Re: ..Who is selling?
Posting too much tonight,
The trade off calculations are likely done for a 180,000 tpd mine (I am pretty sure of that but have no direct knowledge).
Also this could be why there is an extra year pre-construction (5 instead of 4) so Teck can optimize though I doubt anyone would admit it.
I don't think there is much needed and Teck will be the ones doing it not cuu though I would love one more year of CUU at Schaft Creek.
Join the conversation about Copper Fox Metals Inc.
Reply