Re: TECK

I don't know that that is true. I don't see why CUU could not begin the drill program for teck on the 171 mil tons. Then Teck could pay for the drilling if they chose to back in and phase in to running the project.

CUU needs to keep rolling. They can't just stop they need to keep adding value to the project. Even if Teck backs in they will want to improve the economics of the property and possibly drill out new zones to attract more value when they sell.

Just my thinking.

Join the conversation about Copper Fox Metals Inc.

Reply

Replies

    1. Can you elaborate, that is a little odd that they would say that unless of course they are talking about Arizona

      1. I didn't ask as i was so angry at the share price.I was talking about the inferred in the starter pit at the time though so asummed he ment at schaft creek
    2. I'm puzzled that you're the only one to have been graced with this information. But maybe I've missed something. Have any other callers heard this?

      1. I am wondering the same thing. If CUU is infact planning a SC drilling season would that not be pretty important material change? BFS to Teck 45 days max = 31 Jan 2013 then Teck has 120 days tp make a decision = 3 Jun 2013. If they are planning any drilling that could cause some interpretation that Teck may not be our savior.

        Hopefully someone can clarify the drilling issue

        GLTA

        1. BFS to Teck 45 days max = 31 Jan 2013 then Teck has 120 days tp make a decision = 3 Jun 2013.

          Drilling at SC starts in early June (see NR below)

          http://www.copperfoxmetals.com/s/NewsReleases.asp?ReportID=459852&_Type=News-Releases&_Title=Copper-Fox-Commences-2011-Drilling-Program-Updates-Other-Activities-at-Scha...

          And I don't expect the BFS to Teck to go beyond next week. So the 120 days brings us in May, perfect timing.

          At that point we'll know what Teck is doing (and I don't think we'll find out in 120 days).

          I expect Teck to take us out but if they back in great. We'll be using their money for the ''Inferrred to Measured'' program while buyers line up. And we wait for our EA.

            1. Replying to @JohnnyAugust

              The link for NR re drilling in June is from May 2011? I cannot find any NR stating a 2013 drill program?

              I know. I was giving an example as to when CUU normally drills. The point was to show that we have time for the Teck decision before the drills turn.

  1. Exactly

    This ain't over until the fat lady sings

    I continue to believe we screwed up once (stopping the drills), assuming they would have drilled the "waste", which I am not sure was the plan, but assuming all those years of "experience" were applied, they sure should have known how weak the BFS would be with thal level of non-countable inferred in the pit per 43-101 rules

    I thought that was why you had a Qualified Person, and we have certainly been proud of ours, so far...

    As far as updating the BFS, there is no need to revisit that, IMO

    Any additional results could be put on the table for inclusion in any negotiation at any time, same with the EA or any other activities

    The BFS is complete

    It met the stated criteria

    Assuming Teck concurrance with the PR constitutes their approval, a fact of which I am not sure, their Salazar stipulations have all been met

    There is no need to include anything else in the BFS to meet that agreement

    Any additional findings will simply enhance the economics and our negotiating position

    Why I can't see EA work with drilling targets begging for action

    1. I believe a completed EA allows them to change the assumed interest rate for the cost of comstruction from 8% to 5%, which would also improve the project economics, possibly as much or more than converting the waste to resources. Of course that is no excuse for not drilling those 10 holes last Summer.