Show me where bankable and positive...
are defined seperately? The contract does not split hairs there.
Join the conversation about Copper Fox Metals Inc.
Replyare defined seperately? The contract does not split hairs there.
Join the conversation about Copper Fox Metals Inc.
ReplyThe contract does not split hairs there.
This is the sentence in which the concept of "positive" is separated from that of "positive bankable" in an important and meaningful way.
If the report is positive under 5.5(b)(ii) but not under 5.5(b)(i), Teck Cominco may nevertheless elect, in its sole discretion, to deem the report to be a Positive Bankable Feasibility Study.
You have to include the last line where Teck does not issue a notice. It's still deemed a BFS.
What I'm saying is that the contract does not specifically seperate the two. The line you cite is specifically for the determination of which case Teck will consider. The % case does not specify bankability at all.
What I'm saying is that the contract does not specifically seperate the two.
It says this under the definition for PBFS, so part of the definition states that you get a positive feasibility first and then it has to be determined whether or not it meets the criteria for being a PBFS. So there are two states, positive feasibility and then PBFS.
I'm only saying that the contract does make a distinction between the two.
Let's try and figure out why they put that in there
They preferred a larger mine, 5.5(b)(ii)
If they had a larger, longer life mine, as defined in that paragraph, they were willing to accept lower grades as evidenced by an 8%NPV absolute qualifier, as positive and bankable, for purposes of the agreement
But how about if they had a somewhat smaller mine
Maybe one defined per 5.5(b)(i), but it did not meet the 12%NPV
How about we write a sentence that specifies that even if it did not meet 5.5(b)(ii), the automatic qualifier, Teck could in its sole discretion, elect to deem positive, basically whatever they wanted
Exactly what was written in the agreement, and in my simple mind, why it was....
In Section 22.0 of the Economic Analysis in the BFS, there were no mention of using a discount rate of 12%. Table 22.2 Summary of the Pre-Tax Economic Evaluation. Note that the Pre-Tax Economic results used NPV's at 0%, 5%, 8% and 10%. Elmer in one of his conference calls had also mentioned only the 0%, 5%, 8% and 10% rates for the BFS.
There were a total of 13 Engineers who signed off on the BFS. You would think one of them would have questioned the fact that discount rate of 12% was not addressed. You would think Jim Gray, Matt Bender, Cam (who's priority was to rip apart the BFS for accuracy) or the tax company we used to assist in computing this section would have noticed it.
IMO, There must have been an agreement/understanding from everyone involved with Teck, CUU and Tetra Teck, that the 12% issue is off the table. I feel very confident that "bankable" is not an issue to worry about.
The Goldilocks principle
Not too small, not too big...just right
And Elmer would have us believe that if they had drilled they would be required to publish an updated Resource Estimate with all the bother that would entail
Would like for some of the folks more familiar with applicable law to comment on that
If you have recently published an RE, and you continue to explore, and drill additional holes, is it mandatory to publish an updated RE if you drill
You cannot drill without issuing a new RE?
(see naive comment earlier)
There's no mandatory requirement to update. I think the issue relates to schedule. If you drill then you would like value for the data. If it's not incorporated into a revised RE then you can't claim value for a larger resource. That would add time to update the geomodel( probably months). The inferred resource within the pit shell could be upgraded to indicated or measured, which can then be upgraded to proven or probable reserve. But that requires an update to the feasibility study where the resource must be demonstrated to be economically mineable. While I've only been following this story for a month, I gather from a number of comments that adding another 6 months to the release of the feasibility study would be "expletive deleted" unacceptable.
Replying to @explorationguy
Totally agree that the last thing in the world anybody wanted was a further delay in the release of the FS
But I am also sure that the valuation problem for the absence of that material as it might effect the NPV calculation was not unknown, especially considering the protracted amount of time that the BFS had been in preparation
That all the principles knew full well then, as they know now, that in order for this project to advance to production, that material will have to be converted from inferred to M&I
As Chappy has pointed out, that exercise is not a future opportunity, it was a missed opportunity
And given where we apparently are, "in discussions with Teck", I think we should maybe suggest to them and the world oh by the way that billion dollars we left off the plate?
We'll be drilling that asap
Replying to @Metacomet
For better or worse we are dependant on CUU's ability to horse trade at the bargaining table. Even though the drilling was cancelled I would still accrue some dollar value for that inferred resource without deducting the drilling costs since Teck would be paying 100% of future drilling. In fact I would present to Teck all of the same value arguments that would apply to selling CUU's share to any Plan B companies. At some point the casual conversations have to end and then it's time to wheel and deal.
Replying to @explorationguy
we are dependant on CUU's ability to horse trade at the bargaining table.
Yup...
And when I see that we are trading in the 70's and doing nothing, like announcing a drill program, that might bolster that trading position, I get a queasy feeling
Replying to @explorationguy
I would say forget about the 171M waste and move on. If we take Elmer's word for it, that it is all upside and teck will know what value is there, then leave it as that and devote any and all drilling expense, time and effort to adding the most value we possibly can.
I think that value would be found in demonstrating mineralization in Mike, the other undrilled end of Discovery, plus GK, ES, and any and all targets in between. Why trip over the dimes to pick up pennies. I would think proving mineralization in as many of our undrilled zones as possible would be revolutionary to our value; drilling up inferred to a higher resource status - not so much. Plus that would beg for yet another updated RE and then a new FS(?)
BTW. Metacomet, I processed the violation report against yourself (I've also dismissed a few too but that is another story). Debating is one thing, but when folks don't follow or accept your line of reason, is no excuse to declare us all to be naive. Put it this way, if a newbie poster came here and declared that we were ALL naive because we believed such and such, how pissed do you think you and everyone would be? Respect others' right to follow their own course of logic thu this illogical quagmire of an investment. So far very few, if any of us, have been right about anything lately.
Replying to @chappy726
I apologize for quoting you as being among the folks who thought we should have drilled the inferred
My bad
So easy to lose track of what folks actually say or even mean here
Replying to @Metacomet
Copper Fox did say this just yesterday:
Based on recommendations in the Feasibility Study the Company is currently considering programs to enhance the economics of Schaft Creek including:
Replying to @abullion
Agreed Abullion, i'd add though, if a 75% buyout was to occur TCK would have to pay 4X or 12 Million. This on a part of the SC Property that they (I hear?) had some prior knowledge of from their own prior DD.
We also know, that once U materially change the scope& value of a Project, you are legally required to go back to RE & FS Stage and we know how long this can take....( insert yawn here)!
sb
Replying to @Liddy77
But it's too late now and we need to let it go and move on.
And a real good place to move on to would be announcing our plan to drill the waste at first thaw in order to buttress the project economics for the benefit of the operators, whoever that might be
You know, an early plan to throw more on our plate
Is there some reason why Elmer can't/won't do this?
It's not like it would cost any more than distributing a PR
Or maybe for some reason we really don't want to know yet what is in that "waste"
Not sure what the benefit is to us to not know, but it's sorta like how God operates in mysterious ways...