Improvement Opportunities

1. Upgrade the Waste Rock

This improves the NPV 8% from $513M to $927M using my rough calculations here.

2. Improve the Recoveries

I have no idea what type of improvements are possible. Assuming a 1% improvement in each metal, the NPV 8% goes from $513M to $636M.

3. Get Value for the Rhenium

With the assumptions in the feasibility study, the rhenium could potentially produce an extra $24.6M in revenue as I showed here. However, the additional cost of shipping to a capable roasting facility as well as the additional roasting costs likely mean the rhenium won't add much value, if any at all. Assuming we get $5M in extra profit from the rhenium, the NPV 8% improves from $513M to $549M.

4. Expand to 180,000 tpd

This is a tough one to put a number to. An expansion to 180,000 tpd increases capex, decreases mine life, and increases annual cash flow. This likely will result in an improved NPV on paper, but from a practical standpoint it doesn't seem to make sense at this point.

5. Reduce the capital and operating costs

I don't think there is much room for improvement here. The Merit review likely brought costs down as low as possible.

6. Shorten the Development Timeline

Again, I don't think there is much room for improvement here. Even if we did reduce the development timeframe by a year it would have a minimal impact on the economics. With Copper Fox currently in charge of the schedule we need all the time we can get.

Combining 1, 2, and 3 results in an improvement of the NPV 8% from $513M to $1044M. These numbers are all very rough estimates but it gives a good idea of the impact of various improvement opportunities.

RabidTiger

Copper Fox Metals Inc.

Waste Rock Calculations

I decided to crunch some numbers after reading through the feasibility study. The 171M tonnes of waste rock is enough to feed the mill for 3.6 years (assuming it's mineralized). To be conservative, I'm going to round this down to 3 years. The waste rock is worth $25.13/tonne a...

Join the conversation about Copper Fox Metals Inc.

Reply

Replies

  1. If they changed the agreement incentives from 12%NPV for a 12 year, 25,000tpa project to an 8%NPV for a 15 year, 50,000tpa project

    What should an appropriate NPV be for a 130,000tpd mine with a 21 year life?

    1. Some things are getting mixed up.

      First, the Agreement sets out minimum copper metal production per year. Folks are confusing things with bulk ore production per day. (i.e. 150K tonnes per day).

      The Agreement gives out a mininim amount of copper metal production for the FS to consider in the NPV calcs (5 b(i) is 25k tonnes per ANNUM, 5b(ii) 50k tonnes per ANNUM. The mine life is also a minimum. Exceeding the minimums isn't any reason to assume that we can play with the other paramaters of the Agreement without sitting down with Teck. We'll be producing between 232 and 274 MILLIION pounds per annum.

      Second, per Agreement: ..."lf Teck Cominco does not give any notice as aforesaid, then any report that satisfies §5.5(b)(ii) will be considered a Positive Bankable Feasibility Study." As far as we know, Teck hasn't given any notice on the 'aforesaid' (all the above in section 5.5). We satisfied §5.5(b)(ii). Therefore, the FS should be considered "a Positive Bankable Feasibility Study".

      The annoying "30 days" issue comes out of §5.5(b)(i) and the paragraph below §5.5(b)(ii). Since there is no reason to think that we were $1 NPV(12%), the 30 days should not apply. I don't know why management and Jason let the 30 days creep into the discussion at all - unless there was a "notice" from Teck that we don't know about.

      I'm inclined think that there is a 30 days since Jason said so in writting about a week ago - after the folks at the VRIC reported there discussions with management and a big 'no' to the 30 days. Where would Jason have got this from? I dont' think he made it up. Maybe the flu fuzzed his thinking on the subject but he seemed quite clear on his pronouncement. Now management appears to have clammed up on the subject all together AND we don't have any word on our Liard Shares.

      1. Teck better accept the BFS as bankable or else, all that "one chance to deliver a perfect BFS, got to do it right the first time" is a big crock of bullxxxx! I would also question what Jim Gray, Matt Bender and Tetra Tech were all doing?? Playing Texas Hold 'em? IMO No, TT was Teck's choice for their BFS. Teck absolutely have to approve the BFS as bankable.

        1. 232 000 000 pound (advp) = 105,233 metric tonnes = 116,000 short ton = 103, 571 long ton = a big whack of copper by any measure plus the 3 other metals on top of that.

        2. Yup, thats a long ton

          116,000 short (US)

          105 223 metric

          I'm guessing that we use the long ton in the FS, although it is spelt as tonne which is techically a metric tonne. Weird mix of measurments in the FS though, acres, hectares, total oz of silver and gold, then the silver and gold is produced in grams per tonne. Never noticed it before, I must be Canadian :-)

          1. "...Weird mix of measurments in the FS though, acres, hectares, total oz of silver and gold, then the silver and gold is produced in grams per tonne. Never noticed it before, I must be Canadian :-)"

            If the US is not so stubborn, we would all be metric by now, like the rest of the world! We'll be using grams, KG, metric tonnes, hectares etc! (Although the conversion from acres to hectares would be a bit tricky with all the grids in miles.) Just saying!

      2. I'm inclined think that there is a 30 days since Jason said so in writting about a week ago -afterthe folks at the VRIC reported there discussions with management and a big 'no' to the 30 days. Where would Jason have got this from? I dont' think he made it up. Maybe the flu fuzzed his thinking on the subject but he seemed quite clear on his pronouncement. Now management appears to have clammed up on the subject all together AND we don't have any word on our Liard Shares.

        That's why I said last week. How do we really know, when the story keeps changing. :)

        1. There is hopefully more going on than it appears. The delays and misinterpretation may be to give Teck time to say yes. Could be that if we go pushy and legalistic they would push back?

          I'm hoping now for a back in. Get some cash, let Teck get the mine started, let us drill a bunch more holes to improve the value of our 25ish% and prove up the rest of the district and get the real value out.

          With Teck backed in SP should soar....

          One can only hope....

      3. I did notice the measurement differences, but didn't think it was too important in light of the point I was trying to make

        That being that given the evidence of the 2 scenarios set out in the option agreement, the 12%NPV versus the 8%NPV and the reason for their differences, ie size of mine, where does the property that dwarfs these examples fit in that valuation logic

        It simply doesn't

        Not sure if the NPV assumptions in the original agreement, which was drafted and presented by Salazar to Teck for approval, were typical of how such deals were structured then or not

        In retospect though, our facts simply cannot logically be aligned with what they were seeking nor their valuation model

        As you pointed out the actual copper production, defined in our BFS, and that would be subject to the NPV formulations doesn't match their models, not to mention the added multiplier of the copper equivalent exercise to account for the PM's and moly

        So again, if they drop the required NPV from 12% to 8%, for going from a mine producing 25 to 50 tons/annum, and from 12 to 15 years

        What should an appropriate NPV be for an approximate 110 tons/annum copper mine with a 21 year life?

        (and sufficient PM credits to cover the cost of the operation)

        1. I don't think we'll ever agree on this but here goes...

          The contract gives minimums. We exceeded the minimums. We exceeded them by a lot. The contract gave no upper bound on any of those parameters so I can't see how we could think that we would get a different treatment -within the Agreement - by going with such high production. It wouldn't be the first time we found fault with the Agreement.

          One other way to look at it, for the 12%, we probably would still not have met it at the level of the production in §5.5(b)(i) at 25k tonnes per annum. That's an educated guess. Just as we are seeing arguments to go to 180 ktpd mining production to boost economics, rolling down production to the 25k tonnes of copper production (about 1/3 of our 130,000 ktpd mining production) would probably not result in a very good number. Less revenue combined with the high 12% discount.

          Maybe RT could shine a light on that kid of scenario.

          I dont' even think that interest rates in 2002 were really that high but they were higher than our near 0 rate now. US Prime charged by banks was 4.67% in 2002.

          It is plausible that both parties have found a mutual interest in putting the Agreement aside and exploring new ideas together but apparently we are only in 'discussions' (lol!). The info coming out of management from folks calling in is that they are not holding teck's feet to the fire on the 120 days nor the Liard shares. There has to be a reason for that.

          jmho

          1. "rolling down production to the 25k tonnes of copper production (about 1/3 of our 130,000 ktpd mining production) would probably not result in a very good number."

            Yep, an NPV somewhere near -$150M.

          2. The info coming out of management from folks calling in is that they are not holding teck's feet to the fire on the 120 days nor the Liard shares.

            Thanks for that intel Chappy ... I just hope the lack of heat-treatment is within reason. Three boys; all playing hockey and I'm guessing I'm not the only non-charity on the board. :-) Can't get behind too much beyond the 120 days. Act or walk! Investors are gettin' restless (and I realize that means absolutely squat - just sayin').


            1. Replying to @darpa1

              I agree. Dates are put in these agreements for good reason. It doesn't say late summer or around valentines - it says 120 days! Also, the agreement states that the feasibility needs to show at least a NPV of $1 to be bankable. Does that mean our 25% would only be worth 25cents in that scenario? No.....which is why the NPV doesn't matter a rats ass, as has been discussed, this will be evaluated other ways to get at the real value.
          3. I don't see any disagreement

            I was asking a rhetorical question

            I was responding to someone suggesting that we should negotiate for a 5% NPV

            There is no other factor that can be used

            My druthers would be to not even use an NPV in the negotiations

            The actual life of our project deoes not lend itself to discounting methodoligies IMO

        2. I did notice the measurement differences, but didn't think it was too important in light of the point I was trying to make

          That being that given the evidence of the 2 scenarios set out in the option agreement, the 12%NPV versus the 8%NPV and the reason for their differences, ie size of mine, where does the property that dwarfs these examples fit in that valuation logic

          It simply doesn't

          It may well be that this is what the delays are about. The Schaft Creek portion and our BFS may not be the best way to handle the size of this as well as the unproven potential of mineralizing at depth which has been theorized. So how does Teck value this fairly? How do we proceed from here, maybe there is a role for use in the JV partnership, but still to explore and prove up the rest. But we need some cash on the table ….

          There is definitely a mine here and a much bigger one than anyone realized when the Salazar agreement was drafted. IMO

      4. chappy - well summarized and the difference between there being and not being a 30 day 'Teck review' period could represent a HUGE difference in the immediate and short term. PLEASE let there be NO 30 day review! ... or let us not see or hear anything from Teck within 30 days of Dec 24 2012 (unless it's a Schaft Creek buyout for >$5 for example).

        1. That brings up another debate: when exactly did the clock start if it is ticking?

          Our NR was Dec 21st. Darpa mentions Dec 24th (the day of the FS convference call). We posted the FS summary on Feb 4th and NR'd that we had delivered it but it sounded a bit like past tense to me (i.e. we had delivered it at some time before Feb 4th) and that discussions were already under way. However we should have got word of the delivery of the "Feasibility Notice" in §5.4. and some word about the Liard shares. nada.

          Feb 4th:

          ...The Company has delivered a copy of the completed positive Feasibility Study to Teck Resources Limited ("Teck"). Teck is reviewing the Feasibility Study and is discussing with the Company its earn back options available under the "Teck Option Agreement" dated January 1, 2002...

          ....Mr. Stewart stated "The filing of the positive Feasibility Study and commencement of our discussions with Teck related to its earn back rights are significant milestones for the Schaft Creek project. We look forward to these discussions regarding Teck's possible future involvement in the Schaft Creek project.

      5. The annoying "30 days" issue comes out of §5.5(b)(i) and the paragraph below §5.5(b)(ii). Since there is no reason to think that we were $1 NPV(12%), the 30 days should not apply. I don't know why management and Jason let the 30 days creep into the discussion at all - unless there was a "notice" from Teck that we don't know about.

        Exactly

        In fact, I don't think the original SEDAR delay had any contractual basis

        And wasn't it a co-incidence how it took us exactly 45 days to get the study delivered...the same as the legal 45 day requirement for SEDAR filing after completion of a report

        Been harping on this for a while, but I think our company is effectively being managed by Teck at this point

        They may wind up giving us what we want

        But there is no one at the store at this time worrying about what our share price looks like because it is not in Teck's interest for us to be trading over .80 cents here

        And it certainly appears to me that no one at CUU currently has any particular interest in improving that optic

  2. Yes, it should have read "compounding" since it was not simple addition. Or "combining the effects" would have made sense too. My bad.

    Actually the BFS did NOT recommend pursuing expansion opportunities. It was Elmer's news release that recommended it. If anything, the BFS recommended against the expansion because of the logistics of starting such a large mine. An expansion to 180,000 tpd will shorten the mine life to 15 years which risks missing out on a commodity boom cycle. (Yes, additional drilling will expand the mine life but the current data is not adequate to produce a feasibility study.) It's also worth considering that major mining companies are shying away from megaprojects because of cost overruns, so 130,000 tpd will look more appealing than 180,000 tpd in the current environment.

    Regarding the economics of 180,000 tpd, it did add 1B to the NPV. However, the capital costs will also increase by roughly 1B so the effect is cancelled out. (KSM's expansion from 120,000 tpd to 180,000 tpd would cost 982M. Ours should be cheaper but I don't know how much cheaper.)

    To summarize, it looks like the expansion to 180,000 tpd could help our economics on paper but it may not make sense from a constructability standpoint. It's not a no brainer decision at this point but it is a good option for us to have.