Skip to content
Sign in

Post

Copper Fox Metals Inc.

Mail Room1.5 rating from 12 members26 ptsRate

Timing of CCY and CUU...

So Teck is on the clock with CCY and the deadline is March 3rd to earn 60% interest in the La Verde project.

CUU February 4th FS, add 30 days so March 6th we should hear from Teck on their acceptance of our FS.

Is there a play here to be made? I am thinking selling some CUU (at a loss), put it into CCY, hope for a good gain and re-enter into CUU. Anyone else thinking this way?

I do not know too much about the CCY situation but I see that Accountant007, Liddy, and a few others have invested in CCY.

Thoughts, comments would be appreciated!

Thanks and GLTA!

Join the conversation about Copper Fox Metals Inc.

Reply

Replies

  1. I had a good look at CCY about a year ago and did hold some paper for a while but sold it at 9cents or so.

    The have a good sized deposit, great infrastructure and a compelling SP/Market cap and probably a number of other solid points that Accountant could probably list off readily.

    My concern with CCY is Greenslade and his record with BAJ. Some of that M.O. is demonstrated in the fact that his daughter, Denby, currently serves as CFO but only holds a BA in Communication. She's hardly a silverback of the accounting world and her position appears to repeat the nepotism that Mr Greenslade demonstrated at BAJ before he presided over its huge fall from grace.

    There isn't much exploration upside there. They have the two deposits/zones in Mount La Verde and they appear to be largely drilled out. There is a big geophysical anomally just south of the little mountain but it is overlain with flat, rather prime farmland with lots of little parcels. That geophysical anomally would be hard to develop without expensive and politically sensitive conversion of that farmland.

    Another concern is the arsenic (and maybe other deleterious contaminates) in the concentrate. The reports i've read haven't really put a pin into those problems and a recent director added to the board was likely picked due to his expertise in this kind of metallurgical problem. Any of these kinds of contanimates ellicit a penalty at the smelter which severely impacts economics of the whole deposit. Also, the word 'arsenic' ellicits a good point of contention for local stakeholders and environmentalists. Much of the local water supply (a canal) is litterally right at the toe of La Verde and a river is not much farther away.

    Those 3 concerns really put me off of CCY and I would suggest putting some dd into those issues. As I said, I haven't looked closely at more recent developments so some of the above might have shifted.

    jmho

    1. A friend asked me recently about CCY and I finally had a closer look at their PEA. I urge folks to have a look at the mine plan and plans for storage of waste rock and tailings in section 18.1 at page 129 and read the text in those sections.

      http://sedar.com/FindCompanyDocuments.do?lang=EN&page_no=1&document_selection=0&industry_group=A&FromMonth=01&FromDate=01&FromYear=1999&ToMonth=01&ToDate=01&ToYear=2015&Variable=FilingDate&Search=Search&company_search=catalyst+copper

      These are pretty ambitious plans in that they propose to cover productive farmland with waste rock and plug up at least two stream canyons with tailings inside 6 dams right adjacent to the town of Zamora (the town is the dense grid of green lines(roads) near the top of Fig 18.1). On top of the concern of filling two streams with tailings, CCY doesn't own any of the land for the tailings.

      There are a few photos on Panoramio of the stream. Here is one at the very south of the planed TSF's where the two streams meet: http://www.panoramio.com/photo/8335873?source=wapi&referrer=kh.google.com

      This seems to be a lot of enviro issues for a 20 year mine with little exploration upside. It would appear that no local stakeholder consultation has been completed either.

      One would have to ask themselves if Teck would make it's first big step into Mexico by proposing to make this big of a footprint (enviro and politically) and if this plan is indeed achievable.

      jmho

      1. I also remember reading about the tailings area not having been purchased, which coincided with Frank Giustra (large shareholder) talking a couple months ago about personally purchasing farmland in Mexico that he thought was a good investment.....wink wink nudge nudge

        SB2

      2. Thanks for sharing your input for the mining side of things for CCY, Chappy.

        I bought a little a while ago, thinking today would get a nice bump but Teck let CCY go for the time being so we'll see.


        Some shareholders think this is good news that CCY could make deals with others now and others think because Teck effectively passed that other majors will too.

        Hope for some short-term bounce and perhaps get out and back into CUU while it's in the 80 cent range.

        Thanks again, cheers.

  2. I am only loosely following the CCY story but I can't see how Teck taking a pass on the La Verde project can be construed as a good thing. Teck only needed to spend $20-40M or so to take out the project but instead elected to sell its remaining interest. CCY may well garner full control of the deposit but its ability to raise money in order to do so is in question.

    Under one option, CCY can buy out Tecks interest with $12.5M in cash and $12.5M in CCY stock. The stock part of that deal would cost CCY 250M shares at current CCY sp.

    I dont' know what would happen at the end of 180 days and CCY doesn't come up with the cash or cash+stock. Teck can then elect to buy La Verde but if they are interested, why wait 180 days for CCY to buy Teck out??

    I've already laid out my thoughts on the significant issues with the La Verde mine plan (prior posts in this thread).

    I've been watching the CCY board on SH and not one single person mentioned any issue with the waste rock/farm land and tailings/river+ community issues with the mine plan. Everyone is fixated on the economics of the preliminary plan without looking at how feasible that plan really is. With CUU, I think we have a near opposite problem. We have a sound mine and waste plan but the economics (base case anyways) aren't so shiny. I wonder what CCY's economics would look like if they factored in the acquisition of the farmland and river valleys for waste and tailings, not to mention the political aspects of the arsenic, farmland, and water quality in a small rural community.

    Today's NR from CCY:

    Catalyst granted option to purchase La Verde project

    Trading Symbol:CCY

    VANCOUVER, April 11, 2013 /PRNewswire/ - Catalyst Copper Corp. (TSXV: CCY) (the "Company" or "Catalyst") announces that, further to its Press Release dated March 4, 2013, Catalyst and its wholly owned Mexican subsidiary, Minera Hill 29 S.A. de C.V. ("Minera Hill"), have entered into a Purchase Option Agreement dated April 9, 2013 with certain subsidiaries of Teck Resources Limited ("Teck") pursuant to which Catalyst has an option to indirectly acquire Teck's interest in the La Verde property (the "Purchase Option"), subject to TSX-V approval.

    Under the Purchase Option, Minera Hill has 180 days from April 9, 2013 to acquire Teck's interest in the La Verde property by paying to Teck, or to its order, the sum of (a) an amount equal to all expenditures incurred by Teck in regards to the La Verde Project from January 2, 2013 to the day immediately prior to the date Catalyst exercises the Purchase Option (the "Exercise Date"), plus either (1) making a cash payment of US$20 million to Teck; or (2) making a payment of US$25 million to Teck in a combination of cash and shares (of Catalyst), provided that at least 50% of this consideration is in cash, with the remainder of the consideration paid in shares of Catalyst; provided that Teck's ultimate shareholding in Catalyst does not exceed 19.9%,post issue. The Purchase Option Agreement provides that if Catalyst does not exercise the Purchase Option, the date Teck may elect to invoke its option to increase its interest in the property from 40% to 60% (the "T-1 Option") will be extended to the date that is 181 days from April 9, 2013. If Catalyst exercises the Purchase Option, the T-1 Option expires on the closing of the purchase of Teck's interest.

    About La Verde

    La Verde is located in an area with excellent infrastructure: Power, rail and water. Lazaro Cardenas, Mexico's third largest port on the Pacific Ocean is 180 km from the site. Significant upside potential remains for the two known zones of porphyry style copper, gold and silver mineralization as drill programs have shown both deposits remain open to depth and along strike.

    ON BEHALF OF THE BOARD OF DIRECTORS OF
    CATALYST COPPER CORP.

    "John W. Greenslade"

    John W. Greenslade - President, CEO (Director)

    Certain information set forth in this news release may contain forward-looking statements that involve substantial known and unknown risks and uncertainties. These forward-looking statements are subject to numerous risks and uncertainties, certain of which are beyond the control of the Company, including, but not limited to, risks associated with mineral exploration and mining activities, the impact of general economic conditions, industry conditions, dependence upon regulatory approvals, and the uncertainty of obtaining additional financing. Readers are cautioned that the assumptions used in the preparation of such information, although considered reasonable at the time of preparation, may prove to be imprecise and, as such, undue reliance should not be placed on forward-looking statements. Neither TSX Venture Exchange nor its Regulation Services Provider (as that term is defined in the policies of the TSX Venture Exchange) accepts responsibility for the adequacy or accuracy of this release.


    SOURCE Catalyst Copper Corp.


    Source: PR Newswire (April 11, 2013 - 9:54 AM EDT)