Welcome To the Copper Fox Metals Inc. HUB On AGORACOM

CUU own 25% Schaft Creek: proven/probable min. reserves/940.8m tonnes = 0.27% copper, 0.19 g/t gold, 0.018% moly and 1.72 g/t silver containing: 5.6b lbs copper, 5.8m ounces gold, 363.5m lbs moly and 51.7m ounces silver; (Recoverable CuEq 0.46%)

Free
Message: TNM Cost Overruns article from Jay Collins at Merit.....Good Reading

Vancouver, BC - Northern Vertex Mining Corp. (the "Company") (TSX.V: NEE) announces that a material calculation error has been discovered in the NI 43-101 Mineral Resource Estimate disclosed in the Independent Technical Report authored by Scott E. Wilson Consulting, Inc. and entitled, "Technical Report Northern Vertex Mining Corp. Moss Gold-Silver Project, Mohave County, Arizona, USA", dated October 25, 2012, effective date September 10, 2012 ("Technical Report"). The modeling methodology which was used led to an error which will result in an approximately 50% reduction in the quantity of the previously stated NI 43-101 Mineral Resource Estimates.

Share
New Message
Please login to post a reply