NPV is Deceiving Perhaps

So we have two bottles of Amarone (1997 excellent Italien wine). One bottle is half full and one is full..identical glass bottles, same spout! Turn both bottles upside down. If the one-half bottle empties in 20 years it is worth $500 million. The full bottle will empty out 1/2 in 20 years..that makes sense since the spout openings are the same. Because of mathemetics, both bottles are worth the same, since it seems that anything coming out after 20 years is worth nothing (due to the present value of money theory).

Now that is the BFS model as outlined by CUU. So the bashers win 100 cudo points. The question is : can another spout in the full bottle be opened/created so we can get that full bottle out in 20 years? Can we upgrade the wine? Or if you are a wine collector, you may want wine for not only your lifetime but for your grandchildren. Teck has to decide now if it wants to pay the price now for an eternal supply of wine.....

or perhaps we have to turn 10 bottles (one-half full) all at once? i.e. create more capacity!!

OK, now my turn to drink good wine! have a great weekend!!

Join the conversation about Copper Fox Metals Inc.

Reply

Replies

  1. I'm interested in why we're not starting out with +180k tpd ... still doesn't make sense to me, but since we basically excluded the inferred from the BFS, the mine life wouldn't be very long. Even our EAO application speaks about a 150k tpd operation. Perhaps there will be some alternative cases in the BFS summary when the 300-400 pages gets filed on SEDAR.

    That's not to say that Teck wouldn't start with 180k tpd or more ... just our plan so far is for less. Teck's copper literature usually just counts Proven/Probable and Measured/Indicated (see 2012 presentations) ... there has to be "some" value for our inferred. This is a big question mark, and the inferred is not being factored in at present in the study. I'd like to know, what's up with the rest of the inferred (besides the 171m t). How much more could be moved to indicated, at what price to drill, and what would this do to the economics of the project?

    Looking forward to getting more of Elmer's thoughts on these matters when he's back from holidays. Seems like there is more metal to be squeezed out of Schaft Creek (not taking into account the targets we haven't touched yet). We've got 10 billion lbs in the Agoracom CUU header, but are only counting 4.8 billion for the BFS.

    1. I'm interested in why we're not starting out with +180k tpd

      That's a good question chops. However under the agreement with Teck I believe the minimum required was for just 65t/day operation. With such a large deposit, it would be negligent if they didn't do some economic analysis for much larger operations in the BFS. A higher thoughput would no doubt do wonders for our NPV if the increase in capex was marginally smaller. Let's also not forget that the mineralization in just the Paramount zone is still open at depth and also in all directions. So we could be looking at an additional 200-300M more tons on top of the inferred making SC as big as 2B tons and lasting 50+ years.

  2. All I know is that by the time I figure out what you are saying, my wine bottle will be less than half-full....and then it will not matter.

    glta you longs

    1. Great analogy. Never thought of it like that but yes using NPV method to evaluate a multidecade deposit doesn't seem to do it justice. That's why imo, Teck will look at the whole deposit, plus potential district to come up with a fair offer.

  3. Isn't that the whole point of the ROV method? It takes into account the long mine-life and the "money at the end of the years"? Though I don't fully understand ROV, I think that's the intention.