Skip to content
Sign in

Post

Copper Fox Metals Inc.

Prez4.1 rating from 175 members25K ptsRate

Oyu Tolgoi

This mine in Mongolia was just delayed for discussions with the government. The locals are apparently upset about the sparse water and are kicking up a fuss. Mongolia, being a dessert has little water to spare and Rio Tinto wants to divert a river. They were supposed to be shipping their first concentrate today, but neglected to get everyone onboard about the river! I guess they never thought of that.

This is a good article about one mine's struggle for approval:

http://www.bloomberg.com/news/2013-06-20/where-raptors-roamed-rio-tinto-s-copper-dream-stirs-water-worry.html

Join the conversation about Copper Fox Metals Inc.

Reply

Replies

  1. Someone called in to Market Call Tonight to inquire about the wisdom of investing in Turquoise Hill, owners of Oyu Tolgoi. The guest analyst warned the caller to stay away due to the political uncertainty. However, it was mentioned tha the site contains a massive copper deposit the size of Manhattan that could singularly supply the world's copper needs for two years!!!

    Remarkable!


    If they could get their "stuff" together, they're sitting on a gold mine, er, copper mine over there.

    1. That's what the article said that I provided a link to, but it is facing some strong opposition and the government of Mongolia asked them to hold production until they look into the water concerns.:

      The lump of copper ore beneath the brown scrub and sand of Mongolia’s Gobi desert is about the size of Manhattan and contains enough of the metal to meet world demand for two years.

      Rio Tinto (RIO) yesterday postponed today’s scheduled first shipment from the $6.6 billion mine, saying it will start as soon as the government indicates support.

      Rio Tinto’s Oyu Tolgoi LLC unit will use 696 liters of water a second to process ore into copper concentrate for delivery by road to China -- a truck every nine minutes, 24 hours a day.

      The mine’s massive water needs and its overall impact on the environment has raised concerns, including at the U.S. Treasury Department, which makes recommendations to international lenders.

      The Treasury said on Feb. 28 that it wants to be “recorded as abstaining on this project based on environmental policy concerns and legislative mandates.”

      --http://www.bloomberg.com/news/2013-06-20/where-raptors-roamed-rio-tinto-s-copper-dream-stirs-water-worry.html