $454,043,584 $586,926,565 $605,391,445 $782,568,753
10 $417,720,097 $557,580,237 $556,960,130 $743,440,315
11 $384,302,489 $529,701,225 $512,403,319 $706,268,300
12 $353,558,290 $503,216,164 $471,411,054 $670,954,885
13 $325,273,627 $478,055,355 $433,698,169 $637,407,140
14 $299,251,737 $454,152,588 $399,002,316 $605,536,783
15 $275,311,598 $431,444,958 $367,082,131 $575,259,944
16 $253,286,670 $409,872,710 $337,715,560 $546,496,947
17 $233,023,736 $389,379,075 $310,698,315 $519,172,100
18 $214,381,838 $369,910,121 $285,842,450 $493,213,495
19 $197,231,291 $351,414,615 $262,975,054 $468,552,820
20 $181,452,787 $333,843,884 $241,937,050 $445,125,179
21 $166,936,564 $317,151,690 $222,582,086 $422,868,920
22 $153,581,639 $301,294,106 $204,775,519 $401,725,474
23 $141,295,108 $286,229,400 $188,393,477 $381,639,200
24 $129,991,499 $271,917,930 $173,321,999 $362,557,240
25 $119,592,179 $258,322,034 $159,456,239 $344,429,378
TOTAL $9,683,411,849 $12,785,836,419 $12,911,215,799 $17,047,781,892
BUYOUT? $3.08 $4.92 $4.70 $7.15
NPV minus capex divided by 421M shares x 25%

Join the conversation about Copper Fox Metals Inc.

Reply

Replies

  1. First things first. These numbers don't represent the new IRR very well. The 5 year start up has 35.6% higher value due to the grades. The grades over the next 10 years are also higher due to stage 2 of the deposit. I don't have a good number for that because of the recovery amounts. A lot of our price is due to the higher grades. Remember that Teck has us as .47% average. That was then. Next, the new layout and the port facility give us a 80 million a year savings. We truck higher value concentrates to a fixed cost port. This reduces operating costs. Also, the capex given is just too high. The new design for inter transport and the mill site with roads and power should keep this below 4 billion. There's actually a long list of refinements that effect the public numbers.

    Then we have to take into account that there is much more in the ground than on paper. I've said this before. We drilled up too much for a single mine life. So at what point is the size no longer a consideration. At 50 years the NPV is worth nothing and they know they have at least that much. So do we give it away for free? This method of calculation just doesn't work in this scenario. These numbers also only cover the resource estimate drilling. What about the Discovery Zone? Free? The only way to work this out is by taking a mix of NPV for 2 zones and blend it with the real world method. The huge uncertainty has to be factored in. Suppose the discovery zone is sold to another major for 400 million?

    The other thing these number miss is that we have to produce this from the perspective of Teck. That does not take into account our view. Our view says we get carried financing, Liard interest, 24% of the profits and a 350-400 million prepaid head start on the mining development expense to name a few item. Now toss in anything else on our lands and the road bed we own and the port facility etc. Add to this that we are the key that unlock Galore.

    Now if they would just drop the paper we could stop guessing and know.

    1. I agree with everything you wrote there. Also CUU has the ability to bring Galore Creek's operating costs down so another great value in case the buyer lined up for Nova's stake not only wants in on CUU but buy the 50% of Nova... that would bring more profit for Nova's stake, unless teck buys back nova's stake plus all off CUU.

    2. Lots of good questions Webgogs, and I think what you point out well here, is that there are 101 variables that could affect the capex, our asking price, and our negotiations with Teck ultimately. Way too many moving parts in this equation for anyone to actually get a precise read and number on it, especially without the BFS or really intimate knowledge of the area and CUU's possible options. Once the BFS comes then we have an idea for Liard/Paramount.

      You mention, "Next, the new layout and the port facility give us a 80 million a year savings." How do you figure on such a precise number and savings? Did they mention some of the new layout already or its cost savings? Elmer talked about the increase in costs if we had to truck the concentrate to Vancouver for example, but I don't think this was ever the original plan for shipping, to go through Vancouver. They made a really bright move pre-reserving the port facility in Stewart.

      You also mention, "The new design for inter transport and the mill site with roads and power should keep this below 4 billion." You must know something I don't here. I keep hearing about capex going up, including TetraTech feasibility studies (250 studies globally this year) and it will be interesting to see how far the refinements go in mitigating this trend. I will be amazed if we keep it below $4 billion, especially with a substantial increase in tpd. But then again, quite a few here and in management think it can be done still. We'll see soon.

      My only certainty is that we're substantially undervalued at present. Bring on the BFS ... hmm, think it will hit 1000 downloads the first day on SEDAR? I'd expect so - should make a nice splash in junior markets that are starting to see some more investment but still sucking wind big time.

      1. Chops. Unless the claims by WEbgogs can be backed up with fact, I suggest it's just an IMHO statement. No offence intended here WG,.,
  2. Thanks for sharing your calcs Chops. I think you need to account for the level of production and the life of the ore body . You have 150 ktpd and 200 ktpd operations lasting 25 years on the same, finite ore body. If you use the total 1.228 B tonnes in the M+I of the RE, the 150ktpd operation would last 22.75 years; the 200ktpd operation would last only about 17 years.

    That shaves off a bit of totals. The metal recoveries are also quite important. From the 2012 RE:

    Cu Recovery rate0.865

    Mo Recovery Rate0.609

    Au Recovery Rate0.733

    Ag Recovery Rate0.580

    At my former employer... we call the move I just made 'the seagull' (think of someone that swoops in on someone elses's work, makes a bunch of noise, sh1ts all over it, and flys away....)

    ;)

    1. Thanks, Chappy and Chops, for doing the heavy lifting on the numbers for us while we wait.

      Just curious here, even though the Rhenium appears in trace amounts, does it contribute to the overall econcomics of the project? Will there be any Rhenium consideration in a buyout situation?

      Cheers, SF

      1. I read this in the article I posted earlier on Metals. Pretty hard to put a number on Rhenium at this stage.  Rhenium (Re): This metal is rare and expensive and does not form its own minerals. Rhenium is obtained as a by-product of molybdenum refining.
      2. I have never heard anyone from CUU management discussing rhenium in a serious manner yet. Maybe some one else has? It will be linked to the molybdenite concentrate and is recovered during the roasting of the concentrate. You can get up to 70-80% recovery rates. Not sure how to put a value on this, but I am sure the Chinese will like it.

        1. Oh and I forgot to mention that reference to Rhenium is no-where to be found in the new resource estimate update from May; what ever that suggests.

          1. I guess it was probably more efficient to leave the Rhenium numbers out as it would of only added a delay in making final calculations...We can take the Rhenium as a possible free bonus when all is said and done

            1. Replying to @Nav2006

              This is my thought too. The Rhenium would be like going to the cologne counter and getting the shaving kit as a free gift with purchase. Hard to quantify but you are happy when you get it. I agree with Orc that the Chinese will find this attractive.

    2. Good things to take into consideration. How do the numbers change based on your new assumptions? Since its off the last few years I assume that doesn't have as much as an effect as the recovery rates.
    3. Yes Chappy, very rough numbers, and no problem making like a seagull and swooping in! Lol. Just don't steal my french fries at the beach like the birds or my CUU shares ;) It's good to poke at the weak spots in very rough numbers. Yes, I absolutely took a few liberties on the life of mine going from realistic to blindly optimistic, and using some old numbers for actual "metals recovered" as opposed to pounds in the ground.

      I have a few other ways I've calculated rough numbers and will post later when I have more time, but a few questions I'm pondering in the meantime:

      1) Will Teck give us much credit for "inferred" resources or just "measured and indicated"? Paramount being open at strike in a few directions and depth may give us a little negotiating room.

      2) If we calculate 7B (M, I) or 10B (M, I, I) lbs of Cu, produced for $0 because of other metal credits, there is a big difference between the 7B or 10B when calculating NPV. Again, I'm a bit optimistic here because I'd think Teck figures they can increase our measured, inferred and indicatd in Paramount, even with a .865 recovery rate. There must be something to gain from Mike and Discovery too because they are nearby and should show some mineable mineralization, but again this is a wildcard so would be heavily discountd compared to what is drilled. 7B x $3.00 lb = $21B (which then needs to be discounted over the life of the mine and used to pay back the capex). 10B lbs? At $3 or $3.25 a lb?

      3) CAPEX: why so high in my mind despite protests from management otherwise? The PFS had a capex of 3.7B in 2008. Add 10% for inflation the last 5 years, and 10% to get to 150,000 tpd from 100,000 tpd and that is $4.44B. On a 200,000 tpd operation I've added another 10% costs and rounded up a little to $5B. If they keep it at or below $3.7B I'll be amazed, especially when they are going to increase the tpd - as far as I know, mining equipment and installation has not gotten cheaper the last 5 years so even redesigns can't offset this. The higher capex is more than worth it however to up the tpd. Without question in my mind, especially if we have a higher grade starter pit like Elmer has tried to show.

      I'll leave it for now ... so many way to look at this. I go in circles and really want to see the BFS to learn something about how the value this deposit :)

  3. Thanks Chops! I am really hoping that they have found a way to get up to that 200k tpd number as you can see the impact it has on the economics.

    At the end of the day, CUU is just so difficult to value. I am not sure if or how ES and EE have determined a price. I just hope there is someone out there willing to pay it. Preferably soon.